Ariston E-COMBI 24 30 38 Electrical connections, Power supply cable, Peripheral unit connection

Page 24

installation

WARNING

Before performing any work on the boiler, first disconnect it from the electrical power supply using the external bipolar switch and remove the fuse.

Electrical connections

For increased safety, ask a qualified technician to perform a thorough check of the electrical system.

The manufacturer is not responsible for any damage caused by the lack of a suitable earthing system or by the malfunctioning of the electricity mains supply.

Make sure that the system is able to withstand the maximum power used by the boiler (this is indicated on the appliance data plate). Check that the section of the wires is suitable and is not less 0.75 mm2 The appliance must be connected to an efficient earthing system if it is to operate correctly.

The power supply cable must be connected to a 230V-50Hz network, where the L-N poles and the earth connection are all respected.

Important!

In the event that the power supply cable has to be changed, replace it with one with the same specification.

Power supply cable

120

H05V2V2-F

140

Important!

The appliance is supplied with a fly-lead already connected, this must be connected to a 240V supply fused at 3 amp it must give complete electrical isolation of the appliance, by use of a fused double pole isolator having a contact separation of at least 3mm in all poles or alternatively

by means of a 3A fused three pin plug and unswitched shuttered socket outlet both complying with BS1363.

The use of multiplugs, extension leads or adaptors is strictly prohibited. It is strictly forbidden to use the piping from the hydraulic, heating and gas systems for the appliance earthing connection.

The boiler is not protected against the effects caused by lightning. If the boiler fuses need to be replaced, use 2A rapid fuses.

Peripheral unit connection

To access peripheral unit connections carry out the following steps:

-Disconnect the boiler from the power supply

-Remove the casing by unhooking it from the instrument panel

-Rotate the control panel while pulling it forwards

-Unscrew the three screws on the back cover of the instrument panel

-Unhook the right side clip and the right front clip; then lift the flap

The following connections are located here: - the room thermostat 1.

Caution!

For the connection and positioning of the wires belonging to optional peripheral units, please refer to the installation manuals of these units.

24

Image 24
Contents Combi 24/30/38 System24/30 Installation MaintenanceMaintenance guide OverviewTo the Installer OverviewBenchmark Scheme Advice for the installer Symbols used on the data plateCE labelling Safety regulations Noisiness during operationPersonal injury caused by falling from a height Personal injury caused by knocks, stumbling etcProduct description Control panelFlue connector W. Flow switch Manual air vent Overall viewOverall Dimensions Minimum clearancesTechnical Data Model E-COMBIModel E-SYSTEM Installation Flushing and Water Treatment System ControlsLocation Boiler is equipped with a stainless steel heat exchangerCondensate Discharge Installing the Boiler Connecting the boiler to the systemMethod of positioning the boiler on the wall Safety Valve Discharge and Condense Outlet Gas connection Is connected to the 3 bar safety relief valveConnection for Filling Loop Mbar Water circuit diagram Manual air vent BurnerSecondary heat exchanger Pressure relief valve By-pass Condensate trap Circuit filterConnecting the Flue Vertically from a terminal on the same wall180 60 / 100 Horizontal Contents Fitting the Coaxial Flue4x Screws 2x SealsFitting the 5 Flue Ø 80 / 125 Horizontal/vertical Fitting the Coaxial Flue Ø 60 / 100 VerticalFitting the Twin Pipe Ø80 120 180 Table of flue gas exhaust duct lengths Type of air suction/flue gas exhaust ductingExhaust-air m Type Combustion air intake from outsidePower supply cable Electrical connectionsPeripheral unit connection 120Connector TA on Terminal block Room Thermostat / Remote Clock ConnectionElectrical diagram DisplayCommissioning Initial preparation Electricity supplyFilling the Heating System Filling of the DHW System Combi onlyFirst ignition operation Measure the gas inlet pressure. standing + warming pressureCheck the type of gas and change the gas if necessary Analyse the combustion seeSetting Regulating the central heating ignition delay Adjust the central heating ignition delayAdjust the setting on the front panel Irst ignitionChecking the gas setting Gas settingTest function and combustion analysis Minimum gas flow combustion analysisBoiler protection devices Maintenance Maintenance guide General accessMin Tools TimeControl box access Tools Time Min Electrical unitFuse Tools Time Open the control box as above Remove the fuseMain P.C.B Tools Time Display P.C.B Tools TimeRight hand hydraulic block assembly Hydraulic UnitWay valve unit Tools Time Draining Tools TimeAutomatic air vent Tools Time Primary water pressure sensor Tools TimePump Tools Time W. Flow Switch assembly E-COMBI Tools Time Filter Tools TimeLeft hand Hydraulic block assembly Secondary Heat Exchanger E-COMBI Tools TimeCondensate Trap Tools Safety valve Time Unscrew the condense trap from the condense bodyBy-Pass Assembly Tools Time Temperature SensorManual Air vent Tools Time Main Heat Exchanger Tools TimeIsolate the gas supply. Remove the four ChangerBurner unit FanSpark generator ElectrodesPower Length Venturi BurnerFan Gas valve Annual Maintenance Plate heat exchanger By-pass & Safety valveFlow switch operation Central heating filterFault finding Overheat Insufficient Probe problemEeprom Error ErrorGAS Boiler System Commissioning Checklist Service Provider Service 1 DateService 3 Date Service 5 DateShort List 420010275800