Burnham 81433101R16-1/10 manual Riello BF Burner Settings, Remove Test Plug in Flue Collar

Page 25

Table 6A: Riello BF Burner Settings

Boiler

Firing Rate

Burner

Delavan Oil

 

Settings

 

 

Pump Pressure

 

 

Model

(GPH)

Model

Nozzle

Air Gate

 

Turbulator

(PSIG)

 

 

 

 

 

 

 

 

LEDV1

0.60

BF3

0.50 - 60° A

4.0

145

 

0

LEDV2

1.00

BF5

0.85 - 60° A

5.0

145

 

1.0

LEDV3

1.25

BF5

1.00 - 60° A

6.5

145

 

3.0

Figure 20A: Electrode Tip Gap & Spacing

c.Upon reinstallation of the nozzle line assembly, check that head/air plate setting number pointer lines up with a number on the scale, which matches a value shown in Table 6 for a particular boiler/burner model.

2.Open all shut-off valves in the oil supply line to the burner.

3.Attach a plastic hose to fuel pump vent fitting and provide a container to catch the oil.

4.REMOVE GAUGE PORT PLUG from fuel pump and install pressure gauge.

5.REMOVE TEST PLUG IN FLUE COLLAR.

6.Close the service switch to start the burner. If the burner does not start immediately, check the manual overload switch on the motor, if so equipped, and the safety switch of the burner primary control.

WARNING

Very hot flue gases come out of sight hole when boiler is operated without sight plug installed. Always wear proper eye protection.

7.Bleed the fuel unit when the burner motor starts rotating. To bleed, loosen the vent fitting (with plastic hose attached) and catch the oil in an empty container. Continue to bleed for 15 seconds after oil is free of air bubbles. Tighten the vent fitting when all the air is purged. NOTE: Bleeding might not be necessary with a two pipe system. When vent fitting is closed, burner flame should start immediately.

8.INSTALL PRESSURE GAUGE

a.Either, remove plastic hose and oil pump vent fitting, then, install a reliable pressure gauge into vent fitting port, or install the gauge into the nozzle port. See Figure 20B.

Figure 20B: Checking / Adjusting Fuel

Pump Pressure

9.CHECK / ADJUST OIL PRESSURE

a.Check oil pressure to correspond to a specified value for a particular LEDV boiler model. Refer to Table 6.

25

Image 25
Contents 81433101R16-1/10 Price $3.00 Ledv SeriesImportant Information Read Carefully Page Table of Contents Water Content 6.1 gallons Pre-Installation Do not drop boiler. Do not bump boiler jacket II. Unpack BoilerAgainst floor Minimum Clearances to Combustible Materials III. Water Piping and Trim Page Page General Guidelines IV. Venting / Air Intake PipingIntake Terminal Location Vent Pipe Part NumbersVent Installation Vent Connector, Assembled Air Intake Installation Direct Vent only See Figure Page Electrical Electrical and Sequence of OperationsSequence of Operations Beckett Burner Schematic Wiring Diagram Page General VI. Oil PipingSingle-pipe Oil Lines Two-Pipe Oil Lines Two-Pipe InstallationAdjusting Settings Always Inspect Installation Before Starting BurnerVII. System Start-up Ii. DisplayLED Error Codes Control Operating CharacteristicsBurner START-UP Install Pressure Gauge Riello BF Burner SettingsCheck / Adjust OIL Pressure Remove Test Plug in Flue CollarHints on Combustion Test Controls Simulate power failureSimulate flame failure Simulate ignition failurePage Firetubes and Combustion Chamber Section Viii Service and CleaningBurner Low water cutoff if so equipped Avoid Breathing Fiber Particulates and Dust Ledv Boiler Trim & Controls IX. Repair PartsLedv Boiler Jacket & Insulation Ledv Bare Boiler Assembly PartsRepair KitVent Beckett Afii Oil Burner Repair Part Beckett Afii Burner Replacement Parts Service Record Low Water Cut Off Lwco on Hot Water Boilers Wiring of Typical LwcoLwco Location Limited Warranty