Contents

 

Introduction

1

period one Absorption Refrigeration Cycle

3

 

Absorption System Fluids

6

 

Components of the Absorption Cycle

8

 

Equilibrium Chart

15

period two Absorption Chiller Types

18

 

Single-Effect Chiller

19

 

Double-Effect Chiller

21

 

Direct-Fired Chiller

27

 

Chiller/Heater

30

period three

Capacity Control

34

 

Crystallization

37

 

Purge System

44

period four

Maintenance Considerations

46

period five

Application Considerations

53

 

Cooling-Water Temperature Limitations

54

 

Combination Chiller Plants

55

 

Special Considerations for Direct-Fired Chillers

57

 

Equipment Rating Standards

59

period six

Review

60

 

Quiz

65

 

Answers

68

 

Glossary

69

TRG-TRC011-EN

iii

Image 4
Contents Air Conditioning Clinic Absorption Water Chillers Absorption Water Chillers Preface Contents TRG-TRC004-EN Introduction TRG-TRC011-EN Absorption Refrigeration Cycle Period onePeriod one Reject heat Heat energy Absorption System Fluids High affinity for water refrigerant Components of the Absorption Cycle Conditions Steam or Hot waterrefrigerant vapor Generator Condenser Refrigerant then flows into the evaporator pan Absorber spray pump Solution Heat Exchanger Dilute Generator pump Equilibrium Chart Heat Solution temperature Absorption Chiller Types Period twoSingle-Effect Chiller Absorber Evaporator spray pump Spray pump Generator pump Double-Effect Chiller Vapor Low Temperature condenser Cooling Generator Water Evaporator Absorber Low-temperature generator pump Generator pump Absorption Chiller Types Direct-Fired Chiller Evaporator High-temperature high-temperature Generatorgenerator pump Chiller/Heater Absorption Chiller Types Changeover Absorption Chiller Types Capacity Control Period threePeriod three Energy valve Generator Crystallization 10C 37.8C Capacity Control Capacity Control Capacity Control Heat exchanger bypass Evaporator pan Purge System Isolation valve Maintenance Considerations Period fourPeriod four Maintenance Considerations Test run with alternate fuel, if dual-fuel burner Maintenance Considerations Maintenance Considerations Corrosion inhibitor and performance additive recommendations Application Considerations Period fiveCooling-Water Temperature Limitations Combination Chiller Plants 58F Special Considerations for Direct-Fired Chillers Application Considerations Equipment Rating Standards Review Period sixPeriod six Review Review Review Quiz Questions for PeriodQuiz TRG-TRC011-EN Answers Glossary Glossary Glossary Trane Company