Bryant 340MAV instruction manual Horizontal Left Tube Configuration

Page 9

PLUG

 

 

CAP

AUXILIARY "J" BOX

 

COLLECTOR BOX

 

 

DRAIN TUBE

 

 

(BLUE AND WHITE STRIPED)

 

 

 

 

 

 

CONDENSATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COLLECTOR BOX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRAP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TUBE (GREEN)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COLLECTOR

INDUCER HOUSING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DRAIN TUBE (VIOLET)

 

 

 

 

 

 

 

 

 

BOX EXTENSION

COLLECTOR BOX

 

 

 

 

 

 

 

 

 

DRAIN TUBE

 

 

 

 

 

 

 

 

 

COLLECTOR BOX

DRAIN TUBE (BLUE)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EXTENSION TUBE

 

DRAIN TUBE COUPLING

COLLECTOR BOX TUBE (PINK) RELOCATE TUBE BETWEEN BLOWER SHELF AND INDUCER HOUSING FOR 040, 060, AND 080 HEATING INPUT FURNACES

A00215

Fig. 10—Horizontal Left Tube Configuration

a.Remove factory-installed cap and clamp from LOWER inducer housing drain connection.

b.Remove and discard UPPER (molded) inducer housing drain tube which was previously connected to conden- sate trap.

c.Install cap and clamp on UPPER inducer housing drain connection where molded drain tube was removed.

d.Use inducer housing drain tube (violet label and factory- supplied in loose parts bag) to connect LOWER inducer housing drain connection to the condensate trap.

e.Connect inducer housing drain connection to condensate trap.

(1.) Condensate Trap Located on Left Side of Casing

(a.) Determine appropriate length and cut.

(b.) Connect tube to condensate trap.

(c.) Clamp tube to prevent any condensate leakage.

(2.) Condensate Trap Located on Right Side of Casing

(a.) Route inducer housing drain tube (violet label) directly from inducer housing to condensate trap as shown in Fig. 9.

(b.) Determine appropriate length and cut.

(c.) Connect tube to condensate trap.

(d.) Clamp tube to prevent any condensate leakage.

3.Relief Port Tube

Refer to Pressure Switch Tubing section for connection procedure.

C.Condensate Trap Field Drain Attachment

Refer to Condensate Drain section for recommendations and procedures.

—9—

D. Pressure Switch Tubing

One collector box pressure tube (pink label) is factory connected to the pressure switch for use when furnace is installed in UPFLOW applications. This tube MUST be disconnected and used for the condensate trap relief port tube. The other collector box pressure tube (green label) which was factory connected to the condensate trap relief port connection MUST be connected to the pressure switch in DOWNFLOW or HORIZONTAL RIGHT applications.

NOTE: See Fig. 8 or 9 or tube routing label on main furnace door to check for proper connections.

Relocate tubes as described below.

1.Disconnect collector box pressure tube (pink label) attached to pressure switch.

2.Extend collector box pressure tube (green label) which was previously connected to condensate trap relief port connec- tion by splicing to small diameter tube (factory-supplied in loose parts bag).

3.Connect collector box pressure tube (green label) to pres- sure switch connection labeled COLLECTOR BOX.

4.Extend collector box pressure tube (pink label) which was previously connected to pressure switch by splicing to remaining small diameter tube (factory-supplied in loose parts bag).

5.Route this extended tube (pink label) to condensate trap relief port connection.

6.Determine appropriate length, cut, and connect tube.

7.Clamp tube to relief port connection.

E. Condensate Trap Freeze Protection

Refer to Condensate Drain Protection section for recommenda- tions and procedures.

Image 9
Contents Safety Considerations Electrostatic Discharge ESD PrecautionsMultipoise Orientations Unit Size DimensionsII. General Installation SafetyVI. GAS Piping and GAS Pipe Pressure Testing Codes and StandardsVII. Electrical Connections Electrostatic Discharge ESD Precautions Applications Introduction General II. Upflow ApplicationsCondensate Trap Tubing Factory-Shipped Orientation Pressure Switch TubingCondensate Trap Location Alternate Upflow Orientation Condensate Trap Tubing Alternate Upflow OrientationIII. Downflow Applications Condensate Trap LocationCondensate Trap Tubing Horizontal Left Tube Configuration IV. Horizontal Left SUPPLY-AIR Discharge Applications Construct a Working PlatformHorizontal Right SUPPLY-AIR Discharge Applications Attic Location and Working Platform Location II. Furnace Location Relative to Cooling Equipment Furnace Location for Proper Condensate DrainageInstallation Leveling Legs if Desired II. Installation in Upflow or Downflow ApplicationsIII. Installation in Horizontal Applications III. Hazardous LocationsOpening Dimensions Furnace Plenum Opening Floor Opening CasingWidth II. Ductwork Acoustical Treatment Duct FlangesIV. Return AIR Connections III. Supply AIR ConnectionsFilter Arrangement Filter InformationVII. GAS Piping VI. Bottom Closure PanelMaximum Capacity of Pipe Casings onlyElectrical Connections Fire or Explosion HazardIII Accessories WiringPCB Direct Venting Electrical DataRemoval of Existing Furnaces from Common Vent Systems II. COMBUSTION-AIR and Vent PipingControl Center Clearance FT COMBUSTION-AIR and Vent Pipe Termination ClearancesCombustion-Air and Vent Pipe Diameter ExampleCombustion-Air and Vent Pipe Attachment Short Vent 5 to 8 Ft System COMBUSTION-AIR Intake Housing Plug FittingAltitude FT Maximum Allowable Pipe Length FT6001 to 7000‡ Air Intake Housing Plug Fitting Drain Vent Extension Pipe Extended Exposed Sidewall PipesTwo-Pipe Termination Kit IV. Multiventing and Vent Terminations Concentric Vent/Air Termination KitRoof Termination Preferred Sidewall Termination of 12 in. or Less Condensate Drain General II. ApplicationIII. Condensate Drain Protection II. Cooling Mode Heating ModeIII. Continuous Blower Mode IV. Heat Pump ModeIV. Adjustments START-UP Procedures GeneralComponent Test II. Prime Condensate Trap with WaterInducer Housing Drain Cap BTU/CU FT Orifice Manifold 625 650 Only 7001 675 725 8000 775 750 15% 825 2001to 725 750 Only 4001 775 800 825 5000 875 850 900 925 Altitude Derate Multiplier Example 100,000 Btuh Input Furnace Installed AT 4300 FTUnited States CanadaCheck Safety Controls Blower OFF Delay Setup PositionGAS Rate CU FT/HR Speed SelectorII. Check Pressure Switch ChecklistCheck Primary Limit Control CHECKLIST-START-UP CHECKLIST-INSTALLATIONLoad Calculation Combustion AIR Vent Piping
Related manuals
Manual 12 pages 2.16 Kb Manual 44 pages 12.97 Kb