Step 7.
Continue to assemble pipe sections until the height of the vent (before adding the termination cap) meets the minimum code requirements as outlined in the current
Step 8.
Slip the storm collar over the pipe, and push it down to the top of the flashing (Figure 5.16). Use
OPTIONAL HIGH WIND
TERMINATION CAP
SECURE FLASHING WITH
AND ROOFING NAILS
Figure 5.16
Step 9.
Twist-lock the vent cap and seal.
Note: For
NAILS
CEILING FIRESTOP
MIN. 1 in. (25mm)
CLEARANCE
MIN. 1 in. (25mm)
CLEARANCE
MIN. 1 in. (25mm)
CLEARANCE
MIN. 1 in. (25mm)
CLEARANCE
Figure 5.17
WARNING
Fire Risk.
Explosion Risk.
•Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.
10/08 | Page 17 |