GAS-FIRED BOILER

Boiler Manual

Munchkin VISION 1 system (zoning with valves) Domestic water heating mode

Drawing 3B

cold

water

high limit safety

OFF

make-up water

purge

 

 

 

 

purge

 

 

anti-scald mixing valve

 

 

 

 

 

OFF

 

 

DHW

P1

 

 

temperature

outdoor

 

sensor

 

 

 

 

temperature

 

 

 

sensor

 

P2

T/P

 

 

 

 

 

 

purge

 

Super Stor

thermal trap

 

(w/ drain plug)

Munchkin boiler

indirect DHW tank

 

 

 

zone valves

differential pressure bypass valve

NOTES:

1.This drawing is meant to show system piping concept only.

Installer is responsible for all equipment & detailing required by local codes.

2.All closely spaced tees shall be within 4 pipe diameter center to center spacing.

3.A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees.

4.The minimum pipe size for connecting a Super Stor water heater is 1 inch.

5.The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M.

6.All pumps are shown with isolation flanges and integral flow check valves.

The alternative is standard flanges with full port ball valves and a separate flow check valve.

7.The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119˚F.

8.Install a minimum of 12 diameters of straight pipe upstream of all circulators.

9.A purging valve may be used in lieu of the ball valve / hose bib combination shown.

10.Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself.

27

Image 28
Contents Boiler Manual Contents Contents CONT’D Part 1 Product and Safety Information DefinitionsBefore Installing When Servicing BoilerBoiler Operation Boiler WaterSupply water temperature sensor Return water temperature sensorTemperature and pressure gauge Stainless Steel Heat ExchangerPart 3 Prepare Boiler Location Spark ignitionVision 1 System Boiler Location should be LevelDimensions Performance Ratings Connection Sizes FAN Speeds80M 140M/199M Installations Must Comply with Before Locating the BoilerPrecautions Clearances for Service AccessResidential Garage Installation Exhaust Vent and Intake AIR VentWhen Removing a Boiler from AN Existing Common Vent System Corrosive contaminants and sourcesRemove Boiler from BOX Part 5 Boiler PipingRelief Valve Diaphragm or bladder expansion tank Part 5 Boiler Piping Circulator Sizing Chart Circulator SizingSystem Temperature Rise Chart Fill and Purge Heating SystemZoning with Circulators Zoning with Zone ValvesMultiple Boilers Piping Symbol Legend Boiler Piping DetailsOFF Zone valves Make-up water Boiler Manual Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Zoning with Circulators Using Vision Vision I System PipingSpace heating mode Boiler Piping Details with the Vision I SystemOFF DHW Space heating mode w/ submixing Water OFF Munchkin Vision 1 system zoning with circulators Space heating mode 3 fully reset supply temperatures Space heating mode 3 different supply temperatures OFF Thermal trap Drain plug General Installing Exhaust Vent and Intake AIR VentExhaust Vent and Intake AIR Vent Pipe Location Part 7 VENTING, Combustion AIR & Condensate Removal Reference National Fuel Gas Code Ansi Z223.1/NFPA 54 Exhaust Vent and Intake AIR Vent Sizing Exhaust Vent and Intake AIR Pipe InstallationLonger Vent Runs Heater Removal from a Common Vent System Vent Termination Kits Description Stock CodeCondensate Removal System Diagrams for Sidewall Venting Sidewall Venting with TEE Intake Coupling ExhaustSidwall Venting with KIT Diagrams for Vertical Venting Roof Vent with TEE Intake Coupling ExhaustPart 8 GAS Piping GAS ConnectionGAS Piping GAS TableOFF SET Adjustment Dungs GAS Valve for T50/T80/80M/140M/199MInstallation Must Comply with Field WiringLine Voltage Wiring Krom Schroder Valve for 399MPart 9 Field Wiring Part 9 Field Wiring Part 10 Field Wiring Vision Indirect Circulator P2 ProgramPart 11. START-UP Preparation Purge AIR from Water System Check for GAS LeaksCheck Thermostat Circuits Check Condensate Removal Final Checks Before Starting BoilerPart 12. START-UP Procedure Adjusting the SetpointOperating Instructions Status MenuVision 1 Program Access Test ModeProgramming the Vision I Option Boiler cannot be programmed while there is a call for heat Vision 1 Program NavigationFunction Default Function Function Value DescriptionCentral Heating Curve Function Control Program Reference Chart Function Default Setting Programmed SettingBoiler Error Munchkin Error CodeBoiler Fault Part 14 Troubleshooting 925 Control Board Fault Codes Description RemedyMaintenance Procedures Outdoor Sensor 7250P-319For GAS Leaks Sure Exhaust Vent is no Longer BlockedPart 15 Maintenance T50M/T80MT50M/T80M 80M/140M/199M Boiler Replacement Parts Boiler Boiler Start UP Report BoilerBoiler Inspection and Maintenance Schedule ManualBoiler Inspection and Maintenance Schedule Maintenance Notes Maintenance Notes Maintenance Notes Heat Transfer Products, Inc LP-185 REV /20/07