Lochinvar 81 - 286 operation manual Call for Heat

Page 69

Installation & Operation Manual

11 Operating information (continued)

Figure 11-2Status Display Screen

A

(BOILER

STATUS)

C

(OPERATIONAL

INFORMATION)

D

(LEFT SELECT

KEY)

E

B

(CALL FOR

HEAT)

F

(RIGHT SELECT KEY)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(NAVIGATION DIAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Status Display Screens

Section

 

 

Display

 

 

 

Description

 

STANDBY

 

 

 

The unit has not received a call for heat from a remote thermostat nor

 

 

 

 

has it received a call for heat from a DHW thermostat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

START

 

 

 

The unit has begun a burn cycle and is checking all safety circuits.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PREPURGE

 

 

 

The unit has initiated a 10 second purge period on a call for heat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IGNITION

 

 

 

The unit has begun a 4 second spark period to ignite the main burner.

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

%

 

 

 

 

 

 

 

 

The unit has fired and is running at the displayed percentage.

(Boiler Status

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The call for heat has been satisfied and the unit runs the fan for an

Bar)

POSTPURGE

 

 

 

additional 10 seconds to clear the combustion chamber and vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

system of residual flue products.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHUTDOWN

 

 

 

The unit has been placed in the OFF position.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The controlled temperature has exceeded its set point and its offset.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOCKED

 

 

 

The unit has detected a condition that has temporarily interrupted

 

 

 

 

the current call for heat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Room Thermostat 1 has a call for heat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Room Thermostat 2 has a call for heat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Room Thermostat 3 has a call for heat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Call for Heat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The tank thermostat or sensor has a call for heat.

Indicators)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Indicates which room thermostat demand shows priority.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The unit is being controlled by a 0 - 10V BMS signal.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The member unit is supplying heat while in Cascade Mode.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

69

Image 69
Contents Models 81 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight Boiler How it worksModels 81 Model Knight Boiler =B=R Rating RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Provide air openings to room Residential garage installationVent and air piping Flooring and foundationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Leveling the boilerDirect venting options Sidewall Vent General ventingDirect venting options Vertical Vent, Sidewall Air Direct venting options Vertical VentRequirements for installation in Canada Install vent and combustion air pipingInstalling vent and air piping PVC/CPVC vent piping materialsVent Pipe, and Fittings PVC/CPVC air intake/vent connectionsStainless steel vent Air inlet pipe materialsBoiler Flue BoilerBoiler Flue Intake Air Adapter Termination Optional room air LengthRemoving from existing vent Sidewall direct venting If using the alternate sidewall terminationVent/air termination sidewall Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations Termination and fittingsSidewall termination installation Sidewall termination optional concentric ventDescription and usage 10 Concentric Multiventing sidewall terminations 12Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrations Multiple vent/air terminationsVertical termination optional concentric vent Vertical termination installationMultiventing vertical terminations 6Concentric Vent Roof InstallationConcentric Venting Arrangement Alternate vertical concentric venting10Existing Vent as a Chase Existing vent as a chaseHydronic piping Near boiler piping components Circulator sizing Near boiler piping connectionsIndirect water heaters StrainerPressure FeetModel Minimum Pipe Pump Size GrundfosVariable speed pump setup Variable speed pump optionUP26-96 FC/VS IFC VS Stratos 1.25 3 x 4Single Boiler Single Temperature Zoned with Circulators Number of Units 6Single Boiler Multiple Temperatures Number of Units Model Required Pipe Sizes MAY Substitute Number of Units Model 10Multiple Boilers Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasSingle Unit Natural Gas Pipe Capacity Chart Check inlet gas supplyLength of Pipe in Straight Feet for 1/2 PSI Gas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connectionsLouver proving switch Outdoor temperature sensorHigh gas pressure switch Low gas pressure switchAlarm contacts Flow switchWiring of the cascade ModBusManual Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaksInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Natural Gas Propane Set space heating operationVerify DHW mode Configuration of the cascadeSet domestic hot water DHW operation General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationStandby, ready to start a new cycle Navigation Dial Knight boiler control moduleAccess modes InstallerUser Call for Heat Information Dial Function Service technician Maintenance Maintenance and annual startupOwner maintenance See the Knight User’s Information Manual for InstructionsFlue vent system and air piping MaintenanceCheck water system Check expansion tankClean condensate trap Address reported problemsInspect boiler area Inspect boiler interiorCheck all boiler wiring Check ignition ground wiringCheck control settings Check flame signalReview with owner Cleaning boiler heat exchangerOiled bearing circulators Kit Part Component Number DescriptionPC Interface Diagrams2Wiring Diagram
Related manuals
Manual 16 pages 57.5 Kb

81 - 286 specifications

Lochinvar 81 - 286 is a state-of-the-art boiler recognized for its efficiency and reliability in both residential and commercial applications. This high-performance heating solution is designed to meet the diverse needs of users while adhering to modern environmental standards.

One of the standout features of the Lochinvar 81 - 286 is its advanced condensing technology. This allows the unit to harness more heat from the combustion gases, significantly boosting its thermal efficiency. With an impressive efficiency rating of over 95%, users can expect lower energy bills and reduced carbon emissions, making this boiler an environmentally friendly choice.

The Lochinvar 81 - 286 incorporates a robust stainless steel heat exchanger that guarantees durability and longevity. This corrosion-resistant material not only prolongs the unit's life but also ensures consistent performance over time. Additionally, the heat exchanger’s design facilitates optimal heat transfer, further enhancing the boiler's efficiency.

In terms of control, the Lochinvar 81 - 286 features a user-friendly control interface that simplifies operation. The boiler is equipped with advanced modulation capabilities, allowing it to adjust its output based on real-time heating demands. This responsiveness reduces energy waste and optimizes comfort levels within the space it serves.

The boiler also supports a variety of installation configurations, providing flexibility for different building layouts. Its compact design allows for easy installation in restricted spaces, while versatile venting options facilitate integration into various systems.

Safety is a paramount consideration in the design of the Lochinvar 81 - 286. The unit comes with integrated safety features such as a built-in diagnostic system that alerts users to any potential issues before they escalate. This proactive technology helps in maintaining seamless operation and reducing downtime.

Finally, the Lochinvar 81 - 286 is compliant with the latest regulations and industry standards, ensuring that it meets the expectations of both consumers and environmental agencies. With its impressive combination of efficiency, durability, and advanced technology, the Lochinvar 81 - 286 stands out as a top choice for anyone seeking a high-performance heating solution. This boiler not only addresses the immediate needs of heating but also supports long-term sustainability initiatives, proving to be a wise investment for the future.