commissioning
First ignition operation
Date . . . . . . . . . . . .
Installer . . . . . . . . . .
1.Check the electrical supply.
Complete . . . . . .
6.Measure the gas inlet pressure. standing + warming pressure
Complete . . . . . .
7.Check the hydraulic water tightness.
Complete . . . . . .
10.Set up heating controls Complete . . . . . .
13.Adjust DHW flow rate on the boiler (if necessary).
Complete . . . . . .
2.Check the type of gas and change the gas if necessary.
Complete . . . . . .
5.Check the exhaust flue. See page 18
Complete . . . . . .
8.Spin the pump.
Complete . . . . . .
11.Balance the central heating circuit.
Complete . . . . . .
14.Analyse the combustion (see page 33)
Complete . . . . . .
3.Check the gas tightness.
Complete . . . . . .
6.Fill the installation.
See page 30
Complete . . . . . .
9.Set the heating power. See page 31
Complete . . . . . .
12.Check the boiler in DHW mode (combi only)
Complete . . . . . .
15.Check the ionisation current.
Complete . . . . . .
16.Explain to the end user the the boiler operation.
Complete . . . . . .
17.At the time of commissioning, complete all relevant sections of the Benchmark Checklist located on the inside back pages of this document.
Complete . . . . . .