Ariston E-COMBI 24 30 38 manual Overview, Benchmark Scheme, To the Installer

Page 3

overview

These instructions are suitable for E-COMBI and E-SYSTEM boilers :

Do not forget to complete the Benchmark Commisioning Checklist.

The Benchmark Scheme

Benchmark places responsibilities on both manufacturers and installers.

The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations.

The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.

Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme.

Visit www.centralheating.co.uk for more information.

To the Installer

As part of the commissioning of this appliance it is vital that the Log Book is completed and given to the Householder. Please ensure that your customer is aware of the importance of keeping the Log Book safe as a record of the installation and the appliance service history.

Please ensure that your customer is aware of the correct operation of the system, boiler and controls.

ARISTON recommend the use of protective clothing, when installing and working on the appliance i.e. gloves.

CUSTOMER CARE

ARISTON, as a leading manufacturer of domestic and commercial water heating appliances is committed to providing high quality products and a high quality after sales service.

Advice on installation or servicing can also be obtained by contacting the ARISTON Technical and Customer Service Departments at High Wycombe.

TECHNICAL DEPARTMENT

CUSTOMER SERVICE DEPARTMENT

Tel:

0870 241 8180

Tel:

0870 600 9888

Fax:

01494 459775

Fax:

01494 459775

GUARANTEE

The manufacturer’s guarantee is for 2 years from the date of installation or 18 months from the date of production. The guarantee is invalidated if the appliance is not installed in accordance with the recommendations made herein or in a manner not approved by the manufacturer.

To assist us in providing you with an efficient after sales service, please register your boiler at www.ariston.co.uk/register without delay.

CAUTION

In the United Kingdom, installation, start-up, adjustments and maintenance, must be performed by a competent person only, in accordance with the current Gas Safety (Installation & Use) Regulations and the instructions provided.

In the Republic of Ireland, the installation and initial start up of the appliance must be carried out by a Competent Person in accordance with the current edition of I.S.813 “Domestic Gas Installations”, the current Building Regulations, reference should also be made to the current ETCI rules for electrical installation.

All Gas Safe registered installers carry an ID card, and have a registration number. Both should be recorded in your boiler Log Book. You can check your installer is Gas Safe registered by visiting www.gassaferegister.co.uk or calling direct on 0800 408 5500.

Improper installation may cause damage or injury to individuals, animals and personal property for which the manufacturer will not be held liable.

To ensure efficient and safe operation it is recommended that the boiler is serviced annually by a competent person.

If it is known that a fault exists on the appliance, it must not be used until the fault has been corrected by a competent person.

This instruction booklet is especially designed for appliances installed in the UK and the Republic of Ireland

3

Image 3
Contents Combi 24/30/38 System24/30 Overview InstallationMaintenance Maintenance guideTo the Installer OverviewBenchmark Scheme Advice for the installer Symbols used on the data plateCE labelling Personal injury caused by knocks, stumbling etc Safety regulationsNoisiness during operation Personal injury caused by falling from a heightControl panel Product descriptionOverall view Flue connector W. Flow switch Manual air ventMinimum clearances Overall DimensionsModel E-COMBI Technical DataModel E-SYSTEM Installation Boiler is equipped with a stainless steel heat exchanger Flushing and Water TreatmentSystem Controls LocationCondensate Discharge Installing the Boiler Connecting the boiler to the systemMethod of positioning the boiler on the wall Safety Valve Discharge and Condense Outlet Gas connection Is connected to the 3 bar safety relief valveConnection for Filling Loop Mbar Condensate trap Circuit filter Water circuit diagramManual air vent Burner Secondary heat exchanger Pressure relief valve By-passConnecting the Flue Vertically from a terminal on the same wall180 2x Seals 60 / 100 Horizontal ContentsFitting the Coaxial Flue 4x ScrewsFitting the Coaxial Flue Ø 60 / 100 Vertical Fitting the 5 Flue Ø 80 / 125 Horizontal/verticalFitting the Twin Pipe Ø80 120 180 Combustion air intake from outside Table of flue gas exhaust duct lengthsType of air suction/flue gas exhaust ducting Exhaust-air m Type120 Power supply cableElectrical connections Peripheral unit connectionRoom Thermostat / Remote Clock Connection Connector TA on Terminal blockDisplay Electrical diagramCommissioning Filling of the DHW System Combi only Initial preparationElectricity supply Filling the Heating SystemAnalyse the combustion see First ignition operationMeasure the gas inlet pressure. standing + warming pressure Check the type of gas and change the gas if necessaryIrst ignition Setting Regulating the central heating ignition delayAdjust the central heating ignition delay Adjust the setting on the front panelMinimum gas flow combustion analysis Checking the gas settingGas setting Test function and combustion analysisBoiler protection devices Maintenance Tools Time Maintenance guideGeneral access MinOpen the control box as above Remove the fuse Control box access Tools Time MinElectrical unit Fuse Tools TimeDisplay P.C.B Tools Time Main P.C.B Tools TimeHydraulic Unit Right hand hydraulic block assemblyDraining Tools Time Way valve unit Tools TimePrimary water pressure sensor Tools Time Automatic air vent Tools TimePump Tools Time Filter Tools Time W. Flow Switch assembly E-COMBI Tools TimeSecondary Heat Exchanger E-COMBI Tools Time Left hand Hydraulic block assemblyUnscrew the condense trap from the condense body Condensate Trap Tools Safety valve TimeTemperature Sensor By-Pass Assembly Tools TimeChanger Manual Air vent Tools TimeMain Heat Exchanger Tools Time Isolate the gas supply. Remove the fourFan Burner unitElectrodes Spark generatorBurner Power Length VenturiFan Gas valve Central heating filter Annual Maintenance Plate heat exchangerBy-pass & Safety valve Flow switch operationError Fault finding Overheat InsufficientProbe problem Eeprom ErrorGAS Boiler System Commissioning Checklist Service 5 Date Service ProviderService 1 Date Service 3 DateShort List 420010275800