Vermont Casting SDV30 manual Venting Requirements Natural Vent Only, Termination Clearances

Page 11

Stardance Direct Vent/Natural Vent Gas Heater

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

Outside Corner

Alcove Applications*

 

 

 

F =

 

 

G =

 

Combustible

G

Combustible

 

6"

(152 mm)

 

6" (152 mm)

V

Noncombustible

 

 

2"

(51 mm)

 

Noncombustible

 

V

 

F

 

2" (51 mm)

 

 

Balcony -

Balcony -

with no side wall

with perpendicular side wall

M

M

 

V

V

 

P

M =

Combustible &

Noncombustible

Combustible &

M = 24" (610 mm)

Noncombustible

P = 20” (508 mm)

12" (305 mm)

D

C C

V

E

O

E = Min. 6” (152 mm) for non-vinyl sidewalls Min. 12” (305 mm) for vinyl sidewalls

O = 8’ (2.4 m) Min.

No.

 

 

of Caps

DMin.

CMax.

1

3’ (.9 mm)

2 x DActual

2

6’ (1.8 m)

1 x DActual

3

9’ (2.7 m)

2/3 x DActual

4

12’ (3.7 m)

1/2 x DActual

DMin. = # of Termination caps x 3

CMax. = (2 / # termination caps) x DActual

584-15

*NOTE: Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be a 3’ (914 mm) minimum between termination caps. 2. All mechanical air intakes within 10’ (1 m) of a termination cap must be a minimum of 3’ (914 mm) below the termination cap. 3. All gravity air intakes within 3’ (914 mm) of a termination cap must be a minimum of 1’ (305 mm) below the termination cap.

Fig. 10 Termination clearances.

Venting Requirements - Natural Vent Only

(in feet)

unit before any elbow)

Vertical Run

from top of the

 

(Measured

��

��

�� A

�� B

��

��

��

��

��

��

��

��

��

��

������������������������������������������������������

Venting Runs

NOTE: When venting staight vertical, without any elbow, a minimum of 8 ft. vertical is required

off the top of the stove.

= Acceptable venting configuration = Unacceptable venting configuration

A:Vertical installations up to 36 feet (12m) in height. Up to an 18 ft. horizontal vent run can be installed within the vent system using a maximum of two 90-degree elbows or four 45-degree elbows.

B:Vertical installations up to 36 feet (12m) in height. Up to a 24 ft. horizontal vent run can be installed within the vent system using a maximum of two 45-degree elbows.

(Ratio = 2/3, Hor./Vert.)

Horizontal Run (in feet)

Fig. 11 Vent termination window - Natural Vent ONLY.

NOTE: When using the FSDHAG, the restrictor plate supplied with the stove is not used.

20007065

11

Image 11
Contents What to do if YOU Smell GAS Stardance Direct Vent/Natural Vent Gas HeaterTable of Contents General Information Stardance Direct Vent / Natural Vent Dimensions Materials Installation RequirementsClearance Requirements Minimum Clearances to CombustibleHearth Requirements Wall Centerline from FloorWall and Ceiling Clearances Horizontal Termination Direct Vent only Gas SpecificationsGas Inlet and Manifold Pressures High ElevationsDirect Vent Only Vertical Termination Direct Vent onlyVent Termination Clearances Location of Vent Termination Vent Termination ClearancesGeneral Venting Information Termination Location Canadian Installations1 US Installations2Termination Clearances Venting Requirements Natural Vent OnlyMinimum Horizontal Vent Kit Venting Requirements and OptionsApproved Vent System Components Simpson DuraVent ComponentsRemove rear skirt insert Install the Optional FanVenting System Assemlby Direct Vent General Information Install the Vent Adapter PipeSimpson Dura-Vent install inner adapter pipe Side Wall Termination AssemblyDetermine the vertical pipe length Vent Termination Below Grade Vertical Through the Roof Vent AssemblyInstall firestops and attic insulation shield Venting System Assembly Natural Vent General InformationAged Logs Install the Vent PipeInstall the Log Set Connect the Gas Supply LineBurner Information Air Shutter AdjustmentAir Shutter Adjustment Instructions Install ON/OFF Switch Complete the AssemblyThermostat Connection optional Install the Front PlateThermostat Wire / Gauge This completes assembly of the Stardance stovePilot and Burner Inspection Flame & Temperature AdjustmentFlame Characteristics Your First Fire OperationTo Turn Off Gas To Heater Lighting and Operating InstructionsSymptom Possible Causes Corrective Action Troubleshooting / Honeywell #8420 Gas Control SystemDelay Timer Mode Shut Off ProcedureTransmitter Operation Off Mode On Manual ModeDisable Thermostat Function Auto ModeFan Override During Auto Mode Change Between F/C Temperature UnitsLocal Path Auto Path Models 3900, 3910 R Models Only Honeywell Valve Conversion PrecautionsConversion Procedure Fuel Conversion InstructionsPilot Orifice Conversion Pilot type000-5011 Injector Orifice Size MatrixModels 3940, 3950 RF Models Only All ModelsGlass Replacement MaintenanceLogset and Burner Cleaning and Inspection Cleaning the GlassCheck the Gas Flame Regularly Gasket ReplacementStove Disassembly Inspect the Vent System AnnuallyBLK Wiring DiagramsSDV30 DescriptionStardance Direct Vent/Natural Vent Gas Heater SDV30 Fuel Conversion Kits Optional Accessories Stardance Direct Vent/Natural Vent Gas Heater Stardance Direct Vent/Natural Vent Gas Heater Product Covered by this Warranty Limited Lifetime WarrantyProduit Couvert PAR LA Présente Garantie SI UN Service Sous Garantie EST REQUIS…Model EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings