TABLE 3c: RIELLO BURNER CONFIGURATION AND SETUP DATA

 

KSZ065

KSZ075

KSZ100

KSZ090

KSZ125

KSZ150

KSZ120

KSZ175

KSZ200

 

 

 

 

 

 

 

 

 

 

BURNER MODEL

 

40F5

40F5

 

40F5

40F10

 

40F10

40F10

STANDARD

 

DEL

DEL

 

DEL.

DEL

 

HAGO

DEL

NOZZLE

 

0.60/60A

0.85/60W

 

1.00/60A

1.25/60B

 

1.35/45B

1.65/45B

PUMP PRESS (psi)

 

150

150

 

150

150

 

150

150

TURBULATOR

 

0

2

 

4

1

 

1.5

2

AIR

 

 

 

 

 

 

 

 

 

SHUTTER SETTING

 

2.60

2.85

 

4

3

 

3

3.8

DRAFT OVER FIRE

 

-0.02

-0.02

 

-0.02

-0.02

 

-0.02

-0.02

(in w.c.)

 

 

 

 

 

 

 

 

 

 

 

 

MAX. SMOKE

 

#1

#1

 

#1

#1

 

#1

#1

(bacharach scale)

 

 

 

 

 

 

 

 

 

 

 

 

FLUE CO2 (%)

 

 

 

 

 

 

 

 

 

MIN.

 

11.0

11.0

 

11.0

11.0

 

11.0

11.0

MAX

 

12.5

12.5

 

12.5

12.5

 

12.5

12.5

XII Service and Maintenance

The following procedure should be performed on a weekly basis:

For boilers equipped with a #67 low water cut-off, blow down the low water cut-off following the instructions on the yellow sticker adjacent to the low water cut-off. During this blow down, the low water cutoff should shut down the burner. If it does not, the low water cut-off should be replaced immediately.

The following procedure should be performed on an annual basis:

1)Turn off electrical power and oil supply to the boiler.

2)Inspect the low water cut-off:

For Hydrolevel CG450 low water cut-offs - Remove and inspect the probe for scale and sediment buildup. Clean any sediment or scale from the probe with a scouring pad or steel wool. Consult the Hydrolevel CG450 manual for any additional maintenance information. Test the low water cut-off before placing the boiler back into service.

For McDonnell & Miller #67 low water cut-offs - Remove and inspect switch and float mechanism. Inspect float bowl for mud accumulation. Clean as required. Replace the switch and float mechanism every five years or 100,000 cycles. Consult the McDonnell and Miller #67 manual for any additional maintenance information. Test the low water cut-off before placing the boiler back into service.

2726

Image 27
Contents Crown Product Description Table of ContentsGeneral Specifications III Before InstallingAir for Combustion and Ventilation IV Locating the BoilerSide View For Buildings of Other than Unusually Tight Construction Boiler Installed in Confined Space ALL AIR from Inside ALL AIR from OUTDOORS, Using Openings Into Boiler Room Page 109 VI Venting1110 Minimum Recommended Breeching Chimney Size1211 VII System Piping1312 Piping InstallationViii Indirect & Tankless Water Heater Piping Tanklessheaterpiping Tanklessheaterpiping 16151716 IX Fuel Line PipingTWO-PIPE Gravity Feed System 18171918 2019 Wiring2120 Indirect Water Heater Field WiringFeeder 2322 WIRINGMCDONNELL&MILLER#67LWCO2423 XI Start-up and Checkout2425 2526 2726 XII Service and Maintenance2827 2928 Tankless Heater Maintenance3029 Avoid Breathing Fiber Particulates and Dust3130 Installation Notes And Service LogKEY # Description QTY. or 3231Page KEY # Description 3433Page Rev 9