B. Wall Penetration Framing

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

 

 

 

 

 

3 IN. TOP

HEAT

 

 

CLEARANCE

SHIELD

 

 

 

 

 

 

HEAT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHIELD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 IN. CLEARANCE

WALL

WALL BOTTOM SIDES

SHIELD

 

 

FIRESTOP

 

 

Figure 8.5 Horizontal Venting Clearances to Combustible Materials

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop(s). The wall shield firestop maintains minimum clearances and prevents cold air infiltration. See Figure 8.6.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

DVP pipe - A wall shield firestop is required on one side only on interior walls. If your local inspector requires a wall shield firestop on both sides, then both wall shield firestops must have a heat shield (refer to Section 16.B.) attached to them.

See Section 10.J. for information for regarding the in- stallation of a horizontal termination cap.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncom- bustible materials such as concrete, a hole with diameter one inch greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall shield firestop is only required on one side and no heat shield is necessary.

12 in.

10 in.

B

A

A*

B

57-1/2 in.

56-1/2 in.

*Shows center of 10 in. x 12 in. vent framing hole for top venting. The center of the hole is 1 inch above the center of the horizontal vent pipe. With minimum vertical or 12 inch and 90º elbow.

Figure 8.6 Wall Penetration

Heat & Glo • 8000CF-OAK-IPI2059-900 Rev. R • 6/09

29

Image 29
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Xxxxxxxx CongratulationsHomeowner Reference Information User Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsTwo Elbows Vent Diagrams Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumV1 Min H1 Max V2 Min H2 Max V1 + V2 Min H1 + H2 Max Top Vent Horizontal Termination Three ElbowsVertical Top Vent ChartH1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Two ElbowsH1 Maximum V1 + Minimum Pipe Clearances to Combustibles Vent Clearances and FramingHeat Shield Above First 900 Elbow RequiredNon-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Pipe DVP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Securing and Leveling the Appliance Installing the Fiberglass GasketChecking Pilot Plate Completing Grate Set-upAttach Vent to the Firebox Assembly Installing Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapAnsi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingAppliance Setup Ember Placement Install the Optional RefractoryInstall the Log Assembly Log Assembly LOGS-8OAKHeat & Glo 8000CF-OAK-IPI 2059-900 Rev. R 6/09 Install Trim and/or Surround Install the MeshAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADD305 mm DVP-TB1Service Parts Log Set AssemblyAt Depot Service Parts ListStocked Valve Assembly Contact Information