Burnham 81433101R16-1/10 manual Air Intake Installation Direct Vent only See Figure

Page 16

e.Secure the inside trim plate to inside wall.

f.Tighten the gear clamp to the terminal pipe.

g.Seal all external joints with a weatherproof caulk.

2.Cut vent pipe to length with a hack saw.

3.Install Vent Connector/Appliance Adaptor. See Figures 11 and 12.

a.Apply a continuous bead of high temperature adhesive/sealant (supplied with boiler) around outside of corrugated pipe of vent connector.

b.Twist vent connector into end of vent pipe. Turn the connector counter-clockwise until it is engaged approximately 4 inches into the inner vent pipe and the outer collar of the connector overlaps the outside of the vent pipe.

c.Tighten the gear clamp on the outer collar of the connector.

d.Repeat steps a. through c. with the appliance adapter.

4.Connect vent pipe to boiler.

a.Apply a continuous bead of high temperature adhesive/sealant (supplied with boiler) to inside of appliance adapter (approximately ½ inch from end).

b.Slip appliance adapter over boiler flue collar and tighten gear clamp.

5.Connect vent pipe to terminal.

a.Carefully slide insulation sleeve over vent connector and vent pipe until gear clamp on small end of connector can be accessed.

WARNING

Do not operate LEDV with barometric damper in vent. Do not connect venting to chimney.

b.Apply a continuous bead of high temperature adhesive/sealant (supplied with boiler) on inside of cent connector (approximately ½ inch from end).

c.Clip connector over vent terminal until it is fully engaged. Then tighten gear clamp.

d.Slide insulation sleeve over terminal connection so that connector is completely covered.

e.Secure each end of insulation sleeve with the gear clamps provided.

6.Secure vent pipe in position with pipe straps.

a.All horizontal runs must rise at least ¼ inch per foot toward vent terminal.

b.Avoid any sags or dips in vent pipe.

C.Air Intake Installation (Direct Vent only) See Figure 13.

WARNING

Do not reduce size of air intake pipe.

Read, understand and follow combustion air instruction restrictions contained in the Pre- Installation Section of this manual.

1.General

a.Use 4 inch diameter single wall metal pipe and fittings available at most heating distributors.

Maximum allowable air intake length is 40 equivalent feet. Each elbow is equal to 6 equivalent feet.

b.Start at Burner. Work toward air intake terminal.

c.Maintain minimum of ¼ inch per foot slope in horizontal run to air intake terminal. Slope down toward air intake terminal.

d.Seal all joints gas-tight, using silicone caulk or self-adhesive aluminum tape.

2.After determining location, cut a hole in the wall to accept 4 inch air intake pipe.

3.Remove the black plastic inlet cover from the right side of the Beckett AFII burner.

4.Mount the vacuum relief valve tee assembly or 90° elbow into the burner inlet ring. See Figure 13.

a.Secure with at least three (3) sheet metal screws evenly spaced around the burner inlet ring.

b.Assemble the vacuum relief valve balance weight onto the gate. Refer to the vacuum relief valve manufacturer's instructions.

c.Mount the vacuum relief valve into the tee and fasten with a screw and nut in collar tabs. To ensure proper operation, the gate must be level across the pivot point and plumb. Refer to vacuum relief valve manufacturer's instructions.

5.Install remainder of air intake, securing each joint with at least three (3) sheet metal screws evenly spaced.

WARNING

Do not locate air intake termination where natural convention or wind conditions may cause the boiler exhaust gases to be drawn into the air intake.

16

Image 16
Contents Ledv Series 81433101R16-1/10 Price $3.00Important Information Read Carefully Page Table of Contents Water Content 6.1 gallons Pre-Installation Do not drop boiler. Do not bump boiler jacket II. Unpack BoilerAgainst floor Minimum Clearances to Combustible Materials III. Water Piping and Trim Page Page IV. Venting / Air Intake Piping General GuidelinesVent Pipe Part Numbers Intake Terminal LocationVent Installation Vent Connector, Assembled Air Intake Installation Direct Vent only See Figure Page Electrical Electrical and Sequence of OperationsSequence of Operations Beckett Burner Schematic Wiring Diagram Page General VI. Oil PipingSingle-pipe Oil Lines Two-Pipe Installation Two-Pipe Oil LinesAlways Inspect Installation Before Starting Burner Adjusting SettingsVII. System Start-up Ii. DisplayLED Error Codes Control Operating CharacteristicsBurner START-UP Riello BF Burner Settings Install Pressure GaugeCheck / Adjust OIL Pressure Remove Test Plug in Flue CollarHints on Combustion Simulate power failure Test ControlsSimulate flame failure Simulate ignition failurePage Firetubes and Combustion Chamber Section Viii Service and CleaningBurner Low water cutoff if so equipped Avoid Breathing Fiber Particulates and Dust IX. Repair Parts Ledv Boiler Trim & ControlsLedv Boiler Jacket & Insulation Ledv Bare Boiler Assembly PartsRepair KitVent Beckett Afii Oil Burner Repair Part Beckett Afii Burner Replacement Parts Service Record Low Water Cut Off Lwco on Hot Water Boilers Wiring of Typical LwcoLwco Location Limited Warranty

81433101R16-1/10 specifications

The Burnham 81433101R16-1/10 is a highly regarded component within the realm of heating, ventilation, and air conditioning (HVAC) systems, known for its reliability and performance. This specific part is designed to enhance the efficiency of heating systems, making it an essential component for both residential and commercial applications.

One of the standout features of the Burnham 81433101R16-1/10 is its durable construction. Made with high-quality materials, this product is built to withstand the rigors of continuous operation in various environmental conditions. Its robust design ensures a longer lifespan, reducing the need for frequent replacements and maintenance, which ultimately saves on operational costs.

The Burnham 81433101R16-1/10 incorporates advanced technology to optimize energy usage. This part is engineered for high efficiency, meaning that it works to convert a maximum amount of energy into heat with minimal waste. The integration of cutting-edge technology ensures that users experience significant energy savings, which not only helps in reducing utility bills but also contributes positively to environmental sustainability.

In terms of compatibility, the Burnham 81433101R16-1/10 is designed to work seamlessly with various heating systems. This makes it a versatile choice for technicians and homeowners alike, as it can be easily integrated without extensive modifications. The ease of installation is another appealing characteristic, allowing for quicker setups that minimize downtime.

Furthermore, this component prioritizes safety, featuring built-in mechanisms that help prevent overheating and other potential hazards. This focus on safety reassures users that their heating systems can operate efficiently without compromising the well-being of their households or properties.

The Burnham 81433101R16-1/10 is also known for its user-friendly design. Technicians find that maintenance and inspection processes are straightforward, allowing for easy access to components for troubleshooting or routine checks. This practical feature enhances user satisfaction and simplifies operational management.

Overall, the Burnham 81433101R16-1/10 exemplifies a commitment to quality, efficiency, and safety in HVAC applications. Its combination of durability, advanced technology, and versatile compatibility makes it a valuable choice for anyone looking to enhance their heating system's performance. By opting for the Burnham 81433101R16-1/10, users can enjoy efficient heating solutions that meet their needs for comfort and energy conservation.