XI Start-up and Checkout

WARNING

NEVER ATTEMPT TO FILL A HOT EMPTY BOILER.

MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE, AND OTHER FLAMMABLE VAPORS AND LIQUIDS.

SAFE RELIABLE OPERATION OF THIS BOILER REQUIRES THAT THE BURNER BE CHECKED AND ADJUSTED BY A QUALIFIED OIL SERVICEMAN USING COMBUSTION TEST INSTRUMENTS.

FAILURE TO PERFORM ALL OF THE CHECKS OUTLINED IN THE FOLLOWING PROCEDURE COULD RESULT IN UNRELIABLE OPERATION, DAMAGE TO THE BOILER NOT COVERED UNDER WARRANTY, PROPERTY DAMAGE, OR UNSAFE OPERATION.

Use the following procedure for initial start-up of the boiler:

1)Ensure that the boiler is filled to the normal water level.

2)Verify that the vent system is complete and free of obstructions prior to start-up of the boiler.

3)Inspect all wiring for loose or uninsulated connections, proper size fuses installed, etc.

4)Verify that oil tank is filled with #2 fuel oil meeting ASTM D396 specifications, oil piping has been tested and is air tight, and shut-off valve(s) are closed.

5)Check initial settings of oil burner air band and air shutter, head setting etc. and readjust if needed. See Table 3 for setup and combustion data pertaining to a particular boiler/ burner combination.

6)Attach plastic hose to oil pump vent fitting and provide a container to catch oil during oil pump bleeding procedure.

7)Install 0-200 PSI pressure gauge into oil pump gauge port.

8)Open all oil line shut-off valves.

9)Open flame observation port cover on burner swing door to see flame.

10)Adjust system thermostat to highest setting.

11)Set pressure limit control to suit individual requirements of the installation. For most steam systems, the cut-in pressure should be set at 0.5 psi with a 1 psi differential.

12)Turn the line service switch to “ON” position.

13)Crack open vent fitting on the oil pump and allow burner to run until a solid oil stream, free of air bubbles, flows for 15 seconds into container. As the vent fitting is closed, the burner should fire and flame should be visible through observation port immediately (or after prepurge timing has expired, if a burner is so equipped). Refer to burner instructions for more details.

14)Immediately upon firing the boiler, check the smoke level. If the smoke level is in excess of a #1, open the air adjustment to bring the smoke level below a #1.

15)Make sure that the oil pressure matches that shown in Table 3 for the burner supplied. Adjust pressure if required.

16)Check the vacuum at the inlet of the fuel pump. Make sure that the vacuum does not exceed the fuel pump manufacturer’s limit (consult the pump manufacturer’s instructions).

17)Close the flame observation cover.

18)After chimney has warmed-up to operating temperature, adjust barometric draft regulator for a draft of -0.02 inch w. c. over the fire.

19)Check the CO2 and confirm that it is between the minimum and maximum limits shown in Table 3. Adjust if necessary.

20)Verify that the smoke level still does not exceed #1 and that the draft over fire is -0.02 inch w.c.

21)Turn off the burner and remove pressure gauge. Install and tighten gauge port plug, than restart the burner.

22)Check for clean cutoff of the burner. Air in the oil line between fuel pump and nozzle will compress, while burner is

running, and expand, when burner shuts off, causing oil line pressure to drop and nozzle drip after burner stops. Cycle burner on and off 5 to 10 times to purge air completely.

23)Check thermostat operation by raising or lowering its set point as required, cycling burner on and off.

2423

Image 24
Contents Crown Table of Contents Product DescriptionIII Before Installing General SpecificationsIV Locating the Boiler Air for Combustion and VentilationSide View For Buildings of Other than Unusually Tight Construction Boiler Installed in Confined Space ALL AIR from Inside ALL AIR from OUTDOORS, Using Openings Into Boiler Room Page VI Venting 109Minimum Recommended Breeching Chimney Size 1110VII System Piping 1211Piping Installation 1312Viii Indirect & Tankless Water Heater Piping Tanklessheaterpiping 1615 TanklessheaterpipingIX Fuel Line Piping 17161817 TWO-PIPE Gravity Feed System1918 Wiring 2019Indirect Water Heater Field Wiring 2120Feeder WIRINGMCDONNELL&MILLER#67LWCO 2322XI Start-up and Checkout 24232425 2526 XII Service and Maintenance 27262827 Tankless Heater Maintenance 2928Avoid Breathing Fiber Particulates and Dust 3029Installation Notes And Service Log 31303231 KEY # Description QTY. orPage 3433 KEY # DescriptionPage Rev 9