MACHINE PREPARATION
BATTERY LEVER
Fig 5
LOCK BATTERY IN PLACE WITH LEVER
Fig 6
CONNECTING BATTERY
Fig 7
MACHINE POWER CONNECTOR |
BATTERY POWER CONNECTOR |
Fig 8
BATTERY INSTALLATION
1.Lift the machine front cover.
2.Rotate the battery lever to the right.
3.Lower the battery into place using a 2000 LB. (907 KG) capacity lifting device.
4.Rotate the battery lever to the left to lock the battery into place.
5.Connect battery wires according to manufacturer’s direction.
6.Connect the battery power connector to the machine power connector.
7.Lower the machine front cover into place.
WARNING
Do not leave charged batteries on concrete surface, they will discharge.
SMART |
|