New Buck Corporation 384 manual Wiring Diagram

Page 22
WIRING DIAGRAM

WIRING DIAGRAM

REV. DATE BY

DISCRIPTION

APRV

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 5

NOTE: “If any of the original wire as supplied with the gas appliance must be replaced, it must be replaced with a wire of at least a 105o C. temperature rating.”

NOTE: Installation and repair should be done by a qualified service person. This heater should be inspected before use and at least annually by a qualified service person. More frequent cleaning may be required due to excessive lint from carpeting, bedding material, pet hair, etc. It is imperative that control compartments and circulating air passageways of the heater be kept clean.

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

Verify proper operation after servicing.

Page 18

Image 22
Contents Manufacturer NEW BUCK CORPORATION P.O. Box 8000 Highway 226 South MODELVENT-FREE Spruce Pine, NCPage TABLE OF CONTENTS Page SECTION I SAFETY INFORMATION WARNINGS 6. What To Do IF You Smell Gas Shut off gas supply 32. This appliance is intended for supplemental heating SECTION FIREPLACE PREPARATIONGAS CONNECTION INSTALLATION AND CLEARANCESFLAME Page “MILLIVOLT ONLY” GAS PRESSURE CHECK FOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTION MODULATING OR MANUAL VALVE SITLIGHTING INSTRUCTION 13. Turn on all electrical power to the appliance 12. Close access panel doorto “ON” position. Continue to turn the to your desired setting MANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONLIGHTING INSTRUCTIONS SIT-MILLIVOLT VALVE FOR YOUR SAFETY READ BEFORE LIGHTINGOPERATING INSTRUCTIONS Page Page MANUAL LIGHTING PROCEDURE FLAME CHECK WHEN USED AS A HEATING APPLIANCE HEAT OUTPUTCR 3329 LOG SET WIRING DIAGRAM NOTE #PE SBR084 Blower Motor Rating 120 volts/60HZ/1.1 Amps Trim Kit SECTION INSTALLATION MODEL 384 FP IN SOLID FUEL BURNING FIREPLACESCEILING Also provide adequate clearances around air openings SECTION INSTALLATION OF MODEL 384 WS WITH OPTIONAL WOODEN SURROUND KIT#PAKDM384STEP 7 Remove cloth or blanket from underneath stove GAS LINE SECTION ZERO CLEARANCE INSTALLATION OF MODEL 384 ZCCHOOSING THE LOCATION FOR YOUR FIREPLACE DRAFTSTop Standoff 2 per unit ZERO CLEARANCE STANDOFFS ASSEMBLY“Follow the instructions given in the diagrams below exactly” 12.50” Front Of Top Trim PanelInstall the Firebox INSTALLING THE FIREBOXFIREPLACE CLEARANCES Framing the FireboxFINISHING YOUR FIREPLACE CLEARANCESSECTION MODEL 384 FS FREESTANDING INSTALLATION FREESTANDING PEDESTAL OR LEGS INSTALLATION SECTION MODEL ALCOVE INSTALLATION CAUTION READ ENTIRE MANUAL BEFORE INSTALLING HEATERDETERMINING FRESH-AIR FLOW FOR HEATER LOCATION SECTION PRODUCING ADEQUATE VENTILATIONThis section is for residential or manufactured mobile installation 1. Determine the volume of the space length x width x height SECTION VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS Ventilation Air From OutdoorsSECTION AFTER MARKET MOBILE HOME INSTALLATION IMPORTANT SAFEGUARDS CLEANINGOBSERVED Air in gas lines when OBSERVED OBSERVED REPAIR PARTS SERVICINGKEY# REPLACEMENT PARTSSIT MODULATING OR MANUAL VALVE PART DESCRIPTION1719 PILOTREPLACEMENT PARTS SIT MILLIVOLT VALVESIT MILLIVOLT REPLACEMENT PARTS FOR EMBER STOVE BASE ESB SIT MILLIVOLT 10 one is not available, you may contactPage LIMITED WARRANTY VENT-FREE GAS LOG HEATER NEW BUCK CORPORATIONPage