Heat & Glo LifeStyle 8000CFLP-OAKIPI RF6M RF12M, BEK DVP-BEK2, Dvp-Trapfl, Cool-Add, Dvp-Hsm-B

Page 56

B. Vent Components Diagrams (continued)

 

 

 

 

31 in.

 

 

 

 

 

(787 mm)

 

13-1/4 in.

 

 

 

 

 

(367 mm)

 

 

24-5/8 in.

 

 

 

 

(625 mm)

 

 

24-5/8 in.

27-1/2 in.

 

 

 

 

(625 mm)

(127 mm)

 

 

 

13-1/4 in.

 

 

 

 

 

 

 

 

 

(367 mm)

RF6M

 

 

 

RF12M

 

Roof Flashing Multi-pak

 

 

 

 

Roof Flashing Multi-pak

 

 

 

 

 

13-3/4 in.

5 in.

 

 

11-7/8 in.

5 in.

(349 mm)

(127 mm)

 

 

(302 mm)

(127 mm)

13-3/4 in.

 

 

13-7/8 in.

 

 

 

 

(352 mm)

 

 

(349 mm)

 

 

 

 

 

 

 

 

 

BEK

 

 

 

DVP-BEK2

 

Trap Cap Brick Extension

 

 

DVP-HPC Cap Brick Extension

 

 

11-5/8 in.

 

 

 

 

 

(295 mm)

 

 

 

 

7-1/8 in.

 

12-1/8 in.

 

 

 

(308 mm)

 

 

(181 mm)

 

 

 

 

 

 

 

DVP-TRAPFL

 

5-3/4 in.

 

 

 

 

(146 mm)

COOL-ADD

 

Flashing

 

 

 

 

 

 

 

Cap Shield

 

 

 

 

 

26 in.

 

 

13-7/8 in.

9-1/2 in.

 

 

 

(352 mm)

(241 mm)

 

660 mm

 

 

 

 

 

 

 

14 in.

 

 

 

DVP-HSM-B

 

(356 mm)

 

 

 

Extended Heat Shield

 

 

 

 

 

Figure 16.4 DVP vent components

 

 

DRC-RADIUS

 

 

 

Cap Shield

 

 

 

 

 

56

Heat & Glo • 8000CF-OAK-IPI2059-900 Rev. R • 6/09

 

Image 56
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Xxxxxxxx CongratulationsHomeowner Reference Information Table of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsEither cobrahead or SIT Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 Max V1 + V2 Min H1 + H2 MaxChart Vertical Top VentH1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Two ElbowsH1 Maximum V1 + Minimum Vent Clearances and Framing Pipe Clearances to CombustiblesHeat Shield Above First 900 Elbow RequiredNon-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Install the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Installing the Fiberglass Gasket Securing and Leveling the ApplianceCompleting Grate Set-up Checking Pilot PlateInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent SectionsRotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Heat Shield Requirements for Horizontal TerminationInstall Horizontal Termination Cap Ansi Z223.1 and CAN/CGA-B149 installation codesGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Install the Optional Refractory Ember PlacementLog Assembly LOGS-8OAK Install the Log AssemblyHeat & Glo 8000CF-OAK-IPI 2059-900 Rev. R 6/09 Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsDVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TB1 305 mmLog Set Assembly Service PartsAt Depot Service Parts ListStocked Valve Assembly Contact Information