Munchkin 399M manual Piping Symbol Legend, Piping Illustrations

Page 20

PIPING

D. PIPING ILLUSTRATIONS

Piping Symbol Legend

 

circulator

pressure reducing valve

 

(w/ isolation flanges)

 

 

 

circulator w/

 

 

integral flow check)

 

 

 

diff. pressure bypass

 

gate valve

 

 

globe valve

anti-scald rated

 

 

mixing valve

 

ball valve

 

 

 

pressure gauge

 

swing-check valve

 

 

flow-check valve

4-way motorized

 

mixing valve

 

spring-loaded check valve

3-way motorized

Munchkin heater

 

 

mixing valve

 

hose bib / boiler drain

 

 

 

pressure relief valve

 

thermostatic radiator valve

 

 

TRV (straight)

backflow preventer

 

 

 

thermostatic radiator valve

 

 

TRV (angle)

float -type

 

 

 

 

air vent

 

circuit setter

union

 

 

 

manual 3-way valve

 

 

 

heat exchanger

 

zone valve

 

 

air separator

vacuum breaker

Super Stor

 

 

 

indirect DHW tank

diaphragm-type

 

 

expansion tank

 

 

 

radiant manifold

 

Fig. 5-2

 

 

20

Image 20
Contents Munchkin High Efficiency 399M Commercial Boiler What to do if YOU Smell GASUsing this Manual Using this ManualTable of Contents Munchkin Ratings and Dimensions Part 1. General InformationGeneral Information HOW IT OperatesDimensions PRE-INSTALLATION Requirements Part 2. Electrical General Information / ElectricalPressure Relief Valve Electrical ConnectionElectrical Part 3. GAS Connection Electrical / GAS ConnectionGAS Connection GAS ConnectionGAS Piping GAS TableCombustion Settings Munchkin Burnertech GAS ValvePart 4. Venting VentingApproved Venting Materials Venting the Munchkin in 4 or 6 Plastic PipeVenting Important Note Longer Vent Runs Using a Combination 4 to 6 Pipe Fittings or Piping Equivalent FeetDiagrams for Sidewall Venting Heater Removal from a Common Vent SystemDiagram for Vertical Venting Part 5. Piping Venting / PipingCondensate Requirements Hydronic Piping with Circulators or Zone ValvesPiping Circulator SizingFill and Purge Heating System Piping Symbol Legend Piping IllustrationsZone valves Make-up water Zone valves Mixing valve Zone valves Make-up water Piping Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Part 6. START-UP Procedures START-UP ProceduresItems to be Checked Before Lighting the Munchkin Lighting InstructionsAdjusting the Temperature on the Munchkin Display Operating InstructionsTo Turn OFF GAS to Appliance Test ModeStatus Menu START-UP Procedures / Servicing Munchkin Temporary Fault ConditionPart 7. Servicing Sequence of OperationMunchkin Fault Requiring Manual Reset ServicingServicing Remedy Call Factory for further assistance Resistance Tables Part 8. Maintenance MaintenanceLeaks Control Wiring Layout Munchkin ControllerMaintenance Maintenance Page Page Heat Transfer Products, Inc LP-121 REV /20/04