Heat & Glo LifeStyle 8000CFLP-OAKIPI Vent Clearances and Framing, Pipe Clearances to Combustibles

Page 28

8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:

• Between ceiling firestops

COMBUSTIBLE

SURFACE

3 IN. MIN.

Between wall shield firestops

Around vent system

Failure to keep insulation or other material away from vent pipe may cause over heating and fire.

Note: Slope not

3 in. TOP

CLEARANCE

required.

 

1 in. CLEARANCE

 

AROUND VERTICAL

 

SECTIONS

 

 

1 in. SIDE AND

 

BOTTOM CLEARANCE

HEAT

SHIELD

Figure 8.2

(76 mm)

Figure 8.1 Pipe Clearances

Heat Shield Above First 900 Elbow

WARNING

Fire Risk.

Installation of this appliance may require the use of heat shield 385-290 above the first 90º elbow in the venting system.

Heat shield required if vertical distance between top of horizontal elbow and any combustible surface above elbow is less than 4 inches.

Heat shield not required if distance is more than 4 inches.

Fasten the shield in place using the four pilot holes pro- vided in the part.

Position the shield so the longest dimension (13 1/2 inch) is placed in same direction the elbow is pointing.

Center the shield directly above the elbow with a 1/2 inch air space between shield and combustible surface (see Figure 8.3).

 

COMBUSTIBLE SURFACE

 

 

DIRECTION

 

CORRECT

UP

INCORRECT

 

HEAT SHIELD

 

 

90º ELBOW

 

Figure 8.3

 

 

Attach elbow heat shield to the exhaust pipe if combusti- ble materials are not present at install (see Figure 8.4).

Cut the tabs as shown and bend down. Using the screws found in the manual bag secure the heat shield to the pipe maintaining 3 to 4 inches between the pipe and shield.

SCREW

3 in.

(76 mm)

Figure 8.4

28

Heat & Glo • 8000CF-OAK-IPI2059-900 Rev. R • 6/09

Image 28
Contents HOT Surfaces What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsXxxxxxxx Table of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsEither cobrahead or SIT Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing DimensionsClearances Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 Max V1 + V2 Min H1 + H2 MaxChart Vertical Top VentH1 Maximum V1 + Minimum Top Vent Vertical Termination Two ElbowsH1+ H2 V1+ V2 Minimum H1+ H2 Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesHeat Shield Above First 900 Elbow RequiredCombustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration Install the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Temporary Access PanelAttaching Sheetrock Ledges Installing the Fiberglass Gasket Securing and Leveling the ApplianceCompleting Grate Set-up Checking Pilot PlateInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent SectionsRotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Heat Shield Requirements for Horizontal TerminationInstall Horizontal Termination Cap Ansi Z223.1 and CAN/CGA-B149 installation codesGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Install the Optional Refractory Ember PlacementLog Assembly LOGS-8OAK Install the Log AssemblyHeat & Glo 8000CF-OAK-IPI 2059-900 Rev. R 6/09 Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Vent Components Diagrams DVP vent componentsDVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TB1 305 mmLog Set Assembly Service PartsStocked Service Parts ListAt Depot Valve Assembly Contact Information