10 Start-up

Installation & Operation Manual

Check for gas leaks

￿WARNING

Propane boilers only – Your propane supplier mixes an odorant with the propane

￿WARNING

￿WARNING

Before starting the boiler, and during initial operation, smell near the floor and around the boiler for gas odorant or any unusual odor. Remove the top access panel and smell the interior of the boiler enclosure. Do not proceed with startup if there is any indication of a gas leak. Use an approved leak detection solution. Repair any leaks at once.

DO NOT adjust or attempt to measure gas valve outlet pressure. The gas valve is factory set for the correct outlet pressure. This setting is suitable for natural gas and propane, requiring no field adjustment. Attempting to alter or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death, or substantial property damage.

to make its presence detectable. In some instances, the odorant can fade, and the gas may no longer have an odor. Before startup (and periodically thereafter), have the propane supplier verify the correct odorant level in the gas.

Check thermostat circuit(s)

1.

Disconnect the two external wires connected to each of

 

the room thermostat terminals on the connection board.

2.

Connect a voltmeter across these two incoming wires.

 

Close each thermostat, zone valve, and relay in the

 

external circuit one at a time and check the voltmeter

 

reading across the incoming wires.

3.

There should NEVER be a voltage reading.

4.

If a voltage does occur under any condition, check and

 

correct the external wiring. (This is a common problem

 

when using 3-wire zone valves.)

Figure 10-1Condensate Trap

RETAINING

SCREW

2” PVC CAP WITH

BLOCKED DRAIN SWITCH

PVC TEE ASSEMBLY (FACTORY SUPPLIED)

CONDENSATE FROM

HEAT EXCHANGER TO FLOOR

DRAIN

5. Once the external thermostat circuit wiring is checked and

corrected if necessary, reconnect the external thermostat

circuit wires to the connection board.

Inspect/fill condensate system

Inspect/check condensate lines and fittings

1.Inspect the condensate drain line, condensate PVC fittings and condensate trap.

Fill condensate trap with water

1.Remove the PVC cap retaining screw from the PVC cap (FIG. 10-1).

2.Remove the 2 inch PVC cap with the switch located at the top of the trap (FIG. 10-1).

3.Fill with fresh water until the water begins to pour out of the drain.

4.Replace the cap. Press the cap onto the trap until the cap makes contact with the drain.

5.Replace the retaining screw.

￿WARNING The condensate trap (FIG. 10-1) must be filled with water during all times of boiler

operation to avoid flue gas emission from the condensate drain line. Failure to fill the trap could result in severe personal injury or death.

56

Image 56
Contents Models 81 Contents When servicing boiler Please read before proceedingKnight Boiler How it works Stainless steel heat exchangerModels 81 Model Ratings Knight Boiler =B=R RatingInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Residential garage installation Provide air openings to roomVent and air piping Flooring and foundationAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Leveling the boilerGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Direct venting options Vertical Vent, Sidewall AirInstall vent and combustion air piping Requirements for installation in CanadaInstalling vent and air piping PVC/CPVC vent piping materialsPVC/CPVC air intake/vent connections Vent Pipe, and FittingsAir inlet pipe materials Stainless steel ventBoiler Flue Intake Air Adapter Termination Boiler FlueBoiler Removing from existing vent Optional room airLength If using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrationsTermination and fittings Multiple vent/air terminationsDescription and usage Sidewall termination installationSidewall termination optional concentric vent 10 Concentric 12Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations Multiple vent/air terminations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric vent6Concentric Vent Roof Installation Multiventing vertical terminationsAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase 10Existing Vent as a ChaseHydronic piping Near boiler piping components Near boiler piping connections Circulator sizingIndirect water heaters StrainerFeet PressureModel Minimum Pipe Pump Size GrundfosUP26-96 FC/VS IFC VS Stratos 1.25 3 x Variable speed pump setupVariable speed pump option 4Single Boiler Single Temperature Zoned with Circulators Number of Units 6Single Boiler Multiple Temperatures Number of Units Model Required Pipe Sizes MAY Substitute Number of Units Model 10Multiple Boilers Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasLength of Pipe in Straight Feet for 1/2 PSI Single Unit Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor Louver proving switchHigh gas pressure switch Low gas pressure switchFlow switch Alarm contactsWiring of the cascade ModBusManual Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayStandby, ready to start a new cycle Knight boiler control module Navigation DialUser Access modesInstaller Call for Heat Information Dial Function Maintenance Maintenance and annual startup Service technicianOwner maintenance See the Knight User’s Information Manual for InstructionsMaintenance Flue vent system and air pipingCheck water system Check expansion tankAddress reported problems Clean condensate trapInspect boiler area Inspect boiler interiorCheck ignition ground wiring Check all boiler wiringCheck control settings Check flame signalCleaning boiler heat exchanger Review with ownerOiled bearing circulators Kit Part Component Number DescriptionDiagrams PC Interface2Wiring Diagram
Related manuals
Manual 16 pages 57.5 Kb

81 - 286 specifications

Lochinvar 81 - 286 is a state-of-the-art boiler recognized for its efficiency and reliability in both residential and commercial applications. This high-performance heating solution is designed to meet the diverse needs of users while adhering to modern environmental standards.

One of the standout features of the Lochinvar 81 - 286 is its advanced condensing technology. This allows the unit to harness more heat from the combustion gases, significantly boosting its thermal efficiency. With an impressive efficiency rating of over 95%, users can expect lower energy bills and reduced carbon emissions, making this boiler an environmentally friendly choice.

The Lochinvar 81 - 286 incorporates a robust stainless steel heat exchanger that guarantees durability and longevity. This corrosion-resistant material not only prolongs the unit's life but also ensures consistent performance over time. Additionally, the heat exchanger’s design facilitates optimal heat transfer, further enhancing the boiler's efficiency.

In terms of control, the Lochinvar 81 - 286 features a user-friendly control interface that simplifies operation. The boiler is equipped with advanced modulation capabilities, allowing it to adjust its output based on real-time heating demands. This responsiveness reduces energy waste and optimizes comfort levels within the space it serves.

The boiler also supports a variety of installation configurations, providing flexibility for different building layouts. Its compact design allows for easy installation in restricted spaces, while versatile venting options facilitate integration into various systems.

Safety is a paramount consideration in the design of the Lochinvar 81 - 286. The unit comes with integrated safety features such as a built-in diagnostic system that alerts users to any potential issues before they escalate. This proactive technology helps in maintaining seamless operation and reducing downtime.

Finally, the Lochinvar 81 - 286 is compliant with the latest regulations and industry standards, ensuring that it meets the expectations of both consumers and environmental agencies. With its impressive combination of efficiency, durability, and advanced technology, the Lochinvar 81 - 286 stands out as a top choice for anyone seeking a high-performance heating solution. This boiler not only addresses the immediate needs of heating but also supports long-term sustainability initiatives, proving to be a wise investment for the future.