Bryant 340MAV instruction manual Combustion-Air and Vent Pipe Diameter, Example

Page 25

TABLE 6—APPROVED COMBUSTION-AIR AND VENT PIPE, FITTING AND CEMENT MATERIALS

ASTM SPECIFICATION

MATERIAL

PIPE

FITTINGS

SOLVENT CEMENT AND PRIMERS

DESCRIPTION

(MARKED ON MATERIAL)

D1527

ABS

Pipe

 

Schedule-40

D1785

PVC

Pipe

 

Schedule-40

D2235

For ABS

Solvent

 

For ABS

Cement

 

 

 

 

 

 

 

D2241

PVC

Pipe

 

SDR-21 & SDR-26

D2466

PVC

Fittings

 

Schedule-40

D2468

ABS

Fittings

 

Schedule-40

D2564

For PVC

Solvent

 

For PVC

Cement

 

 

 

 

 

 

 

D2661

ABS

Pipe

Fittings

 

DWV at Schedule-40 IPS sizes

D2665

PVC

Pipe

Fittings

 

DWV

F438

CPVC

Fittings

 

Schedule-40

F441

CPVC

Pipe

 

Schedule-40

F442

CPVC

Pipe

 

SDR

F493

For CPVC

Solvent

 

For CPVC

Cement

 

 

 

 

 

 

 

F628

ABS

Pipe

 

Cellular Core DWV at Schedule-40 IPS sizes

F656

For PVC

Primer

 

For PVC

F891

PVC

Pipe

 

Cellular Core Schedule-40 & DWV

 

 

 

 

 

 

 

NOTE: The minimum combustion-air and vent pipe length (each) for these furnaces is 5 ft. Short pipe lengths (5-8 ft) may discharge water droplets. These droplets may be undesirable, and a 12-in. minimum offset pipe section is recommended, as shown in Fig. 34, to reduce excessive droplets from exiting vent pipe outlet.

B.Combustion-Air and Vent Pipe Diameter

Determine combustion-air and vent pipe diameter.

1.Using Table 7, individually determine the smallest combustion-air and vent pipe diameters permitted for each pipe. Pick the larger of these 2 pipe diameters and use this diameter for both combustion-air and vent pipes.

NOTE: Select 1 vent pipe connection and

NOTE: Select 1 vent pipe connection and

1 combustion-air pipe connection.

1 combustion-air pipe connection.

AIR

 

 

 

 

COMBUSTION- FLOW COMBUSTION-

 

 

 

AIR

AIR

VENT

 

 

VENT

 

 

 

VENT

 

 

 

 

 

VENT

 

 

 

 

 

COMBUSTION-

COMBUSTION-

 

 

AIR

AIR

AIR

 

 

 

 

 

 

 

FLOW

 

UPFLOW

 

DOWNFLOW

 

 

 

 

COMBUSTION-

COMBUSTION-

 

 

AIR

 

 

 

 

 

AIR

 

 

VENT

 

VENT

 

 

 

AIR

AIR

FLOW

FLOW

HORIZONTAL-LEFT DISCHARGE

HORIZONTAL-RIGHT DISCHARGE

A96187

Fig. 33—Combustion-Air and Vent Pipe Connections

—25—

2.When installing vent systems of short pipe length, use the smallest allowable pipe diameter. Do not use pipe size greater than required or incomplete combustion, flame disturbance, or flame sense lockout may occur.

NOTE: Do not count elbows or pipe sections in terminations or within furnace. See shaded areas in Fig. 36, 37, 38, 39, and 40.

EXAMPLE:

An 036080 size furnace located in Indianapolis, elevation 650 ft above sea level, could be installed in an application requiring 3 elbows and 32 ft of vent pipe, along with 5 elbows and 34 ft of combustion-air pipe. Table 7 indicates this application would allow a 2-in. diameter vent pipe, but require a 2-1/2 in. diameter combustion air pipe (2-in. pipe is good for 35 ft with 3 elbows, but only 30 ft with 5 elbows). Therefore, 2-1/2 in. diameter pipe must be used for both vent and combustion-air pipes since larger required diameter must always be used for both pipes. If same installation were in Albuquerque, elevation 5250 ft above sea level, installation would require 2-1/2 in. vent pipe and combustion-air pipe. At 5001- to 6000-ft elevation, 2-in. pipe is only good for 17 ft with 5 elbows, and 2-1/2 in. pipe is good for 70 ft with 5 elbows.

C. Combustion-Air and Vent Pipe Attachment

NOTE: All pipe joints must be cemented except attachment of combustion-air pipe to inlet housing connection, since it may be necessary to remove pipe for servicing.

1.Attach combustion-air pipe as follows:

a.Determine location of combustion-air intake pipe con- nection to combustion-air intake housing as shown in Fig. 33 for application.

b.Reposition combustion-air intake housing plug fitting in appropriate unused intake housing connection.

c.If required per Table 7, insert perforated disk assembly (factory-supplied in loose parts bag) in intake housing where combustion-air intake pipe will be connected. If half disk set is required, install with shoulder of disk against stop in combustion-air inlet.

Image 25
Contents Safety Considerations Electrostatic Discharge ESD PrecautionsMultipoise Orientations Unit Size DimensionsII. General Installation SafetyVI. GAS Piping and GAS Pipe Pressure Testing Codes and StandardsVII. Electrical Connections Electrostatic Discharge ESD PrecautionsApplications IntroductionGeneral II. Upflow ApplicationsCondensate Trap Tubing Factory-Shipped Orientation Pressure Switch TubingCondensate Trap Location Alternate Upflow Orientation Condensate Trap Tubing Alternate Upflow OrientationCondensate Trap Location III. Downflow ApplicationsCondensate Trap Tubing Horizontal Left Tube Configuration Construct a Working Platform IV. Horizontal Left SUPPLY-AIR Discharge ApplicationsHorizontal Right SUPPLY-AIR Discharge Applications Attic Location and Working Platform Location II. Furnace Location Relative to Cooling Equipment Furnace Location for Proper Condensate DrainageInstallation Leveling Legs if Desired II. Installation in Upflow or Downflow ApplicationsIII. Installation in Horizontal Applications III. Hazardous LocationsFurnace Plenum Opening Floor Opening Casing Opening DimensionsWidth II. Ductwork Acoustical Treatment Duct FlangesIV. Return AIR Connections III. Supply AIR ConnectionsFilter Arrangement Filter InformationVII. GAS Piping VI. Bottom Closure PanelMaximum Capacity of Pipe Casings onlyElectrical Connections Fire or Explosion HazardIII Accessories WiringPCB Direct Venting Electrical Data Removal of Existing Furnaces from Common Vent Systems II. COMBUSTION-AIR and Vent PipingControl Center Clearance FT COMBUSTION-AIR and Vent Pipe Termination ClearancesExample Combustion-Air and Vent Pipe DiameterCombustion-Air and Vent Pipe Attachment Short Vent 5 to 8 Ft System COMBUSTION-AIR Intake Housing Plug FittingAltitude FT Maximum Allowable Pipe Length FT6001 to 7000‡ Air Intake Housing Plug Fitting Drain Extended Exposed Sidewall Pipes Vent Extension PipeTwo-Pipe Termination Kit IV. Multiventing and Vent Terminations Concentric Vent/Air Termination KitRoof Termination Preferred Sidewall Termination of 12 in. or Less II. Application Condensate Drain GeneralIII. Condensate Drain Protection II. Cooling Mode Heating ModeIII. Continuous Blower Mode IV. Heat Pump ModeIV. Adjustments START-UP Procedures GeneralComponent Test II. Prime Condensate Trap with WaterInducer Housing Drain Cap BTU/CU FT Orifice Manifold 625 650 Only 7001 675 725 8000 775 750 15% 825 2001to 725 750 Only 4001 775 800 825 5000 875 850 900 925 Altitude Derate Multiplier Example 100,000 Btuh Input Furnace Installed AT 4300 FTUnited States CanadaCheck Safety Controls Blower OFF Delay Setup PositionGAS Rate CU FT/HR Speed SelectorChecklist II. Check Pressure SwitchCheck Primary Limit Control CHECKLIST-START-UP CHECKLIST-INSTALLATIONLoad Calculation Combustion AIR Vent Piping
Related manuals
Manual 12 pages 2.16 Kb Manual 44 pages 12.97 Kb