The maximum permissible flue length for twin flue is dependent on the type of run used (see table below).

For further information relating to flue runs not illustrated, please contact the Technical Department on 0870 241 8180.

For coaxial systems, the maximum flue lengths listed in the table below take into account an elbow.

For twin flue systems the maximum flue lengths listed in the table below includes the exhaust gas/air intake terminal.

Type 5 outlets should respect the following instructions:

1- Use the same ø 80 mm flue pipes for the air intakes and exhaust gas ducts.

2- If you need to insert elbows in the air intake and exhaust gas ducts, you should consider for each one the equivalent length to be included in the calculation of developed length.

3- The exhaust gas duct should jut above the roof by at least 0.5 m.

4- The intake and exhaust gas ducts in Type C13 and C53 must be installed on the same wall, or where the exhaust is vertical and the air intake horizontal, the terminals must be on the same side of the building.

Fig. 9

120

180

195

105

 

 

Fig. 10

 

 

 

 

 

AIR INTAKE MUST NOT BE

 

 

FITTED ABOVE THE EXHAUST

 

 

AIR INTAKE

EXHAUST

 

 

 

AIR INTAKE

22

Image 22
Contents Combi 24/30/38 System24/30 Maintenance guide InstallationMaintenance OverviewOverview To the InstallerBenchmark Scheme Symbols used on the data plate Advice for the installerCE labelling Personal injury caused by falling from a height Safety regulationsNoisiness during operation Personal injury caused by knocks, stumbling etcProduct description Control panelFlue connector W. Flow switch Manual air vent Overall viewOverall Dimensions Minimum clearancesTechnical Data Model E-COMBIModel E-SYSTEM Installation Location Flushing and Water TreatmentSystem Controls Boiler is equipped with a stainless steel heat exchangerCondensate Discharge Connecting the boiler to the system Installing the BoilerMethod of positioning the boiler on the wall Is connected to the 3 bar safety relief valve Safety Valve Discharge and Condense Outlet Gas connectionConnection for Filling Loop Mbar Secondary heat exchanger Pressure relief valve By-pass Water circuit diagramManual air vent Burner Condensate trap Circuit filterVertically from a terminal on the same wall Connecting the Flue180 4x Screws 60 / 100 Horizontal Contents Fitting the Coaxial Flue 2x SealsFitting the 5 Flue Ø 80 / 125 Horizontal/vertical Fitting the Coaxial Flue Ø 60 / 100 VerticalFitting the Twin Pipe Ø80 120 180 Exhaust-air m Type Table of flue gas exhaust duct lengthsType of air suction/flue gas exhaust ducting Combustion air intake from outsidePeripheral unit connection Power supply cableElectrical connections 120Connector TA on Terminal block Room Thermostat / Remote Clock ConnectionElectrical diagram DisplayCommissioning Filling the Heating System Initial preparationElectricity supply Filling of the DHW System Combi onlyCheck the type of gas and change the gas if necessary First ignition operationMeasure the gas inlet pressure. standing + warming pressure Analyse the combustion seeAdjust the setting on the front panel Setting Regulating the central heating ignition delayAdjust the central heating ignition delay Irst ignitionTest function and combustion analysis Checking the gas settingGas setting Minimum gas flow combustion analysisBoiler protection devices Maintenance Min Maintenance guideGeneral access Tools TimeFuse Tools Time Control box access Tools Time MinElectrical unit Open the control box as above Remove the fuseMain P.C.B Tools Time Display P.C.B Tools TimeRight hand hydraulic block assembly Hydraulic UnitWay valve unit Tools Time Draining Tools TimeAutomatic air vent Tools Time Primary water pressure sensor Tools TimePump Tools Time W. Flow Switch assembly E-COMBI Tools Time Filter Tools TimeLeft hand Hydraulic block assembly Secondary Heat Exchanger E-COMBI Tools TimeCondensate Trap Tools Safety valve Time Unscrew the condense trap from the condense bodyBy-Pass Assembly Tools Time Temperature SensorIsolate the gas supply. Remove the four Manual Air vent Tools TimeMain Heat Exchanger Tools Time ChangerBurner unit FanSpark generator ElectrodesPower Length Venturi BurnerFan Gas valve Flow switch operation Annual Maintenance Plate heat exchangerBy-pass & Safety valve Central heating filterEeprom Error Fault finding Overheat InsufficientProbe problem ErrorGAS Boiler System Commissioning Checklist Service 3 Date Service ProviderService 1 Date Service 5 DateShort List 420010275800