•For installations utilizing an ST475 Square Termination Cap the last chimney section must not be more than
|
|
|
|
|
| Flashing Collar | ||||||
Cap Standoff |
|
|
|
| 2 in. (51 mm) min. | |||||||
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
| ||||||
(38 mm) min. |
|
|
|
|
| (114 mm) | ||||||
overlap | Top of Pipe |
|
|
|
|
|
| max. |
Figure 6.7 Installing an ST475 Square Termination Cap
•For chase installations you can use a TR444 Round Termination Cap, a TR442 Round Telescoping Termination Cap, or an ST475 Square Termination Cap.
•Install termination caps following instructions provided with them.
Heat & Glo • | 23 |