3. Install Support Brackets

For Horizontal Runs - The flue system must be supported every five (5) feet (1.5m) of horizontal run by a horizontal pipe support. To install support brackets for horizontal runs:

Place the pipe supports around the flue pipe.

Nail the pipe supports to the framing members.

For Vertical Runs - The flue system must be supported every eight feet (2.4 M) above the heater flue outlet by wall brackets. To install support brackets for vertical runs:

Attach wall brackets to the flue pipe and secure the wall bracket to the framing members with nails or screws.

WALL BRACKET

WALL STUD

8 FT.

(2.4m)

FLUE

OUTLET

1 INCH MIN.

(25mm)

FIGURE 1.21 Installing Support Brackets

4. Install Firestops

For Horizontal Runs - Firestops are REQUIRED on both sides of a combustible wall through which the flue passes.

To install firestops (heat shield) for horizontal runs that pass through either interior or exterior walls:

Cut a 10-inch by 12-inch (254 mm X 305 mm) hole through the wall.

Position the firestops on both sides of the hole pre- viously cut and secure the firestops with nails or screws.

The pipe opening of the firestops MUST BE placed towards the bottom of the firestop.

Continue the flue run through the firestop.

10" (254mm)

INTERIOR

WALL SHIELD

12" (305mm)

FIGURE 1.22 Flue Pipe & Firestop

For Vertical Runs - One firestop is REQUIRED at the hole in each ceiling through which the flue passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the vertical flue component.

Mark the ceiling to establish the centerpoint of the flue.

Drill a hole or drive a nail through this center point.

Check the floor above for any obstructions, such as wiring or plumbing runs.

Reposition the heater and flue system, if neces- sary, to accommodate the ceiling joists and/or ob- structions.

Cut a 10" x 10" (254mm X 254mm) hole through the ceiling, using the firestop pipe opening as a guide.

Frame the hole with framing lumber the same size as the ceiling joists.

16

Heat & Glo • 6000TRSI-AUC2078-900 Rev. G • 12/06

Image 16
Contents Installation and Operation Instructions Model 6000TRSI-AUCHeat & Glo Quality Systems Table of Contents Installation Instructions 476 686 31-5/8 803 174 126.9Top Flue Rear FlueClearance Requirements Framing the Heater Clearances n mm Flue System Approvals and Installations 10.97m13.1 331mm 24 610mm ElbowsFlueing with One 90 Elbow +H 1 FT + H 1 FT 13 Flueing with three 90 elbows Flueing with Three 3 90 Elbows + H 1 FTFlueing Out the Rear Flue Flueing Out the Top FlueAssembling Flue Components Install Support Brackets Flue Termination Connecting the GAS Supply Must be Positioned SO That the Arrow is Pointing UPIgnition System Wiring Shock RiskBlower Fan Mantel Clearances Clearance to a mantelpiece is 12 inches 305mm. See FigureLOG Placement Instructions TabsHeat & Glo 6000TRSI-AUC 2078-900 Rev. G 12/06 Installer Testing Operating InstructionsOperating Cautions For Your Safety Read Before Lighting Instructions Safety & Lighting InformationPower Outage FAN OperationServicing and Maintenance Removal of Components for Service Parts ReplacementAdjustments and Replacement Parts Removal of Covers for ServicingMaintenance Tasks Inspect Maintenance TasksTroubleshooting Electronic Ignition SystemAdjust the air shutter at the base of the burner Log set assembly 6000TRSI-AUC6000TRSI-AUC GLA-6TRXILimited 10 Year Warranty Heat & GLO, a brand of Hearth & Home Technologies IncMelbourne