Munchkin 399M manual Leaks

Page 38

MAINTENANCE

in which case, a qualified plumber will need to be contacted to follow the Coil Cleaning Instructions (Section D) included in this section to dissolve deposit and clean condensate line.

DANGER

IT IS EXTREMELY IMPORTANT TO MAKE SURE THE EXHAUST VENT IS NO LONGER BLOCKED. FAILURE TO DO SO MAY RESULT IN PERSONAL INJURY OR DEATH.

D. COMBUSTION CHAMBER COIL CLEANING INSTRUCTIONS*

*Before beginning this procedure, you must have on hand the following items:

a nylon, stainless or brass brush (not steel)

“Rydlyme” (recommended for best results) (available on line www.rydlyme.com) or “CLR” (available at most hardware stores)

1.Shut down the Munchkin by using the following steps:

a.Close the gas valve, shut down the unit and wait for the unit to be cool to the touch

b.Disconnect the condensate hose from the outside connection, (not from the Munchkin side), so the flow can be observed.

c.Remove screws and loosen bracket holding gas valve in place.

d.Pull connector to the venturi by sliding gas valve to left, remembering to disconnect both Molex connectors.

e.Remove the (6) 10MM nuts from the burner plate assembly to access the coils.

f.Pull the entire burner plate assembly towards you, while removing or pushing aside any wiring to allow the removal of the assembly.

2.Using a spray bottle filled with the recommeded product “MARSOLVE” or “CLR”, spray liberally on the coils, making sure the solution penetrates and funnels down through the condensate hose. If the con- densate hose is blocked, let the chemical penetrate for at least 15 minutes or until it drains.

3.Use the nylon, stainless or brass brush (do not use steel) and scrub coils to remove any buildup, then vacuum the debris from the coils.

4.Spray the coils with clear water, making sure to confine the spray to the area being cleaned (Try to avoid getting the back cermic wall of the unit wet). Flush the combustion chamber with fresh water. At this point, the Munchkin should be ready to power back up.

Before powering up the Munchkin follow the steps below

a.Re-install the burner assembly

b.Replace the (6) 10MM nuts to the burner plate

c.Re-connect the Molex connectors

d.Re-connect gas valve, air-gas mixer and replace bracket. (IMPORTANT: CHECK FOR GAS

LEAKS)

e.Re-set thermostats (IMPORTANT: MAKE SURE EXHAUST VENT IS NO LONGER BLOCKED!)

f.Turn the Munchkin back on** and observe condensate flow.

DANGER

IT IS EXTREMELY IMPORTANT THAT YOU CHECK FOR LEAKS WHEN RECONNECTING THE GAS VALVE AND MAKING SURE THE EXHAUST VAN IS NO LONGER BLOCKED. FAILURE TO DO SO MAY RESULT IN SEVERE PERSONAL INJURY OR DEATH.

g. Re-connect the condensate hose to the outside connection.

**NOTE: When firing up the boiler for the first few times you may experience some flut- tering of the gas burner that may result in a flame lockout. This is normal and will require you to re-cycle the unit until this clears up. This is caused by water still present in the combustion chamber.

38

Image 38
Contents Munchkin High Efficiency 399M Commercial Boiler What to do if YOU Smell GASUsing this Manual Using this ManualTable of Contents General Information Munchkin Ratings and DimensionsPart 1. General Information HOW IT OperatesDimensions PRE-INSTALLATION Requirements Pressure Relief Valve Part 2. ElectricalGeneral Information / Electrical Electrical ConnectionElectrical Part 3. GAS Connection Electrical / GAS ConnectionGAS Piping GAS ConnectionGAS Connection GAS TableCombustion Settings Munchkin Burnertech GAS ValveApproved Venting Materials Part 4. VentingVenting Venting the Munchkin in 4 or 6 Plastic PipeVenting Important Note Longer Vent Runs Using a Combination 4 to 6 Pipe Fittings or Piping Equivalent FeetDiagrams for Sidewall Venting Heater Removal from a Common Vent SystemDiagram for Vertical Venting Condensate Requirements Part 5. PipingVenting / Piping Hydronic Piping with Circulators or Zone ValvesPiping Circulator SizingFill and Purge Heating System Piping Symbol Legend Piping IllustrationsZone valves Make-up water Zone valves Mixing valve Zone valves Make-up water Piping Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Items to be Checked Before Lighting the Munchkin Part 6. START-UP ProceduresSTART-UP Procedures Lighting InstructionsAdjusting the Temperature on the Munchkin Display Operating InstructionsTo Turn OFF GAS to Appliance Test ModeStatus Menu Part 7. Servicing START-UP Procedures / ServicingMunchkin Temporary Fault Condition Sequence of OperationMunchkin Fault Requiring Manual Reset ServicingServicing Remedy Call Factory for further assistance Resistance Tables Part 8. Maintenance MaintenanceLeaks Control Wiring Layout Munchkin ControllerMaintenance Maintenance Page Page Heat Transfer Products, Inc LP-121 REV /20/04