Heat & Glo LifeStyle 8000CFLP-OAKIPI owner manual Mantel and Wall Projections, Combustible Mantels

Page 20

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc).

Combustible Mantels

 

 

18

Note: All

 

14-1/4

measurements

10-1/2

in inches.

 

 

6-3/4

 

 

 

 

3

 

 

12-1/4

 

 

11-1/8

 

 

10

 

 

8-7/8

 

 

7-3/4

 

 

MEASUREMENTS FROM

 

 

TOP EDGE OF HOOD

Figure 5.3

Minimum Vertical and Maximum Horizontal

 

Dimensions of Combustibles

Combustible Mantel Legs or Wall Projections

 

1 in.

TOP VIEW

MIN.

 

3 in.

MIN. 3 ft. MAX.

Figure 5.4 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

20

Heat & Glo • 8000CF-OAK-IPI2059-900 Rev. R • 6/09

Image 20
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Xxxxxxxx CongratulationsHomeowner Reference Information Table of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsEither cobrahead or SIT Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 Max V1 + V2 Min H1 + H2 MaxChart Vertical Top VentH1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Two ElbowsH1 Maximum V1 + Minimum Vent Clearances and Framing Pipe Clearances to CombustiblesHeat Shield Above First 900 Elbow RequiredNon-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Install the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Installing the Fiberglass Gasket Securing and Leveling the ApplianceCompleting Grate Set-up Checking Pilot PlateInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent SectionsRotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Heat Shield Requirements for Horizontal TerminationInstall Horizontal Termination Cap Ansi Z223.1 and CAN/CGA-B149 installation codesGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Install the Optional Refractory Ember PlacementLog Assembly LOGS-8OAK Install the Log AssemblyHeat & Glo 8000CF-OAK-IPI 2059-900 Rev. R 6/09 Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsDVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TB1 305 mmLog Set Assembly Service PartsAt Depot Service Parts ListStocked Valve Assembly Contact Information