Delkin Devices EI - 25-1 manual Gasglo Model GG 28 Series

Page 35

EURO 25 -1

35

INSTALLATION INSTRUCTIONS

INSTALLING THE EURO 25-1 GAS FIREPLACE INSERT HEATING APPLIANCE

INTO VENTED ZERO-CLEARANCE GAS FIREPLACE:

GASGLO MODEL GG 28 SERIES

CAUTION: Installation must be conducted by a qualified gas appliance installer. Gas and electrical power must be disconnected from the host gas fireplace before installation can begin.

1.Remove the screens and rod or glass door.

2.Remove the bottom door track.

3.Remove the pilot and valve assembly.

4.Cut the front legs of sandpan with an abrasive cutting disc or plasma cutter. Bend up sandpan to expose rear legs. Cut rear legs. Cut legs as close to the bottom as possible.

5.Cut out the top front baffle as shown, with an abrasive cutting disc or a plasma cutter.

6.Replace the control cover plate as a support for the insert.

7.The preparation of the host gas fireplace is complete. See Appendix A of the Euro-25-1 manual for further instructions. All installation requirements in the manual must also be carefully observed and followed.

8.Use Archgard BCV5 connector kit to connect the insert to the host’s B-vent or connect a 4” diameter flexible aluminum gas vent from the insert to the host’s vent cap.

*Optional custom surround is available for the GG 28 Series, Part # GG28BP-25. With this part, minimal finishing work is required. It will fill in the opening above the insert. Please contact Archgard Industries for the availability of this part.

2 ½

24”

ITEM 2.

ITEM 5.

Image 35
Contents Euro 25 Page Introduction Euro 25 Table of Contents Safety General Information Installation CodesSpecifications High Altitude InstallationFront View Surround Sparker Removable Control Cover Appliance Description & DimensionsClearances to Combustibles Installation InstructionsInstallation Instructions 15 ¼ 387 mm Venting PrecautionsGAS Connections VentingAttachment of Fireplace Surround Spill Switch is Connected to the Appliance FACTORY-WIREDGlass Door Placement of Brick PanelsLOG Placement LOG Placement Euro 25 PIN Hole for LOG # Euro 25 Operation Instructions For Your SAFETY, Read Before Lighting Initial OperationComplete SHUT-DOWN Procedure START-UP ProcedureTemporary SHUT-DOWN Procedure Cleaning the Appliance MaintenanceSymptom Action TroubleshootingTroubleshooting Servicing Servicing Under WarrantyAdjusting Primary AIR Pilot AdjustmentValve Connections Replacement of FANConvertible Pilot Orifice Replacing GAS Component AssemblyReplacing Major GAS Components Changing Main Burner OrificeAppendix a Precautions½ to 7 ½ 15 ¼ 387 mm Vent Gasket Connector Kit BCV4-KIT or BCV5-KIT Sample Warning Label Sample Modification Warning PlateCanadian Heating Product Model Montigo 28 Series Installation InstructionsFirehearth / Monterey Model Firesong 220 Series Gasglo Model GG 28 Series Archgard T-100 Series FMI Model 850 Series Natural GAS Important InformationArchgard Limited Warranty Item # Description QTY Unit Replacement Parts for EuroEuro 25 Warranty Registration Beatty Drive MISSION, B.C. Canada