Verify proper operation

Inspect burner firing rate, blower, linkage, and safety controls

Test run with alternate fuel, if dual-fuel burner

Figure 58

The burner is the heart of a direct-fired absorption chiller. Correct operation is, therefore, necessary for optimum chiller performance. Daily checks should be made in accordance with the manufacturer’s recommendations. Each cooling season, the burner’s firing rate, blower, linkage, and safety controls should be checked to ensure proper operation. If a dual-fuel burner is being used, it should be periodically test run with the alternate fuel to ensure reliable operation.

Manufacturers of direct-fired absorption chillers provide detailed burner maintenance checklists, generally with maintenance requirements at 3-, 6-, and 12-month intervals. To ensure efficiency and increase longevity of both the burner and the chiller, consult manufacturers’ maintenance manuals and follow their instructions.

With indirect-fired absorption chillers, periodic inspection of the energy valve is recommended to check for leaks. Again, consult manufacturers’ maintenance manuals for specific recommendations.

TRG-TRC011-EN

49

Image 54
Contents Air Conditioning Clinic Absorption Water Chillers Absorption Water Chillers Preface Contents TRG-TRC004-EN Introduction TRG-TRC011-EN Absorption Refrigeration Cycle Period onePeriod one Reject heat Heat energy Absorption System Fluids High affinity for water refrigerant Components of the Absorption Cycle Conditions Steam or Hot waterrefrigerant vapor Generator Condenser Refrigerant then flows into the evaporator pan Absorber spray pump Solution Heat Exchanger Dilute Generator pump Equilibrium Chart Heat Solution temperature Absorption Chiller Types Period twoSingle-Effect Chiller Absorber Evaporator spray pump Spray pump Generator pump Double-Effect Chiller Vapor Low Temperature condenser Cooling Generator Water Evaporator Absorber Low-temperature generator pump Generator pump Absorption Chiller Types Direct-Fired Chiller Evaporator High-temperature high-temperature Generatorgenerator pump Chiller/Heater Absorption Chiller Types Changeover Absorption Chiller Types Capacity Control Period threePeriod three Energy valve Generator Crystallization 10C 37.8C Capacity Control Capacity Control Capacity Control Heat exchanger bypass Evaporator pan Purge System Isolation valve Maintenance Considerations Period fourPeriod four Maintenance Considerations Test run with alternate fuel, if dual-fuel burner Maintenance Considerations Maintenance Considerations Corrosion inhibitor and performance additive recommendations Application Considerations Period fiveCooling-Water Temperature Limitations Combination Chiller Plants 58F Special Considerations for Direct-Fired Chillers Application Considerations Equipment Rating Standards Review Period sixPeriod six Review Review Review Quiz Questions for PeriodQuiz TRG-TRC011-EN Answers Glossary Glossary Glossary Trane Company