IDEAL INDUSTRIES HE15, HE9, HE18, HE12 manual Roof Flue KIT Contents / Options

Page 23

INSTALLATION

31 FITTING THE OPTIONAL ROOF FLUE KIT (Flat or Pitched)

Note.

A flat or pitched roof flashing plate (not supplied) is required before proceeding with the installation of this kit.

This kit is suitable for both flat and pitched roof terminations, using a concentric flue to run vertically from the top of the boiler and terminating above roof level.

Connection to the top of the boiler is made using a separately supplied vertical connector kit.

WEATHER PROOFING

Where the flue passes through the roof line an adequate seal must be made. This is achieved by using either:

Flat roof weather collar or Universal weather collar.

ACCESSORIES

Flue Duct Extension Kits are available for flue lengths extending beyond 1m. These packs contain 1m extension ducts and may be cut to the desired length.

If the offset vertical option is used an elbow Kit is required. For a full accessories list refer to page 6, Optional Extras and Frame 34, Flue Arrangement.

ex7534

32 ROOF FLUE KIT CONTENTS / OPTIONS

A.Flue assembly with terminal

B.Flue seal collar

C.3,5x13 screw

D.Pitched roof tile/flat roof tile weather collar

E.Vertical connector (60/100)/ boiler vertical conversion kit

F.Roof flue extension duct kit (60/100)

G.90o elbow kit (60/100)

H.45o elbow kit (60/100)

G F

H

A

D

E

OUTLET

C

B

mxhe7681

Note. Items D, E, F, G and H are not supplied with the roof flue kit.

FLUE

classic HE - Installation & Servicing

23

Image 23
Contents Installation and servicing Classic HE Installation & Servicing Document Amendments HE12 HE15 HE18 Key to symbolsGeneral General DataClassic HE Location of Boiler General IntroductionSafe Handling Optional Extra KitsSide and Rear Flue Installation from inside onlyGeneral Boiler Water Connections Boiler ClearancesBathrooms Flue InstallationCompartment Installations GAS SupplyWater Circulation System General TerminalAIR Supply Water TreatmentCondensate Drain Refer to Frames 38, 39 LOW Head InstallationsElectrical Supply Open Vent System Requirements Fully PumpedGeneral Sealed System Requirements Sealed System Requirements Boiler Assembly Exploded view InstallationPack B Contents Installation UnpackingUnpack and check the contents Pack a Contents Hardware Pack 1 ContentsSide Outlet Kit Product No Installation Packaging and Casing RemovalDetermining the Flue Length Pack Product NoPreparing the Wall Flue Assembly Exploded ViewWall Mounting Template Remove any burrs and remove the inner flue support ring Cutting the Flue wall thicknesses of 75 to 705mmCut to length X, refer to Frame Without Optional Flue finishing Kit Connecting the Flue to the BoilerWall Mounting Plate Mounting the BoilerFor wall thickness 270mm to 775mm Cutting the Flue For flue lengths 270 to 775mm only Fitting the Flue AssemblyFlues over 1 metre long Installation Mounting the BoilerFitting the KIT Flue Extension DuctsFlue Roof Flue KIT Contents / OptionsFlue Arrangement Installation Flue Terminal PositionTerminal Position Minimum Dimension Engagement in the final flue duct seal Installation Assembling the Roof Flue KITCondensate Drain Condensate Pipe Termination ConfigurationsGAS Connection Water ConnectionsCondensate Pipe Termination Configurations External Controls Electrical ConnectionsBlue Black Brown Grey Orange Thermostat Pink Installation Pictorial WiringMID Position Valve Pumped only ThermostatBlue Yellow/green Black Orange Brown Violet Red Pink White Installation TWO Spring Closed ValveFrost Protection Initial Lighting Installation Commissioning and TestingFitting the Boiler Casing See diagram A, Frame To gain access to the gas valveWater Circulating System Initial LightingGeneral Checks Handing OverDisconnect the electrical supply and turn off gas supply Servicing Servicing ScheduleBoiler Front Panel Removal Burner and AIR BOX RemovalCleaning the Recuperator Servicing Cleaning the FAN Assembly / the FluewaysCleaning the Burner and Pilot Assembly Replacement of Parts General Servicing Cleaning the SiphonReassembly GAS Pressure AdjustmentThermistor sensor lead Servicing Overheat Thermostat ReplacementOn/off switch Thermostat controlPull off the two electrical connections Servicing Limit Thermostat ReplacementFlue Protection Thermostat Replacement Pilot Burner ReplacementGAS Control Valve Replacement Servicing Ignition Electrode and Lead ReplacementMain Burner and Main Burner Injector Replacement Combustion Chamber Insulation Replacement Servicing FAN ReplacementAIR Pressure Switch APS Replacement Printed Circuit Board PCB ReplacementServicing Heat Exchanger ReplacementCasing Front Seal Replacement Servicing Siphon Replacement Finding Fault FindingGC Part No Description Qty Product No Short List of PartsShort List of Parts Short Parts List Installer Notification Guidelines GAS Boiler Commissioning Checklist Service 7 Date Service 1 DateService 3 Date Service 5 DateCertified Product Technical TrainingUsers guide Minimum Clearances SafetyElectricity Supply Important NotesTo Shut Down the Boiler Control of Water TemperatureCleaning MaintenancePoints for the Boiler User
Related manuals
Manual 60 pages 45.45 Kb

HE12, HE15, HE18, HE9 specifications

The IDEAL INDUSTRIES HE series, comprising the HE24, HE18, HE15, and HE12 models, represents a significant advancement in the field of electrical testing and measurement tools. These versatile testers stand out in professional environments for their high accuracy, user-friendly interfaces, and advanced features designed to enhance efficiency and reliability in electrical inspections.

The HE24 is the flagship model, boasting an extensive range of functionalities. It includes advanced digital multimeter capabilities, allowing for precise measurements of voltage, current, and resistance. Its True RMS feature ensures accurate readings, even with non-linear loads. The HE24 also incorporates advanced connectivity options, including Bluetooth technology, enabling users to transfer data wirelessly to smartphones or tablets for further analysis. The large, backlit display enhances visibility in various lighting conditions, making it an ideal tool for both indoor and outdoor use.

The HE18 model, while slightly more streamlined than the HE24, still offers robust capabilities. It features multiple testing modes, including continuity and diode testing, catering to a wide range of electrical tasks. The HE18 also utilizes a user-friendly interface, allowing technicians to navigate easily through various functions. Equipped with a protective rubber housing, this model is durable and built to withstand the rigors of frequent use on job sites.

The HE15 and HE12 models represent the compact, entry-level offerings in the HE series. Designed for the budget-conscious user, these models retain essential functionalities such as basic voltage and current measuring capabilities while prioritizing ease of use. The HE15 includes a simple LED indicator to signal when measurements are being taken, promoting straightforward operation. Additionally, the HE12 features a lightweight design, making it the perfect tool for on-the-go technicians.

All models in the IDEAL INDUSTRIES HE series are engineered with safety in mind, adhering to stringent international testing standards. They provide superior insulation resistance and a high degree of accuracy, mitigating the risks associated with electrical work. Furthermore, their IP-rated enclosures ensure protection against dust and moisture, enhancing longevity.

In conclusion, the IDEAL INDUSTRIES HE24, HE18, HE15, and HE12 series represent a comprehensive range of electrical testing tools that cater to professionals' varied needs. With their combination of advanced features, user-friendly designs, and safety compliance, these models are excellent choices for any electrical technician aiming for accuracy and efficiency in their work.