Heat & Glo LifeStyle CERONA-36 Termination Locations, Vent Termination Minimum Clearances

Page 11

4 Termination Locations

A.Vent Termination Minimum Clearances

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

Measure vertical clearances from this surface.

2FT.

MIN.

TERMINATION CAP

 

 

 

 

HORIZONTAL

 

 

 

 

20 INCHES

 

 

 

OVERHANG

 

 

 

 

 

VERTICAL

 

 

 

 

 

 

 

LOWEST

 

 

 

WALL

 

 

 

 

DISCHARGE

 

 

 

 

OPENING

 

 

 

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure horizontal clearances from this surface.

(See Figure 4.4 for specific clearances)

Figure 4.1

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.2 Minimum Height from Roof to

Lowest Discharge Opening

Figure 4.2 specifies minimum vent heights for various pitched roofs.

 

GAS, WOOD or FUEL

 

 

OIL TERMINATION

20 IN.

 

 

(MINIMUM) TO

 

 

PERPENDICULAR

 

GAS

WALL (GAS ONLY)

 

 

18 IN.

TERMINATION

 

 

A

 

 

 

 

Gas Termination

Wood & Fuel Oil Termination

 

 

 

A

 

6 in.

20 in.

 

 

Figure 4.3 Multiple Vertical Termination

 

 

 

 

 

 

 

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. A •

6/06

11

Image 11 Contents
CERONA-36 CERONA-42 Homeowner Reference Information CongratulationsTable of Contents Combustible Materials Specification High Altitude InstallationsBTU Specifications Non-Combustible Materials SpecificationRequirements for the Commonwealth of Massachusetts Tools and Supplies Needed Design and Installation ConsiderationsGetting Started Inspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseTOP of Arch Opening Mantel ProjectionsCerona-42 Hearth ExtensionVent Termination Minimum Clearances Termination LocationsAlcove Applications ServiceContinue Adding Vent Components Install Support BracketsTo Install the Heat Shield Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsCerona-36 only Vent DiagramsTop Vent Horizontal Termination Cerona-36 only 0.5 ftV1 = 50 FT MAX .2 M Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination 152 Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Appliance Preparation Removing Non-combustible Facing Material AssemblyMaterial Installing Non-combustible FacingSecuring and Leveling the Appliance Cerona-36 Cerona-42 Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical Sections Heat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap 14 Minimum Height from Roof to Lowest Discharge Opening Installing Roof Flashing and Vertical Termination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireOptional Accessories Requirements Properly grounded Not operate unlessJunction Box Installation Facing Material 11FinishingFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsRisk of Fire Finishing Material Thickness from 3/4 in. to 1-1/4Position of board and template Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36LOG #4 SRV2106-704 Log #4 is form Model Cerona-42 Step Grilles and Trim Glass AssemblyAir Shutter Setting Before operating this appliance have a qualified technician Operating InstructionsBefore Lighting Appliance Intellifire Ignition Lighting ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Intellifire Ignition System TroubleshootingTroubleshooting Intellifire Ignition System Before servicing Maintaining and Servicing ApplianceInspect Maintenance Tasks Model Cerona-36 Model Cerona-42 Appliance Dimensions Diagram16Reference Materials DVP45 45 Elbow Vent Components DiagramsDVP-TRAPK1 DVP-TRAP2 DVP-TRAPK2 COOL-ADD DVP-FBHT Cerona-36 Log Set Assembly Service PartsCERONA-36 Service Parts ListCERONA-42 Cerona-42 Log Set AssemblyCERONA-42 CERONA-36 CERONA-42 Limited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyContact Information
Related manuals
Manual 64 pages 10.74 Kb Manual 1 pages 2.44 Kb