Ariston E-COMBI 24 30 38 manual Fitting the Coaxial Flue, 60 / 100 Horizontal Contents, 4x Screws

Page 19

 

 

installation

Fitting the Coaxial Flue

Fig. 3

 

(Ø 60 / 100 Horizontal)

 

 

 

Contents:

 

118

1x Silicone O-Ring (60mm)

 

 

 

1x Elbow (90°)

 

 

2x Wall Seals (Internal & External)

 

 

1x Flue Pipe including Terminal (1 metre - 60/100)

 

 

2x Flue Clamps

Installation without extension

4x Screws

 

 

2x Seals

 

Level

Once the boiler has been positioned on the wall, fit the rubber flue

 

 

seal into the internal flue turret (see diagram opposite),

 

 

insert the elbow into the socket and rotate to the required position.

 

 

Note: It is possible to rotate the elbow 360° on its vertical axis.

 

150 mm

Using the flue clamp, seals and screws supplied (Fig 4) secure the

 

 

elbow to the boiler.

Installation with extension

 

The 1 metre horizontal flue kit (3318073) supplied is suitable for an

 

 

exact X dimension of 753mm.

slope

Level

Measure the distance from the face of the external wall to the face

 

 

of the flue elbow (X - Fig 2), this figure must now be subtracted from

 

Slope min 1° per metre

753mm, you now have the total amount to be cut from the plain end

 

* pente 5 mm par mètre

 

max 3° per metre (1° = 17mm)

of the flue.

 

 

Draw a circle around the outer flue and cut the flue to the required

Clamp

 

length taking care not to cut the inner flue, next cut the inner

Fig. 4

 

flue ensuring that the length between the inner and outer flue is

 

 

maintained. (Fig 4).

 

 

e.g.

X = 555mm

753-555 = 198mm (Length to be cut from the plain end of the flue).

Once cut to the required length, ensure that the flue is free from burrs

 

 

 

Screws

 

 

 

and reassemble the flue. If fitting the flue from inside of the building

 

 

 

 

 

 

 

 

 

 

attach the grey outer wall seal to the flue terminal and push the flue

 

 

 

 

 

through the hole, once the wall seal has passed through the hole, pull

Seal

 

 

 

 

 

 

the flue back until the seal is flush with the wall. Alternatively, the

 

 

 

 

 

flue can be installed from outside of the building, the grey outer seal

 

 

 

 

 

being fitted last.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Should the flue require extending, the flue connections are push fit, however, one flue bracket should be used to secure each metre of flue.

Note: See table for maximum and minimum flue runs.

In the event that extension pieces need to be shortened, they must only be cut at the male end and it must be ensured that the inner and outer flue remain flush.

19

Image 19
Contents Combi 24/30/38 System24/30 Overview InstallationMaintenance Maintenance guideOverview To the InstallerBenchmark Scheme Symbols used on the data plate Advice for the installerCE labelling Personal injury caused by knocks, stumbling etc Safety regulationsNoisiness during operation Personal injury caused by falling from a heightControl panel Product descriptionOverall view Flue connector W. Flow switch Manual air ventMinimum clearances Overall DimensionsModel E-COMBI Technical DataModel E-SYSTEM Installation Boiler is equipped with a stainless steel heat exchanger Flushing and Water TreatmentSystem Controls LocationCondensate Discharge Connecting the boiler to the system Installing the BoilerMethod of positioning the boiler on the wall Is connected to the 3 bar safety relief valve Safety Valve Discharge and Condense Outlet Gas connectionConnection for Filling Loop Mbar Condensate trap Circuit filter Water circuit diagramManual air vent Burner Secondary heat exchanger Pressure relief valve By-passVertically from a terminal on the same wall Connecting the Flue180 2x Seals 60 / 100 Horizontal ContentsFitting the Coaxial Flue 4x ScrewsFitting the Coaxial Flue Ø 60 / 100 Vertical Fitting the 5 Flue Ø 80 / 125 Horizontal/verticalFitting the Twin Pipe Ø80 120 180 Combustion air intake from outside Table of flue gas exhaust duct lengthsType of air suction/flue gas exhaust ducting Exhaust-air m Type120 Power supply cableElectrical connections Peripheral unit connectionRoom Thermostat / Remote Clock Connection Connector TA on Terminal blockDisplay Electrical diagramCommissioning Filling of the DHW System Combi only Initial preparationElectricity supply Filling the Heating SystemAnalyse the combustion see First ignition operationMeasure the gas inlet pressure. standing + warming pressure Check the type of gas and change the gas if necessaryIrst ignition Setting Regulating the central heating ignition delayAdjust the central heating ignition delay Adjust the setting on the front panelMinimum gas flow combustion analysis Checking the gas settingGas setting Test function and combustion analysisBoiler protection devices Maintenance Tools Time Maintenance guideGeneral access MinOpen the control box as above Remove the fuse Control box access Tools Time MinElectrical unit Fuse Tools TimeDisplay P.C.B Tools Time Main P.C.B Tools TimeHydraulic Unit Right hand hydraulic block assemblyDraining Tools Time Way valve unit Tools TimePrimary water pressure sensor Tools Time Automatic air vent Tools TimePump Tools Time Filter Tools Time W. Flow Switch assembly E-COMBI Tools TimeSecondary Heat Exchanger E-COMBI Tools Time Left hand Hydraulic block assemblyUnscrew the condense trap from the condense body Condensate Trap Tools Safety valve TimeTemperature Sensor By-Pass Assembly Tools TimeChanger Manual Air vent Tools TimeMain Heat Exchanger Tools Time Isolate the gas supply. Remove the fourFan Burner unitElectrodes Spark generatorBurner Power Length VenturiFan Gas valve Central heating filter Annual Maintenance Plate heat exchangerBy-pass & Safety valve Flow switch operationError Fault finding Overheat InsufficientProbe problem Eeprom ErrorGAS Boiler System Commissioning Checklist Service 5 Date Service ProviderService 1 Date Service 3 DateShort List 420010275800