Munchkin 399M manual PB1 PB2

Page 27

PIPING

Standard Munchkin boiler Preferred piping

(multiple boilers / zoning with circulators) Space heating mode

Drawing 2E

space heating zone circuit

zone

circulators make-up water

closely spaced tees

purging valves

anti-scald mixing valve

P2

PB1

PB2

cold water

T/P

T/P

Munchkin boiler

Munchkin boiler

Super Stor

indirect DHW tank

 

 

NOTES:

1.This drawing is meant to show system piping concept only.

Installer is responsible for all equipment & detailing required by local codes.

2.All closely spaced tees shall be within 4 pipe diameter center to center spacing.

3.A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees.

4.The minimum pipe size for connecting a Super Stor water heater is 1 inch.

5.The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches.

6.All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.

7.The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119˚F.

8.Install a minimum of 12 diameters of straight pipe upstream of all circulators.

9.A purging valve may be used in lieu of the ball valve / hose bib combination shown.

Fig. 5-9

27

Image 27
Contents What to do if YOU Smell GAS Munchkin High Efficiency 399M Commercial BoilerUsing this Manual Using this ManualTable of Contents HOW IT Operates Munchkin Ratings and DimensionsPart 1. General Information General InformationDimensions PRE-INSTALLATION Requirements Electrical Connection Part 2. ElectricalGeneral Information / Electrical Pressure Relief ValveElectrical Electrical / GAS Connection Part 3. GAS ConnectionGAS Table GAS ConnectionGAS Connection GAS PipingMunchkin Burnertech GAS Valve Combustion SettingsVenting the Munchkin in 4 or 6 Plastic Pipe Part 4. VentingVenting Approved Venting MaterialsVenting Important Note Fittings or Piping Equivalent Feet Longer Vent Runs Using a Combination 4 to 6 PipeHeater Removal from a Common Vent System Diagrams for Sidewall VentingDiagram for Vertical Venting Hydronic Piping with Circulators or Zone Valves Part 5. PipingVenting / Piping Condensate RequirementsCirculator Sizing PipingFill and Purge Heating System Piping Illustrations Piping Symbol LegendZone valves Make-up water Zone valves Mixing valve Zone valves Make-up water Piping Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Lighting Instructions Part 6. START-UP ProceduresSTART-UP Procedures Items to be Checked Before Lighting the MunchkinOperating Instructions Adjusting the Temperature on the Munchkin DisplayTest Mode Status MenuTo Turn OFF GAS to Appliance Sequence of Operation START-UP Procedures / ServicingMunchkin Temporary Fault Condition Part 7. ServicingServicing Munchkin Fault Requiring Manual ResetServicing Remedy Call Factory for further assistance Resistance Tables Maintenance Part 8. MaintenanceLeaks Munchkin Controller Control Wiring LayoutMaintenance Maintenance Page Page Heat Transfer Products, Inc LP-121 REV /20/04