Ariston E-COMBI 24 30 38 manual Overall Dimensions, Minimum clearances

Page 8

product description

Overall Dimensions

Minimum clearances

 

 

 

 

 

 

 

In order to allow easy access to the boiler for maintenance operations,

E-COMBI

 

 

 

 

 

 

the boiler must be installed in accordance with the clearances stated

 

 

 

 

 

 

to the left (opposite).

 

 

 

 

 

 

 

 

 

200

 

 

200

 

 

 

 

 

120

120

 

180

25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

300

5

 

 

 

 

 

 

 

5

770

 

 

 

 

 

770

450

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

300

 

 

 

 

28

150

 

 

 

65

67

67

65

315

mod. 24

 

 

 

 

 

 

 

 

 

 

385

mod. 30/35

 

 

E-SYSTEM

 

 

 

 

 

 

 

 

200

 

200

 

 

 

 

 

120

120

 

 

180

25

 

 

 

 

 

 

 

 

 

 

770

 

 

 

 

 

770

 

 

 

 

 

 

28

150

 

 

 

132

 

132

 

315

mod. 24

 

 

 

 

 

 

 

 

 

 

 

 

385

mod. 30

 

 

A. Central Heating Flow

 

 

 

 

 

B. Domestic Hot Water Outlet

 

 

 

 

 

C. Gas Inlet

 

 

 

 

 

 

 

 

D. Domestic Cold Water Inlet

 

 

 

 

 

E. Central Heating Return

 

 

 

 

 

8

 

 

 

 

 

 

 

 

Image 8
Contents Combi 24/30/38 System24/30 Installation MaintenanceMaintenance guide OverviewBenchmark Scheme To the InstallerOverview CE labelling Advice for the installerSymbols used on the data plate Safety regulations Noisiness during operationPersonal injury caused by falling from a height Personal injury caused by knocks, stumbling etcProduct description Control panelFlue connector W. Flow switch Manual air vent Overall viewOverall Dimensions Minimum clearancesTechnical Data Model E-COMBIModel E-SYSTEM Installation Flushing and Water Treatment System ControlsLocation Boiler is equipped with a stainless steel heat exchangerCondensate Discharge Method of positioning the boiler on the wall Installing the BoilerConnecting the boiler to the system Connection for Filling Loop Safety Valve Discharge and Condense Outlet Gas connectionIs connected to the 3 bar safety relief valve Mbar Water circuit diagram Manual air vent BurnerSecondary heat exchanger Pressure relief valve By-pass Condensate trap Circuit filter180 Connecting the FlueVertically from a terminal on the same wall 60 / 100 Horizontal Contents Fitting the Coaxial Flue4x Screws 2x SealsFitting the 5 Flue Ø 80 / 125 Horizontal/vertical Fitting the Coaxial Flue Ø 60 / 100 VerticalFitting the Twin Pipe Ø80 120 180 Table of flue gas exhaust duct lengths Type of air suction/flue gas exhaust ductingExhaust-air m Type Combustion air intake from outsidePower supply cable Electrical connectionsPeripheral unit connection 120Connector TA on Terminal block Room Thermostat / Remote Clock ConnectionElectrical diagram DisplayCommissioning Initial preparation Electricity supplyFilling the Heating System Filling of the DHW System Combi onlyFirst ignition operation Measure the gas inlet pressure. standing + warming pressureCheck the type of gas and change the gas if necessary Analyse the combustion seeSetting Regulating the central heating ignition delay Adjust the central heating ignition delayAdjust the setting on the front panel Irst ignitionChecking the gas setting Gas settingTest function and combustion analysis Minimum gas flow combustion analysisBoiler protection devices Maintenance Maintenance guide General accessMin Tools TimeControl box access Tools Time Min Electrical unitFuse Tools Time Open the control box as above Remove the fuseMain P.C.B Tools Time Display P.C.B Tools TimeRight hand hydraulic block assembly Hydraulic UnitWay valve unit Tools Time Draining Tools TimeAutomatic air vent Tools Time Primary water pressure sensor Tools TimePump Tools Time W. Flow Switch assembly E-COMBI Tools Time Filter Tools TimeLeft hand Hydraulic block assembly Secondary Heat Exchanger E-COMBI Tools TimeCondensate Trap Tools Safety valve Time Unscrew the condense trap from the condense bodyBy-Pass Assembly Tools Time Temperature SensorManual Air vent Tools Time Main Heat Exchanger Tools TimeIsolate the gas supply. Remove the four ChangerBurner unit FanSpark generator ElectrodesPower Length Venturi BurnerFan Gas valve Annual Maintenance Plate heat exchanger By-pass & Safety valveFlow switch operation Central heating filterFault finding Overheat Insufficient Probe problemEeprom Error ErrorGAS Boiler System Commissioning Checklist Service Provider Service 1 DateService 3 Date Service 5 DateShort List 420010275800