Heat & Glo LifeStyle 8000CF-OAK-IPI, 8000CFLP-OAKIPI Dvp-Trap, Horizontal Termination Cap

Page 55

B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

8in.

(203 mm)

Heat

Shield

15-1/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(384 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Term Cap

Minimum

Maximum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Effective Length

Effective Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 in.

 

 

 

 

Max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3-1/8 in.

4-5/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

(305 mm)

 

Effective

Trap1

 

 

 

 

 

 

 

 

79 mm

117 mm

 

 

 

 

 

DVP-TRAP

Length

 

 

 

 

 

 

 

 

 

 

Trap2

5-3/8 in.

9-3/8 in.

 

 

Horizontal Termination Cap

 

 

 

 

 

 

 

 

 

 

 

 

137 mm

238 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DVP-TRAP1

DVP-TRAP2

DVP-TRAPK1

DVP-TRAPK2

Figure 16.3 DVP vent components

Heat & Glo • 8000CF-OAK-IPI2059-900 Rev. R • 6/09

55

Image 55
Contents HOT Surfaces What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsXxxxxxxx User Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Minimum Framing DimensionsClearances Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyV1 Minimum H1 + H2 Maximum Vent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 MaximumV1 Min H1 Max V2 Min H2 Max V1 + V2 Min H1 + H2 Max Top Vent Horizontal Termination Three ElbowsVertical Top Vent ChartH1 Maximum V1 + Minimum Top Vent Vertical Termination Two ElbowsH1+ H2 V1+ V2 Minimum H1+ H2 Maximum Required Vent Clearances and FramingPipe Clearances to Combustibles Heat Shield Above First 900 ElbowCombustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration Pipe DVP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Temporary Access PanelAttaching Sheetrock Ledges Securing and Leveling the Appliance Installing the Fiberglass GasketChecking Pilot Plate Completing Grate Set-upAssemble Pipe Sections Installing Vent PipeAttach Vent to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapAnsi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingAppliance Setup Ember Placement Install the Optional RefractoryInstall the Log Assembly Log Assembly LOGS-8OAKHeat & Glo 8000CF-OAK-IPI 2059-900 Rev. R 6/09 Air Shutter Settings Install the MeshInstall Trim and/or Surround Air Shutter SettingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters DVP vent components Vent Components DiagramsHorizontal Termination Cap DVP-TRAPCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFL305 mm DVP-TB1Service Parts Log Set AssemblyStocked Service Parts ListAt Depot Valve Assembly Contact Information