Delkin Devices EI - 25-1 manual START-UP Procedure, Temporary SHUT-DOWN Procedure

Page 22
Turn flame and heat adjustment knob to the desired comfort level from HIGH to LOW. Turn thermostat to the desired comfort level or turn ON/OFF switch to the ON position.

EURO 25 -1

22

OPERATION INSTRUCTIONS - Continued

START-UP PROCEDURE

1. Set the thermostat, if present, to the lowest level. Set the flame adjustment knob to the HI position. Press slightly and turn the control knob clockwise 3 to the OFF position and wait 5 minutes; thus allowing any gases to escape which may have accumulated in the combustion chamber.

Note: LP gases do not vent upward. Then follow step 2 and 3 to establish pilot.

2. Press slightly and turn control knob counterclockwise 4 to PILOT position; depress control knob and light pilot by repeatedly pressing the sparker. Venting of air may take place at the pilot prior to the flow of fuel gases. Once flame is established, hold knob depressed for approximately 60 sec.

3. Release knob. If pilot should go out, turn the control knob to OFF position and repeat steps 1, 2 and 3.

Note: this will allow reset of INTERLOCK for proper lighting of pilot.

4. Press and turn control knob counterclockwise 4 to ON position.

5.

6.

TEMPORARY SHUT-DOWN PROCEDURE

7. To turn off the main burner only, set the thermostat to the lowest setting or turn remote switch to OFF. Press and turn the knob clockwise 3 to PILOT position.

COMPLETE SHUT-DOWN PROCEDURE

8. Press and turn the knob clockwise 3 to the OFF position.

Flame and Heat Adjustment Knob

Control Knob

Image 22
Contents Euro 25 Page Introduction Euro 25 Table of Contents Safety High Altitude Installation Installation CodesSpecifications General InformationAppliance Description & Dimensions Front View Surround Sparker Removable Control CoverInstallation Instructions Clearances to CombustiblesInstallation Instructions 15 ¼ 387 mm Precautions VentingVenting GAS ConnectionsSpill Switch is Connected to the Appliance FACTORY-WIRED Attachment of Fireplace SurroundPlacement of Brick Panels Glass DoorLOG Placement LOG Placement Euro 25 PIN Hole for LOG # Euro 25 For Your SAFETY, Read Before Lighting Initial Operation Operation InstructionsTemporary SHUT-DOWN Procedure START-UP ProcedureComplete SHUT-DOWN Procedure Maintenance Cleaning the ApplianceTroubleshooting Symptom ActionTroubleshooting Pilot Adjustment Servicing Under WarrantyAdjusting Primary AIR ServicingReplacement of FAN Valve ConnectionsChanging Main Burner Orifice Replacing GAS Component AssemblyReplacing Major GAS Components Convertible Pilot OrificePrecautions Appendix a½ to 7 ½ 15 ¼ 387 mm Vent Gasket Connector Kit BCV4-KIT or BCV5-KIT Sample Modification Warning Plate Sample Warning LabelInstallation Instructions Canadian Heating Product Model Montigo 28 SeriesFirehearth / Monterey Model Firesong 220 Series Gasglo Model GG 28 Series Archgard T-100 Series FMI Model 850 Series Important Information Natural GASArchgard Limited Warranty Replacement Parts for Euro Item # Description QTY UnitEuro 25 Warranty Registration Beatty Drive MISSION, B.C. Canada