Burnham 81433101R16-1/10 manual Vent Pipe Part Numbers, Intake Terminal Location

Page 13

CAUTION

Operation of boiler with improperly adjusted burner may result in soot damage to side of house.

6.Intake Terminal Location (Direct Vent only) - Locate Air Intake Terminal not less than 12 inches to the left, right, or bottom of the vent terminal. Do not locate air intake terminal above vent terminal. Intake terminal must be at least 12 inches above grade plus snow accumulation; at least 1 foot from a roof soffit; at least 3 feet from an inside corner of an

L-shaped structure. See Figure 9.

7.The LEDV must be vented with 4" Z-Flex Direct Oil™ Vent. 20 feet is the maximum vent length allowed. The vent pipe is available in 5, 10, 15, and 20 foot lengths. Table 1 lists vent part numbers.

Table 1: Vent Pipe Part Numbers

4" Direct Oil™ Vent Pipe

Pipe Length

Part No.

5 Ft.

8113302

10 Ft.

8113303

15 Ft.

8113304

20 Ft.

8113305

8.The vent system must be completed with the Direct Oil™ Vent Kit, which is shipped with the boiler.

Components of this kit are listed in the Repair Parts Section of this manual.

DANGER

Vent pipe may not be spliced. Do not drill through vent pipe. Do not operate boiler if vent pipe has been crushed. Vent pipe must be completely sealed. Do not operate boiler if vent pipe insulation sleeve is damaged, frayed or missing.

B.Vent Installation (Direct Vent and Side-Wall Vent)

1.Install Vent Terminal. See Figure 10.

a.After determining the location from previous Section, cut an opening in the wall for the vent terminal.

Combustible wall: 8 inches diameter hole is required to maintain a 1 inch clearance to combustible materials.

Non-combustible wall: 6½ inches diameter hole is required.

b.Secure 10" square trim plate to outside wall.

c.Insert the vent terminal through the opening until the stop bead rest against the trim plate.

d.Slide the 10" square inside trim plate assembly (fitted with gear clamp) onto the terminal pipe.

Figure 9: Intake Terminal Location

13

Image 13
Contents 81433101R16-1/10 Price $3.00 Ledv SeriesImportant Information Read Carefully Page Table of Contents Water Content 6.1 gallons Pre-Installation Do not drop boiler. Do not bump boiler jacket II. Unpack BoilerAgainst floor Minimum Clearances to Combustible Materials III. Water Piping and Trim Page Page General Guidelines IV. Venting / Air Intake PipingIntake Terminal Location Vent Pipe Part NumbersVent Installation Vent Connector, Assembled Air Intake Installation Direct Vent only See Figure Page Electrical Electrical and Sequence of OperationsSequence of Operations Beckett Burner Schematic Wiring Diagram Page General VI. Oil PipingSingle-pipe Oil Lines Two-Pipe Oil Lines Two-Pipe InstallationAdjusting Settings Always Inspect Installation Before Starting BurnerVII. System Start-up Ii. DisplayLED Error Codes Control Operating CharacteristicsBurner START-UP Install Pressure Gauge Riello BF Burner SettingsCheck / Adjust OIL Pressure Remove Test Plug in Flue CollarHints on Combustion Test Controls Simulate power failureSimulate flame failure Simulate ignition failurePage Firetubes and Combustion Chamber Section Viii Service and CleaningBurner Low water cutoff if so equipped Avoid Breathing Fiber Particulates and Dust Ledv Boiler Trim & Controls IX. Repair PartsLedv Boiler Jacket & Insulation Ledv Bare Boiler Assembly PartsRepair KitVent Beckett Afii Oil Burner Repair Part Beckett Afii Burner Replacement Parts Service Record Low Water Cut Off Lwco on Hot Water Boilers Wiring of Typical LwcoLwco Location Limited Warranty