New Buck Corporation 384 manual Also provide adequate clearances around air openings

Page 25
Also provide adequate clearances around air openings.

B.

Set the top (long) trim panel in place on top of unit. The panel should be flat against the

 

outside face of the fireplace, and standing vertically (measuring approximately 12” from the

 

rear of the unit to the front area). Mark along the lower edge of the trim panel with a pencil

 

to make reference line for mounting.

NOTE: If used in installation trim panels or surrounds shall not seal ventilation openings in the fireplace.

Also provide adequate clearances around air openings.

(4)Slide the unit out of the fireplace far enough to work behind the trim panel reference lines with a screw gun.

NOTE: You need to make sure the supply gas line is hooked up at this time. Be sure to check for leaks at the connection using soap and water. DO NOT USE OPEN FLAME TEST FOR LEAKS.

(5)With screws provided with fireplace kit, attach both side trim panels. Next, attach top trim panel.

(6)Slide the heater back into the fireplace with the trim panels flat against the face of the fireplace.

(7)After hooking up gas line, checking for leaks, and mounting trim panels slide heater into fireplace.

(8)Place logs on burner base as shown on pages 6-7.

(9)For gas hook-up and pressure tap test, see instruction in Section II.

NOTE: Smoke shelves, shields and baffles may be removed if attached by mechanical fasteners.

Page 21

Image 25
Contents VENT-FREE MODELManufacturer NEW BUCK CORPORATION P.O. Box 8000 Highway 226 South Spruce Pine, NCPage TABLE OF CONTENTS Page SECTION I SAFETY INFORMATION WARNINGS 6. What To Do IF You Smell Gas Shut off gas supply 32. This appliance is intended for supplemental heating FIREPLACE PREPARATION SECTIONGAS CONNECTION INSTALLATION AND CLEARANCESFLAME Page “MILLIVOLT ONLY” GAS PRESSURE CHECK LIGHTING INSTRUCTION MODULATING OR MANUAL VALVE SIT FOR YOUR SAFETY READ BEFORE LIGHTINGLIGHTING INSTRUCTION 13. Turn on all electrical power to the appliance 12. Close access panel doorto “ON” position. Continue to turn the to your desired setting THERMOSTAT CONTROL OPERATION MANUAL LIGHTING PROCEDURELIGHTING INSTRUCTIONS SIT-MILLIVOLT VALVE FOR YOUR SAFETY READ BEFORE LIGHTINGOPERATING INSTRUCTIONS Page Page MANUAL LIGHTING PROCEDURE FLAME CHECK WHEN USED AS A HEATING APPLIANCE HEAT OUTPUTCR 3329 LOG SET WIRING DIAGRAM NOTE #PE SBR084 Blower Motor Rating 120 volts/60HZ/1.1 Amps Trim Kit SECTION INSTALLATION MODEL 384 FP IN SOLID FUEL BURNING FIREPLACESCEILING Also provide adequate clearances around air openings OPTIONAL WOODEN SURROUND KIT#PAKDM384 SECTION INSTALLATION OF MODEL 384 WS WITHSTEP 7 Remove cloth or blanket from underneath stove CHOOSING THE LOCATION FOR YOUR FIREPLACE SECTION ZERO CLEARANCE INSTALLATION OF MODEL 384 ZCGAS LINE DRAFTS“Follow the instructions given in the diagrams below exactly” ZERO CLEARANCE STANDOFFS ASSEMBLYTop Standoff 2 per unit 12.50” Front Of Top Trim PanelFIREPLACE CLEARANCES INSTALLING THE FIREBOXInstall the Firebox Framing the FireboxCLEARANCES FINISHING YOUR FIREPLACESECTION MODEL 384 FS FREESTANDING INSTALLATION FREESTANDING PEDESTAL OR LEGS INSTALLATION CAUTION READ ENTIRE MANUAL BEFORE INSTALLING HEATER SECTION MODEL ALCOVE INSTALLATIONDETERMINING FRESH-AIR FLOW FOR HEATER LOCATION SECTION PRODUCING ADEQUATE VENTILATIONThis section is for residential or manufactured mobile installation 1. Determine the volume of the space length x width x height VENTILATION AIR FROM INSIDE BUILDING SECTION VENTILATION AIRVentilation Air From Outdoors VENTILATION AIR FROM OUTDOORSSECTION AFTER MARKET MOBILE HOME INSTALLATION CLEANING IMPORTANT SAFEGUARDSOBSERVED Air in gas lines when OBSERVED OBSERVED SERVICING REPAIR PARTSSIT MODULATING OR MANUAL VALVE REPLACEMENT PARTSKEY# PART DESCRIPTIONPILOT 1719SIT MILLIVOLT VALVE REPLACEMENT PARTSSIT MILLIVOLT REPLACEMENT PARTS FOR EMBER STOVE BASE ESB 10 one is not available, you may contact SIT MILLIVOLTPage NEW BUCK CORPORATION LIMITED WARRANTY VENT-FREE GAS LOG HEATERPage