Munchkin 399M manual Zone valves Make-up water

Page 24

PIPING

Standard Munchkin boiler

Preferred piping (zoning with valves) Domestic water heating mode

Drawing 2B

 

zone valves

 

 

 

make-up water

OFF

OFF

OFF

OFF

P2

 

 

 

 

 

 

 

closely

 

 

 

differential

spaced

 

 

 

pressure

tees

 

 

 

bypass

 

 

 

 

valve

purging

V1

 

 

 

valves

 

 

 

 

 

 

 

 

anti-scald

 

 

 

mixing valve

 

 

 

 

cold

 

 

 

 

water

 

P1

 

 

 

 

T/P

 

 

 

 

Munchkin boiler

 

Super Stor

 

 

indirect DHW tank

 

 

 

NOTES:

 

 

 

 

1.This drawing is meant to show system piping concept only.

Installer is responsible for all equipment & detailing required by local codes.

2.Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself.

3.The minimum pipe size for connecting a Super Stor water heater is 1 inch.

4.The minimum pipe size for connecting a Munchkin boiler is 1.25 inches.

5.All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.

6.The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119˚F.

7.Install a minimum of 12 diameters of straight pipe upstream of all circulators.

8.A purging valve may be used in lieu of the ball valve / hose bib combination shown.

9.A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees.

Fig. 5-6

24

Image 24
Contents Munchkin High Efficiency 399M Commercial Boiler What to do if YOU Smell GASUsing this Manual Using this ManualTable of Contents Munchkin Ratings and Dimensions Part 1. General InformationGeneral Information HOW IT OperatesDimensions PRE-INSTALLATION Requirements Part 2. Electrical General Information / ElectricalPressure Relief Valve Electrical ConnectionElectrical Part 3. GAS Connection Electrical / GAS ConnectionGAS Connection GAS ConnectionGAS Piping GAS TableCombustion Settings Munchkin Burnertech GAS ValvePart 4. Venting VentingApproved Venting Materials Venting the Munchkin in 4 or 6 Plastic PipeVenting Important Note Longer Vent Runs Using a Combination 4 to 6 Pipe Fittings or Piping Equivalent FeetDiagrams for Sidewall Venting Heater Removal from a Common Vent SystemDiagram for Vertical Venting Part 5. Piping Venting / PipingCondensate Requirements Hydronic Piping with Circulators or Zone ValvesPiping Circulator SizingFill and Purge Heating System Piping Symbol Legend Piping IllustrationsZone valves Make-up water Zone valves Mixing valve Zone valves Make-up water Piping Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Part 6. START-UP Procedures START-UP ProceduresItems to be Checked Before Lighting the Munchkin Lighting InstructionsAdjusting the Temperature on the Munchkin Display Operating InstructionsTest Mode Status MenuTo Turn OFF GAS to Appliance START-UP Procedures / Servicing Munchkin Temporary Fault ConditionPart 7. Servicing Sequence of OperationMunchkin Fault Requiring Manual Reset ServicingServicing Remedy Call Factory for further assistance Resistance Tables Part 8. Maintenance MaintenanceLeaks Control Wiring Layout Munchkin ControllerMaintenance Maintenance Page Page Heat Transfer Products, Inc LP-121 REV /20/04