Munchkin Gas-Fired Hot Water Boiler manual Diagrams for Vertical Venting

Page 45

GAS-FIRED BOILER

Boiler Manual

K. DIAGRAMS FOR VERTICAL VENTING

ROOF VENT WITH TEE (INTAKE)

AND COUPLING (EXHAUST)

STRAIGHT

COUPLING

24" MIN.

10'-0" MIN.

TEE

12" OVER MAXIMUM SNOW LEVEL OR 24"

WHICHEVER IS GREATER

SUPPORT BRACKETS

MUST BE USED ON

ALL HORIZONTAL

AND VERTICAL PIPING

INTAKE AIR

VENT

RIGHT SIDE VIEW

EXTERIOR WALL

EXHAUST

 

VENT

 

ROOF VENT WITH TEE (INTAKE)

AND COUPLING (EXHAUST)

EXHAUST VENT

 

(STRAIGHT

 

COUPLING)

24" MIN.

10'-0" MIN.

12" OVER MAXIMUM

SNOW LEVEL OR 24"

WHICHEVER IS GREATER

INTAKE AIR VENT (TEE)

SUPPORT BRACKETS

MUST BE USED ON

ALL HORIZONTAL

AND VERTICAL PIPING

ROOF VENT WITH

CONCENTRIC VENT KIT

10'-0" MIN.

12" OVER MAXIMUM SNOW LEVEL OR 24"

WHICHER IS GREATER

SUPPORT BRACKETS

MUST BE USED ON

ALL HORIZONTAL

AND VERTICAL PIPING

INTAKE AIR

VENT

EXHAUST

VENT

RIGHT SIDE VIEW

EXTERIOR WALL

ROOF VENT WITH

CONCENTRIC VENT KIT

10'-0" MIN.

12" OVER MAXIMUM SNOW LEVEL OR 24"

WHICHEVER IS GREATER

SUPPORT BRACKETS

MUST BE USED ON

ALL HORIZONTAL

AND VERTICAL PIPING

RIGHT SIDE

VIEW

RIGHT SIDE

VIEW

EXTERIOR WALL

Figure 7-13

EXTERIOR WALL

Figure 7-14

NOTE: When placing support brackets on vent piping, the first bracket must be within 1 foot of the appliance and the balance at 4 foot invervals on the vent pipe. The boiler venting must be readily accessible for visual inspection for the first three feet from the boiler.

GENERAL NOTE: All vent pipes must be glued, properly supported and the exhaust must be pitched a minimum of a ¼" per foot back to the heater (to allow drainage of condensate).

44

Image 45
Contents Boiler Manual Contents Contents CONT’D Definitions Part 1 Product and Safety InformationWhen Servicing Boiler Before InstallingBoiler Operation Boiler WaterReturn water temperature sensor Supply water temperature sensorTemperature and pressure gauge Stainless Steel Heat ExchangerSpark ignition Part 3 Prepare Boiler LocationVision 1 System Boiler Location should be LevelPerformance Ratings Connection Sizes FAN Speeds Dimensions80M 140M/199M Before Locating the Boiler Installations Must Comply withClearances for Service Access PrecautionsResidential Garage Installation Exhaust Vent and Intake AIR VentCorrosive contaminants and sources When Removing a Boiler from AN Existing Common Vent SystemPart 5 Boiler Piping Remove Boiler from BOXRelief Valve Diaphragm or bladder expansion tank Part 5 Boiler Piping Circulator Sizing Circulator Sizing ChartFill and Purge Heating System System Temperature Rise ChartZoning with Zone Valves Zoning with CirculatorsMultiple Boilers Boiler Piping Details Piping Symbol LegendOFF Zone valves Make-up water Boiler Manual Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Vision I System Piping Zoning with Circulators Using VisionBoiler Piping Details with the Vision I System Space heating modeOFF DHW Space heating mode w/ submixing Water OFF Munchkin Vision 1 system zoning with circulators Space heating mode 3 fully reset supply temperatures Space heating mode 3 different supply temperatures OFF Thermal trap Drain plug Installing Exhaust Vent and Intake AIR Vent GeneralExhaust Vent and Intake AIR Vent Pipe Location Part 7 VENTING, Combustion AIR & Condensate Removal Reference National Fuel Gas Code Ansi Z223.1/NFPA 54 Exhaust Vent and Intake AIR Pipe Installation Exhaust Vent and Intake AIR Vent SizingLonger Vent Runs Vent Termination Kits Description Stock Code Heater Removal from a Common Vent System Condensate Removal System Sidewall Venting with TEE Intake Coupling Exhaust Diagrams for Sidewall VentingSidwall Venting with KIT Roof Vent with TEE Intake Coupling Exhaust Diagrams for Vertical VentingGAS Connection Part 8 GAS PipingGAS Piping GAS TableDungs GAS Valve for T50/T80/80M/140M/199M OFF SET AdjustmentField Wiring Installation Must Comply withLine Voltage Wiring Krom Schroder Valve for 399MPart 9 Field Wiring Part 9 Field Wiring Indirect Circulator P2 Program Part 10 Field Wiring VisionPart 11. START-UP Preparation Check for GAS Leaks Purge AIR from Water SystemCheck Thermostat Circuits Final Checks Before Starting Boiler Check Condensate RemovalAdjusting the Setpoint Part 12. START-UP ProcedureOperating Instructions Status MenuTest Mode Vision 1 Program AccessProgramming the Vision I Option Vision 1 Program Navigation Boiler cannot be programmed while there is a call for heatDefault Function Function Value Description FunctionCentral Heating Curve Function Function Default Setting Programmed Setting Control Program Reference ChartMunchkin Error Code Boiler ErrorBoiler Fault 925 Control Board Fault Codes Description Remedy Part 14 TroubleshootingOutdoor Sensor 7250P-319 Maintenance ProceduresSure Exhaust Vent is no Longer Blocked For GAS LeaksT50M/T80M Part 15 MaintenanceT50M/T80M 80M/140M/199M Boiler Replacement Parts Boiler Boiler Boiler Start UP ReportManual Boiler Inspection and Maintenance ScheduleBoiler Inspection and Maintenance Schedule Maintenance Notes Maintenance Notes Maintenance Notes Heat Transfer Products, Inc LP-185 REV /20/07