Carrier 58PHA/PHX instruction manual Gas Rate Cu Ft./Hr, Checklist

Page 40

58PHA

Table 12 – Gas Rate (Cu Ft./Hr.)

SECONDS

 

SIZE OF TEST DIAL

 

SECONDS

 

SIZE OF TEST DIAL

FOR 1 REVOLUTION

1

 

2 Cu Ft.

 

5 Cu Ft.

FOR 1 REVOLUTION

1 Cu Ft.

 

2 Cu Ft.

5 Cu Ft.

Cu Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

10

360

 

720

 

1800

50

72

 

144

360

11

327

 

655

 

1636

51

71

 

141

355

12

300

 

600

 

1500

52

69

 

138

346

13

277

 

555

 

1385

53

68

 

136

340

14

257

 

514

 

1286

54

67

 

133

333

15

240

 

480

 

1200

55

65

 

131

327

16

225

 

450

 

1125

56

64

 

129

321

17

212

 

424

 

1059

57

63

 

126

316

18

200

 

400

 

1000

58

62

 

124

310

19

189

 

379

 

947

59

61

 

122

305

20

180

 

360

 

900

60

60

 

120

300

21

171

 

343

 

857

62

58

 

116

290

22

164

 

327

 

818

64

56

 

112

281

23

157

 

313

 

783

66

54

 

109

273

24

150

 

300

 

750

68

53

 

106

265

25

144

 

288

 

720

70

51

 

103

257

26

138

 

277

 

692

72

50

 

100

250

27

133

 

267

 

667

74

48

 

97

243

28

129

 

257

 

643

76

47

 

95

237

29

124

 

248

 

621

78

46

 

92

231

30

120

 

240

 

600

80

45

 

90

225

31

116

 

232

 

581

82

44

 

88

220

32

113

 

225

 

563

84

43

 

86

214

33

109

 

218

 

545

86

42

 

84

209

34

106

 

212

 

529

88

41

 

82

205

35

103

 

206

 

514

90

40

 

80

200

36

100

 

200

 

500

92

39

 

78

196

37

97

 

195

 

486

94

38

 

76

192

38

95

 

189

 

474

96

38

 

75

188

39

92

 

185

 

462

98

37

 

74

184

40

90

 

180

 

450

100

36

 

72

180

41

88

 

176

 

439

102

35

 

71

178

42

86

 

172

 

429

104

35

 

69

173

43

84

 

167

 

419

106

34

 

68

170

44

82

 

164

 

409

108

33

 

67

167

45

80

 

160

 

400

110

33

 

65

164

46

78

 

157

 

391

112

32

 

64

161

47

76

 

153

 

383

116

31

 

62

155

48

75

 

150

 

375

120

30

 

60

150

49

73

 

147

 

367

 

 

 

 

 

Checklist

1.Put away tools and instruments. Clean up debris.

2.Verify that blower OFF-DELAY time is selected as desired.

3.Verify that blower and burner access doors are properly installed.

4.Cycle test furnace with room thermostat.

5.Check operation of accessories per manufacturer’s instructions.

6.Review User’s Guide with owner.

7.Attach literature packet to furnace.

40

Image 40
Contents Ama Safety Considerations Furnace Reliability HazardIntroduction CUT HazardCodes and Standards Clearances to CombustiblesElectrostatic Discharge ESD Precautions Procedure VentingGeneral LocationCarbon Monoxide Poisoning Hazard Electrical Operation Hazard Personal Injury AND/OR Property Damage HazardAIR for Combustion Ventilation Fire HazardFurnace Corrosion Hazard Location Relative to Cooling EquipmentACH Installation Combination of Indoor and Outdoor AirBottom Return Air Inlet Side Return Air InletDownflow Installation Leveling LegsA08556 Opening Dimensions In. mm Suspended Furnace SupportPlatform Furnace Support Roll-Out ProtectionFilter Arrangement Carbon Monoxide and Poisoning Hazard AIR DuctsGeneral Requirements Ductwork Acoustical Treatment Supply Air ConnectionsUpflowdownflow Horizontal Horizontal Suspension with Straps GAS Piping Fire or Explosion Hazard Return Air ConnectionsFurnace Overheat Hazard Air Delivery CFM With Filter Maximum Capacity of PipeUpflow Return Air Configurations and Restrictions Horizontal Return Air Configurations and Restrictions Electrical Connections Electrical Shock Hazard Electrical DataElectrical Shock and Fire Hazard Wiring Furnace MAY not OperateBOX Relocation Electrical Connection to J-BOXPower Cord Installation in Furnace J-BOX BX Cable Installation in Furnace J-BOXAccessories VentingFurnace Control General Venting Requirements Masonry Chimney RequirementsSingle-Stage Furnace with Single-Speed Air Con Ditioner Humidfier Appliance Application Requirements Internal Area of ChimneyChimney Inspection Chart Burn Hazard Additional Venting RequirementsSidewall Venting Upflow Application-Vent Elbow Up See Notes 1,2,4,5,7,8,9 on See Notes 1,2,4,5,7,8,9 Using Tin Snips to Cut Tie Points Venting Notes for FiguresRounded End of Knockout Fire and Explosion Hazard START-UP, ADJUSTMENT, and Safety CheckFurnace Damage Hazard Follow exclusively the National Fuel Gas Code CanadaAltitude Derate Multiplier for U.S.A Gas Control Valve Speed Selection Check Safety ControlsFurnace Overheating Hazard Checklist Gas Rate Cu Ft./HrA08220 A08220A Service and Maintenance Procedures Electrical Controls and Wiring Electrical Shock HazardFIRE, INJURY, or Death Hazard Electrical SHOCK, Fire or Explosion HazardA08221 Service Care and Maintenance Fire or Explosion Hazard Cleaning AND/OR Replacing AIR FilterCarbon Monoxide Poisoning Fire Hazard Filter Size Information In. / mmCleaning Heat Exchanger Unit Damage HazardIgniter Position-Side View Cleaning Heat Exchanger Cell Sequence of OperationCooling Mode Thermidistat ModeContinuous Blower Mode Two-Speed CoolingTroubleshooting Wiring DiagramsHeat pump Wiring Diagram Troubleshooting Guide Catalog No 58PHA---03SI