Ariston E-COMBI 24 30 38 manual Mbar

Page 16

installation

Instructions for opening the casing and performing an internal inspection

Before performing any work on the boiler, first disconnect it from the electrical power supply using the external bipolar switch; removing the fuse and shutting off the gas cock.

To access the inside of the boiler, the following is necessary:

1.Remove the casing by unhooking it from the control panel (a)

2.Loosen the two screws on the front casing (b), pull it forwards and unhook it from the upper pins (c)

3.Lower the control panel (d)

4.Unhook the two clips on the combustion chamber panel and lift off (e).

(a)

(b)

(c)

(d)

(e)

To calculate the size of the heating installation, refer to the "Available pressure" graph below.

Graph representing the available circulation pump pressure ΔT20oC

mbar

 

 

 

 

 

 

 

 

 

 

 

 

500

 

 

 

 

 

 

 

 

 

 

 

 

450

 

 

 

 

 

 

 

 

 

 

 

 

400

 

 

 

 

 

 

 

 

 

 

 

 

350

 

 

 

 

 

 

 

 

30-38 kW

 

 

 

 

 

 

 

 

 

 

 

 

 

300

 

 

 

 

 

 

 

 

 

 

 

 

250

 

 

 

 

24 kW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

200

 

 

 

 

 

 

 

 

 

 

 

 

150

 

 

 

 

 

 

 

 

 

 

 

 

100

 

 

 

 

 

 

 

 

 

 

 

 

50

 

 

 

 

 

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

 

 

 

 

 

 

 

 

 

 

 

 

l/h

Before the equipment is used, for the first time the trap must be filled with water. To do this, add approximately 1/4 litre of water via the flue outlet before fitting the flue system, or uns- crew the cap on the trap positioned underneath the boiler, fill it with water and refit it.

Warning!

Insufficient water in the trap can temporarily cause the flue gas to be expelled into the surrounding ambient air.

 

G

 

E

 

D

F

C

 

B

H

A

 

I

 

16

Image 16
Contents Combi 24/30/38 System24/30 Installation MaintenanceMaintenance guide OverviewOverview To the InstallerBenchmark Scheme Symbols used on the data plate Advice for the installerCE labelling Safety regulations Noisiness during operationPersonal injury caused by falling from a height Personal injury caused by knocks, stumbling etcProduct description Control panelFlue connector W. Flow switch Manual air vent Overall viewOverall Dimensions Minimum clearancesTechnical Data Model E-COMBIModel E-SYSTEM Installation Flushing and Water Treatment System ControlsLocation Boiler is equipped with a stainless steel heat exchangerCondensate Discharge Connecting the boiler to the system Installing the BoilerMethod of positioning the boiler on the wall Is connected to the 3 bar safety relief valve Safety Valve Discharge and Condense Outlet Gas connectionConnection for Filling Loop Mbar Water circuit diagram Manual air vent BurnerSecondary heat exchanger Pressure relief valve By-pass Condensate trap Circuit filterVertically from a terminal on the same wall Connecting the Flue180 60 / 100 Horizontal Contents Fitting the Coaxial Flue4x Screws 2x SealsFitting the 5 Flue Ø 80 / 125 Horizontal/vertical Fitting the Coaxial Flue Ø 60 / 100 VerticalFitting the Twin Pipe Ø80 120 180 Table of flue gas exhaust duct lengths Type of air suction/flue gas exhaust ductingExhaust-air m Type Combustion air intake from outsidePower supply cable Electrical connectionsPeripheral unit connection 120Connector TA on Terminal block Room Thermostat / Remote Clock ConnectionElectrical diagram DisplayCommissioning Initial preparation Electricity supplyFilling the Heating System Filling of the DHW System Combi onlyFirst ignition operation Measure the gas inlet pressure. standing + warming pressureCheck the type of gas and change the gas if necessary Analyse the combustion seeSetting Regulating the central heating ignition delay Adjust the central heating ignition delayAdjust the setting on the front panel Irst ignitionChecking the gas setting Gas settingTest function and combustion analysis Minimum gas flow combustion analysisBoiler protection devices Maintenance Maintenance guide General accessMin Tools TimeControl box access Tools Time Min Electrical unitFuse Tools Time Open the control box as above Remove the fuseMain P.C.B Tools Time Display P.C.B Tools TimeRight hand hydraulic block assembly Hydraulic UnitWay valve unit Tools Time Draining Tools TimeAutomatic air vent Tools Time Primary water pressure sensor Tools TimePump Tools Time W. Flow Switch assembly E-COMBI Tools Time Filter Tools TimeLeft hand Hydraulic block assembly Secondary Heat Exchanger E-COMBI Tools TimeCondensate Trap Tools Safety valve Time Unscrew the condense trap from the condense bodyBy-Pass Assembly Tools Time Temperature SensorManual Air vent Tools Time Main Heat Exchanger Tools TimeIsolate the gas supply. Remove the four ChangerBurner unit FanSpark generator ElectrodesPower Length Venturi BurnerFan Gas valve Annual Maintenance Plate heat exchanger By-pass & Safety valveFlow switch operation Central heating filterFault finding Overheat Insufficient Probe problemEeprom Error ErrorGAS Boiler System Commissioning Checklist Service Provider Service 1 DateService 3 Date Service 5 DateShort List 420010275800