Hearth and Home Technologies COLBAY-FS-B owner manual Blower Installation, Black

Page 31

H. Blower Installation

INCLUDED IN KIT: Blower; 2 female spade wire connec- tors.

TOOLS REQUIRED: Phillips head screwdriver.

Blower motor comes standard with 2 male spade wire connectors. If your appliance has a different connec- tion, use the two female spade wire connectors provided to modify the appliance wiring harness.

Turn off power supply.

Remove blower housing from appliance, if necessary.

Disassemble housing if needed, retaining all fasteners, and remove the blower.

Reassemble blower in housing using fasteners previously removed.

Reinstall blower housing to appliance.

Turn power supply back on.

 

Snap Disk

 

 

 

Fan Speed

 

F

F

 

 

WHITE

WHITE

Control

 

 

 

 

 

 

 

 

 

BLACK

 

BLACK

 

BLACK

 

F = Female

 

 

 

 

 

 

 

 

 

 

 

 

M = Male

 

 

 

 

F

 

 

 

 

 

 

 

M

BLACK

F M

 

BLACK

 

 

 

 

 

 

 

Power Cord (110 VAC)

 

 

Ground

 

 

 

 

GRN

WHITE

 

 

 

 

 

 

 

 

 

 

BLACK

M F

 

Strain Relief Bushing

 

 

 

 

 

 

 

Fan Assembly

 

 

 

 

 

 

 

Figure 8.12 Blower Wiring Diagram

 

 

 

 

 

 

10/08

Quadra-Fire • Columbia Bay • 250-5195 Rev. K

Page 31

Image 31
Contents Do Discardnot What to do if you smell gasCOLBAY-FS-B Do not Discard this ManualModel Name Test Lab Report No Serial Number BarcodeTable of Contents 1Listing and Code Approvals BELOW. Keep Clear of ALL Obstructions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Tools and Supplies Needed Design & Installation ConsiderationsGetting Started Inspect Appliance & ComponentsSelecting Appliance Location Appliance Location and ClearancesClearances Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Measuring Standards Vent InformationVenting Components Use of ElbowsVenting Guidelines How to Use the Vent GraphVertical Distance From Appliance to To the 90 Elbow Step Horizontal TerminationWallline Thimble Fold Strap Here Sheet Metal Screw Direct Vent Pipe Vertical TerminationStep Twist-lock the vent cap and seal Cathedral Ceiling Top Adapter Flex Pipe Sheet Metal Screws Step Class a Metal ChimneyExisting Masonry Chimney Retro Connector Fuel Conversions Gas InformationConverting to LP Gas Valve Regulator Replacement Pressure Gas Pressures Gas ConnectionCheck for GAS Leaks Electrical Information Recommendation for WireConnecting to the Appliance Standing Pilot Ignition System WiringThermopile GAS Pilot Ignitor Thermocouple Remove Shipping Materials Appliance SetupAccessories Brick Installation Door Crown InstallationPositioning the Logs Install NEW Brick SETMineral Wool Glass Door ReplacementBlack Blower InstallationShutter Adjustment Vertical Damper AdjustmentBefore Lighting Appliance Operating InstructionsControls Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsSymptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceMaintenance Tasks Inspect Service and Maintenance Log Reference Materials Appliance Dimension DiagramSLP Series Vent Components Vent Components DiagramMiscellaneous Vent Components ListPart number list on following Log Set AssemblyStocked At DepotValve Components Pedestal ComponentsStocked DepotCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Columbia Bay Direct Vent Gas Appliance Serial Number Date Purchased Date Installed Dealer Telephone