New Buck Corporation 384 manual Fireplace Clearances, Installing The Firebox, Framing the Firebox

Page 30
FIREPLACE CLEARANCES

FIREPLACE CLEARANCES

The fireplace may be placed directly on a combustible floor, against a combustible wall at marked clear- ances, or on a raised wooden platform.

If the fireplace is to be installed on a raised wooden platform, the platform must be a continuous level surface. The fireplace must be secured in place so it cannot shift positions. Only the header (see below) may rest on the standoffs on top of the firebox.

When the firebox is installed over carpeting, vinyl tile, or any combustible material other than wood flooring, it must be installed on a metal or wood panel extending its full width and depth. Alternatively, the carpeting, vinyl tile, etc. may be removed beneath the fireplace before installing.

COMBUSTIBLE MATERIALS MUST NOT BE INSTALLED OVER OR TOUCH ANY BLACK PAINTED SURFACE. DO NOT BLOCK HEAT CIRCULATING AIR OUTLETS. DOING SO MAY

RESULT IN POTENTIAL FIRE HAZARDS.

1.Sidewall Clearances: Clearances from the side of the fireplace opening to any adjacent combustible wall should not be less than 7"right side and 7" left side.

2.Ceiling Clearances: The ceiling height should not be less than 26" from the top of the fireplace opening.

INSTALLING THE FIREBOX

This list of specific instructions will help you make certain that every installation operation is performed correctly. Complete the installation steps in the sequence shown.

LOCAL BUILDING CODES SHOULD BE CONSULTED IN ALL CASES AS TO THE PARTICULAR REQUIREMENTS CONCERNING THE INSTALLATION OF FACTORY BUILT FIREPLACES.

Select the location for the fireplace by taking into consideration the factors previously outlined in the “Choosing the Location.”

Framing the Firebox

The width of the framed opening must be 35- 17/32". The height of the framed opening must be 25 1/8". For depth of opening see side view of this page.

The entire fireplace can be elevated above the floor to achieve a raised hearth effect. This can be done by adding a small platform to achieve the desired height.

NOTE: The wiring for the blower must be installed during the framing stage. Insulation should be used in the framing on the back, sides, and top.

Install the Firebox

Install the firebox into the framed opening by placing it directly in front of the opening and sliding it into the proper position. Please follow wooden surround instructions.(Also see page 25)

Level the Firebox

Check the level of the firebox on the top edge of the fireplace face. Shim if necessary.

SIDE

VIEW

INSTALLING THE FIREBOX 13-3/4”

FRONT

VIEW

FRAMING

HEADER

25-1/8”

Page 26

Image 30
Contents Manufacturer NEW BUCK CORPORATION P.O. Box 8000 Highway 226 South MODELVENT-FREE Spruce Pine, NCPage TABLE OF CONTENTS Page SECTION I SAFETY INFORMATION WARNINGS 6. What To Do IF You Smell Gas Shut off gas supply 32. This appliance is intended for supplemental heating SECTION FIREPLACE PREPARATIONINSTALLATION AND CLEARANCES GAS CONNECTIONFLAME Page “MILLIVOLT ONLY” GAS PRESSURE CHECK FOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTION MODULATING OR MANUAL VALVE SITLIGHTING INSTRUCTION 12. Close access panel door 13. Turn on all electrical power to the applianceto “ON” position. Continue to turn the to your desired setting MANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS SIT-MILLIVOLT VALVEOPERATING INSTRUCTIONS Page Page MANUAL LIGHTING PROCEDURE WHEN USED AS A HEATING APPLIANCE HEAT OUTPUT FLAME CHECKCR 3329 LOG SET WIRING DIAGRAM NOTE #PE SBR084 Blower Motor Rating 120 volts/60HZ/1.1 Amps SECTION INSTALLATION MODEL 384 FP IN SOLID FUEL BURNING FIREPLACES Trim KitCEILING Also provide adequate clearances around air openings SECTION INSTALLATION OF MODEL 384 WS WITH OPTIONAL WOODEN SURROUND KIT#PAKDM384STEP 7 Remove cloth or blanket from underneath stove GAS LINE SECTION ZERO CLEARANCE INSTALLATION OF MODEL 384 ZCCHOOSING THE LOCATION FOR YOUR FIREPLACE DRAFTSTop Standoff 2 per unit ZERO CLEARANCE STANDOFFS ASSEMBLY“Follow the instructions given in the diagrams below exactly” 12.50” Front Of Top Trim PanelInstall the Firebox INSTALLING THE FIREBOXFIREPLACE CLEARANCES Framing the FireboxFINISHING YOUR FIREPLACE CLEARANCESSECTION MODEL 384 FS FREESTANDING INSTALLATION FREESTANDING PEDESTAL OR LEGS INSTALLATION SECTION MODEL ALCOVE INSTALLATION CAUTION READ ENTIRE MANUAL BEFORE INSTALLING HEATERSECTION PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIR FLOW FOR HEATER LOCATIONThis section is for residential or manufactured mobile installation 1. Determine the volume of the space length x width x height SECTION VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS Ventilation Air From OutdoorsSECTION AFTER MARKET MOBILE HOME INSTALLATION IMPORTANT SAFEGUARDS CLEANINGOBSERVED Air in gas lines when OBSERVED OBSERVED REPAIR PARTS SERVICINGKEY# REPLACEMENT PARTSSIT MODULATING OR MANUAL VALVE PART DESCRIPTION1719 PILOTREPLACEMENT PARTS SIT MILLIVOLT VALVESIT MILLIVOLT REPLACEMENT PARTS FOR EMBER STOVE BASE ESB SIT MILLIVOLT 10 one is not available, you may contactPage LIMITED WARRANTY VENT-FREE GAS LOG HEATER NEW BUCK CORPORATIONPage