4 Sidewall direct venting (continued)

Sidewall termination – optional concentric vent

Description and usage

Lochinvar offers optional concentric combustion air and vent pipe termination kits (Factory Kit #CVK3003 for 3" diameter

-Models 81 - 211 and #CVK3007 for 4" diameter - Model 286). Both combustion air and vent pipes must attach to the termination kit. The termination kits must terminate outside the structure and must be installed as shown below

in

FIG. 4-6.

The required combustion air and vent pipe materials are listed in Table 3A, on page 17 of this manual.

Figure 4-6Concentric Sidewall Termination

e.Do not terminate above any door or window. Condensate can freeze, causing ice formations.

f.Locate or guard vent to prevent condensate damage to exterior finishes.

4.Cut one (1) hole (5 inch diameter for #CVK3003 installations or 7 inch diameter for #CVK3007 installations) into the structure to install the termination kit.

5.Partially assemble the concentric vent termination kit. Clean and cement using the procedures found in these instructions.

a.Cement the Y concentric fitting to the larger kit pipe (FIG.’s 4-7 and 4-8).

b.Cement the rain cap to the smaller diameter kit pipe (FIG.’s 4-7 and 4-8).

Figure 4-7Kit Contents_CVK3003

RAIN CAP

4" DIA.

SDR-26 PIPE

2 1/2" DIA. SDR-26 PIPE

Sidewall termination installation

"Y" CONCENTRIC FITTING

1.Determine the best location for the termination kit (see FIG. 4-6).

2.The total length of piping for vent or air must not exceed the limits given in the General Venting section on page 19 of this manual.

3.You must consider the surroundings when terminating the vent and air:

a.Position the vent termination where vapors will not damage nearby shrubs, plants or air conditioning equipment or be objectionable.

b.The flue products will form a noticeable plume as they condense in cold air. Avoid areas where the plume could obstruct window views.

c.Prevailing winds could cause freezing of condensate and water/ice buildup where flue products impinge on building surfaces or plants.

d.Avoid possibility of accidental contact of flue products with people or pets.

Figure 4-8Kit Contents_CVK3007

RAIN CAP

6" (152 MM) TO 4" (102 MM) REDUCER

6" (152 MM) DIA.

6" (152 MM) DIA.

4" (102 MM) DIA.

"Y" CONCENTRIC FITTING

6" (152 MM) DIA.

"FLEXIBLE" PIPE COUPLING

25

Image 25
Contents Models 81 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight Boiler How it worksModels 81 Model Knight Boiler =B=R Rating RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Provide air openings to room Residential garage installationVent and air piping Flooring and foundationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Leveling the boilerDirect venting options Sidewall Vent General ventingDirect venting options Vertical Vent, Sidewall Air Direct venting options Vertical VentRequirements for installation in Canada Install vent and combustion air pipingInstalling vent and air piping PVC/CPVC vent piping materialsVent Pipe, and Fittings PVC/CPVC air intake/vent connectionsStainless steel vent Air inlet pipe materialsBoiler Boiler FlueBoiler Flue Intake Air Adapter Termination Length Optional room airRemoving from existing vent Sidewall direct venting If using the alternate sidewall terminationVent/air termination sidewall Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations Termination and fittingsSidewall termination optional concentric vent Sidewall termination installationDescription and usage 10 Concentric Multiventing sidewall terminations 12Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrations Multiple vent/air terminationsVertical termination optional concentric vent Vertical termination installationMultiventing vertical terminations 6Concentric Vent Roof InstallationConcentric Venting Arrangement Alternate vertical concentric venting10Existing Vent as a Chase Existing vent as a chaseHydronic piping Near boiler piping components Circulator sizing Near boiler piping connectionsIndirect water heaters StrainerPressure FeetModel Minimum Pipe Pump Size GrundfosVariable speed pump option Variable speed pump setupUP26-96 FC/VS IFC VS Stratos 1.25 3 x 4Single Boiler Single Temperature Zoned with Circulators Number of Units 6Single Boiler Multiple Temperatures Number of Units Model Required Pipe Sizes MAY Substitute Number of Units Model 10Multiple Boilers Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply Single Unit Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connectionsLouver proving switch Outdoor temperature sensorHigh gas pressure switch Low gas pressure switchAlarm contacts Flow switchWiring of the cascade ModBusManual Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaksInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Natural Gas Propane Set space heating operationConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationStandby, ready to start a new cycle Navigation Dial Knight boiler control moduleInstaller Access modesUser Call for Heat Information Dial Function Service technician Maintenance Maintenance and annual startupOwner maintenance See the Knight User’s Information Manual for InstructionsFlue vent system and air piping MaintenanceCheck water system Check expansion tankClean condensate trap Address reported problemsInspect boiler area Inspect boiler interiorCheck all boiler wiring Check ignition ground wiringCheck control settings Check flame signalReview with owner Cleaning boiler heat exchangerOiled bearing circulators Kit Part Component Number DescriptionPC Interface Diagrams2Wiring Diagram
Related manuals
Manual 16 pages 57.5 Kb

81 - 286 specifications

Lochinvar 81 - 286 is a state-of-the-art boiler recognized for its efficiency and reliability in both residential and commercial applications. This high-performance heating solution is designed to meet the diverse needs of users while adhering to modern environmental standards.

One of the standout features of the Lochinvar 81 - 286 is its advanced condensing technology. This allows the unit to harness more heat from the combustion gases, significantly boosting its thermal efficiency. With an impressive efficiency rating of over 95%, users can expect lower energy bills and reduced carbon emissions, making this boiler an environmentally friendly choice.

The Lochinvar 81 - 286 incorporates a robust stainless steel heat exchanger that guarantees durability and longevity. This corrosion-resistant material not only prolongs the unit's life but also ensures consistent performance over time. Additionally, the heat exchanger’s design facilitates optimal heat transfer, further enhancing the boiler's efficiency.

In terms of control, the Lochinvar 81 - 286 features a user-friendly control interface that simplifies operation. The boiler is equipped with advanced modulation capabilities, allowing it to adjust its output based on real-time heating demands. This responsiveness reduces energy waste and optimizes comfort levels within the space it serves.

The boiler also supports a variety of installation configurations, providing flexibility for different building layouts. Its compact design allows for easy installation in restricted spaces, while versatile venting options facilitate integration into various systems.

Safety is a paramount consideration in the design of the Lochinvar 81 - 286. The unit comes with integrated safety features such as a built-in diagnostic system that alerts users to any potential issues before they escalate. This proactive technology helps in maintaining seamless operation and reducing downtime.

Finally, the Lochinvar 81 - 286 is compliant with the latest regulations and industry standards, ensuring that it meets the expectations of both consumers and environmental agencies. With its impressive combination of efficiency, durability, and advanced technology, the Lochinvar 81 - 286 stands out as a top choice for anyone seeking a high-performance heating solution. This boiler not only addresses the immediate needs of heating but also supports long-term sustainability initiatives, proving to be a wise investment for the future.