General Information
Assembling Vent Pipes
SK8 Venting Pipes
Canadian Installations:
The venting system must be installed in accordance with the current
USA Installations:
The venting system must conform with local codes and/ or the current National Fuel Gas code ANSI Z223.1/ NFPA 54.
Only venting components manufactured by CFM Cor- poration can be used in Direct Vent systems.
NOTE: The joints of the inner pipe (flue pipe) must be taped with 550°F or higher temperature metal adhesive tape that meets the requirements of F.A.R. 25.853(a) High temperature sealant milpack or stove cement
of 550°F or higher could be used instead. The joints of The outer pipe (fresh air pipe) must be taped with 315°F or higher temperature metal adhesive tape or the use of high temperature milpack or stove cement would be applicable. When using the unitized 30°, 45° or 90° elbows, apply 1/4” bead of high temperature, 550°F or higher, sealant (milpack or stove cement) to the joint of the inner pipe (flue pipe) and the straight section as it is impossible to be taped. The outer pipe must be taped with 315°F high temperature metal adhesive tape for proper sealing.
Start by attaching the first vent pipe section to the collar on top of the fireplace. In order to attach the first pipe section, it may be necessary to remove the top shield. Remove four (4) screws securing top shield, install first pipe section and replace top shield.
Install the pipe as shown in Figure 14. When you get a good lock, you will hear the pipe clearly snap together. Once sections are
When installing elbows, follow the same procedure. The joints of inner and outer elbow must be taped with UL approved high temperature metal adhesive tape for proper sealing. Be sure to always attach straps on up- per elbow to a structural framing member.
For vertical installations, continue installing the pipe as required until pipe is installed up through the ceiling. At this point, you must install a firestop spacer.
Chateau™
Pipe Section
Pipe
Rim
Hem
Lance
Pipe
Rim
FP1368
Fig. 14 Install pipe, listening for the
Horizontal Termination
The vent must rise vertically a minimum of 24” (610mm) off the top of the unit, before the first elbow. The hori- zontal run may extend up to 20’ (6 m) and include a ver- tical rise of up to 40’ (12 m). (Fig. 15) Horizontal termi- nation must also meet the criteria shown in Figures 12 & 13.
•Approved vent systems must terminate above and including the heavy line in Figure 15.
•Two 45° elbows may be substituted for each single 90° elbow.
•With a rise between 2’ - 4’, one (1) 90° or two (2) 45° elbows may be used.
Vertical Termination
A vertical vent system must terminate no less than 12’ (3.66 m) and no more than 40’ (12 m) above the appli- ance flue collar. A 2’ (610 mm) vertical section must be installed before any offset. A maximum of 20’ (6.1 m) horizontal and three (3) 90° elbows may be installed with a minimum of 12’ (3.66 m) vertical section above the flue collar of the unit. Refer to Page 21, Figure 26 for more information.
A vertically terminated vent system must also conform to the following criteria:
•No more than three (3) 90° elbows may be used.
•Two (2) 45° elbows may be substituted for one (1) 90° elbow. No more than six (6) elbows may be used.
•Vent must rise a minimum of 2’ (610 mm) before offset is used.
•Termination height must conform to roof clearance as specified in Figure 33.