Hearth and Home Technologies 6000TRSI-AUC Removal of Covers for Servicing, Parts Replacement

Page 29

A.REMOVAL OF COVERS FOR SERVICING

A.Control Compartment Access Door

Lift the lower door up and out to access the gas con- trols.

B. Trim Door and Glass Door

Lift the front trim door up and out away from the ap- pliance side surrounds. Replace the door when ser- vicing is complete.

Noting carefully how the brackets fit on the glass, release the two spring latches at the top and two at the bottom of the glass door. Carefully lift the glass up and out away from the appliance. See Figure 3.2.

GLASS DOOR

ASSEMBLY

FIGURE 3.2

B.REMOVAL OF COMPONENTS FOR SERVICE

1. BURNER

Release the screws at the base of the log grate and carefully lift up and remove the logs and log grate.

Remove the base pan.

Unscrew the brackets at both ends of the burner and the top two screws locating the pilot bracket (see Figure 3.3). Slide the burner away from the burner

orifice.

PILOT BRACKET

RETAINING SCREWS

FIGURE 3.3

CAUTION: ALL SCREWS WHICH WERE REMOVED MUST BE REPLACED.

2. PILOT ASSEMBLY/IGNITION SYSTEM

Remove the log set, log grate and burner assembly.

Disconnect the gas supply tube from the underside of the pilot burner.

Disconnect the ignition cable.

Disconnect the attachment nut from the underside of the thermocouple. The thermocouple can then be separated from the pilot bracket.

Unscrew the pilot assembly bracket and remove.

C. PARTS REPLACEMENT

1. FAN/SWITCHES

Unplug the fan wires from the junction box wires by pulling the male and female connectors apart and slide the fan out the front of the lower controls com- partment.

Disconnect the wires from the fan speed control switch, pull off the knob, and remove the nut holding the speed control to the bracket.

Disconnect the wires from the fan temperature sen- sor switch and remove the nut holding the switch bracket onto the bottom of the firebox.

2. GLASS PANEL

To replace the glass door, place the bottom edge into the lower holders, push glass against unit and secure the two spring latches at the top and bot- tom.

D.ADJUSTMENTS AND REPLACEMENT PARTS

Adjustments and replacement parts for this appliance should only be done by a qualified service person. A wiring diagram for the appliance is shown in SECTION

2.0OPERATING INSTRUCTIONS. A replacement part table is shown in SECTION 4.0 of this manual.

Heat & Glo • 6000TRSI-AUC2078-900 Rev. G • 12/06

29

Image 29
Contents Model 6000TRSI-AUC Installation and Operation InstructionsHeat & Glo Quality Systems Table of Contents 476 686 31-5/8 803 174 126.9 Installation InstructionsClearance Requirements Rear FlueTop Flue Framing the Heater Clearances n mm 10.97m Flue System Approvals and InstallationsElbows 13.1 331mm 24 610mmFlueing with One 90 Elbow +H 1 FT + H 1 FT 13 Flueing with three 90 elbows + H 1 FT Flueing with Three 3 90 ElbowsFlueing Out the Top Flue Flueing Out the Rear FlueAssembling Flue Components Install Support Brackets Flue Termination Must be Positioned SO That the Arrow is Pointing UP Connecting the GAS SupplyShock Risk Ignition System WiringBlower Fan Clearance to a mantelpiece is 12 inches 305mm. See Figure Mantel ClearancesTabs LOG Placement InstructionsHeat & Glo 6000TRSI-AUC 2078-900 Rev. G 12/06 Operating Instructions Installer TestingOperating Cautions Safety & Lighting Information For Your Safety Read Before Lighting InstructionsFAN Operation Power OutageServicing and Maintenance Parts Replacement Removal of Components for ServiceAdjustments and Replacement Parts Removal of Covers for ServicingInspect Maintenance Tasks Maintenance TasksElectronic Ignition System TroubleshootingAdjust the air shutter at the base of the burner 6000TRSI-AUC Log set assemblyGLA-6TRXI 6000TRSI-AUCHeat & GLO, a brand of Hearth & Home Technologies Inc Limited 10 Year WarrantyMelbourne