Heat & Glo LifeStyle 8000CFLP-OAKIPI Install the Mesh, Hood, Install Trim and/or Surround

Page 50

I. Fixed Glass Assembly

WARNING! Risk of Asphyxiation! Handle fixed glass assembly with care. Inspect the gasket to ensure it is undamaged and inspect the glass for cracks, chips or scratches.

DO NOT strike, slam or scratch glass.

DO NOT operate fireplace with glass removed, cracked, broken or scratched.

Replace as a complete assembly.

Removing Fixed Glass Assembly

Pull the four glass assembly latches out of the groove on the glass frame. Remove glass door from the appliance (see Figure 14.5).

Replacing Fixed Glass Assembly

Replace the glass door on the appliance. Pull out and latch the four glass assembly latches into the groove on the glass frame.

LATCHES (BOTH BOTTOM

AND TOP)

GLASS

ASSEMBLY

Figure 14.5 Fixed Glass Assembly

J. Install the Mesh

The screen mesh is built into front.

K. Hood

Hood is included with the front and required in all installations.

L. Install Trim and/or Surround

Install optional trim kits and/or surrounds using the instructions included with the accessory.

Use non-combustible materials to cover the gap between the sheet rock and the appliance (when applicable to the model).

M. Air Shutter Setting

Air shutter settings should be adjusted by a qualified ser- vice technician at the time of installation. The air shutter is set at the factory for minimum vertical vent run. Adjust air shutter for longer vertical runs. See Figure 14.6.

Loosen the wing nut.

Push the air handle in to close the air shutter.

Pull the air handle out to open the air shutter.

Tighten the wing nut.

NOTICE: If sooting occurs, provide more air by opening the air shutter.

Note: The adjustable air shutter is not offered with the LP model. The LP is fixed, full open, for maximum primary air.

AIR SHUTTER

WING NUT

Figure 14.6 Air Shutter

Air Shutter Settings

 

NG

LP

Burner

3/8 in.

Fixed

50

Heat & Glo • 8000CF-OAK-IPI2059-900 Rev. R • 6/09

Image 50
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Xxxxxxxx CongratulationsHomeowner Reference Information Table of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 Max V1 + V2 Min H1 + H2 MaxChart Vertical Top VentH1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Two ElbowsH1 Maximum V1 + Minimum Heat Shield Above First 900 Elbow Vent Clearances and FramingPipe Clearances to Combustibles RequiredNon-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Install the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Installing the Fiberglass Gasket Securing and Leveling the ApplianceCompleting Grate Set-up Checking Pilot PlateAssemble Vent Sections Installing Vent PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Slip Sections Secure the Vent SectionsRotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Heat Shield Requirements for Horizontal TerminationInstall Horizontal Termination Cap Ansi Z223.1 and CAN/CGA-B149 installation codesGas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Install the Optional Refractory Ember PlacementLog Assembly LOGS-8OAK Install the Log AssemblyHeat & Glo 8000CF-OAK-IPI 2059-900 Rev. R 6/09 Air Shutter Setting Install the MeshInstall Trim and/or Surround Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsDVP-TRAP Horizontal Termination CapDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDVP-TB1 305 mmLog Set Assembly Service PartsAt Depot Service Parts ListStocked Valve Assembly Contact Information