Hearth and Home Technologies 6000TRSI-AUC, Heat & Glo manual Flue Termination

Page 17

10" (254mm)

10” (254mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

MEMBERS

 

CEILING

 

FIGURE 1.23 Hole and New Framing Members

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

FIGURE 1.24 Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NAILS (4 REQUIRED)

RAFTER

CEILING

CEILING FIRESTOP

FIGURE 1.25 Attic Firestop

C. Flue Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal flue:

The rear flue heat shield MUST be placed one inch above the top of the flue between the wall shield and the base of the termination cap.

One section of the heat shield is attached to the wall shield. The other is attached to the termination cap in the same manner.

The heat shield sections will overlap to match the wall thickness (depth).

If the wall thickness does not allow the required 1-1/2 inch heat shield overlap, an extended heat shield must be used. The extended heat shield will need to be cut to the thickness of the wall and be attached to the wall shield.

The small leg in the shield rests on top of the flue to properly space it from the pipe section (see Figure 1.26).

Interior

Rear Vent

Wall Shield

Heat Shield

 

38mm min.

 

overlap

Outer Flue

 

Inner Flue

38mm min.

 

 

Overlap

INTERIOR

EXTERIOR

 

FIGURE 1.26 Flueing through the Wall

The termination kit should pass through the wall firestops from the exterior of the building.

Heat & Glo • 6000TRSI-AUC2078-900 Rev. G • 12/06

17

Image 17
Contents Model 6000TRSI-AUC Installation and Operation InstructionsHeat & Glo Quality Systems Table of Contents 476 686 31-5/8 803 174 126.9 Installation InstructionsClearance Requirements Rear FlueTop Flue Framing the Heater Clearances n mm 10.97m Flue System Approvals and InstallationsElbows 13.1 331mm 24 610mmFlueing with One 90 Elbow +H 1 FT + H 1 FT 13 Flueing with three 90 elbows + H 1 FT Flueing with Three 3 90 ElbowsFlueing Out the Top Flue Flueing Out the Rear FlueAssembling Flue Components Install Support Brackets Flue Termination Must be Positioned SO That the Arrow is Pointing UP Connecting the GAS SupplyShock Risk Ignition System WiringBlower Fan Clearance to a mantelpiece is 12 inches 305mm. See Figure Mantel ClearancesTabs LOG Placement InstructionsHeat & Glo 6000TRSI-AUC 2078-900 Rev. G 12/06 Operating Instructions Installer TestingOperating Cautions Safety & Lighting Information For Your Safety Read Before Lighting InstructionsFAN Operation Power OutageServicing and Maintenance Parts Replacement Removal of Components for ServiceAdjustments and Replacement Parts Removal of Covers for ServicingInspect Maintenance Tasks Maintenance TasksElectronic Ignition System TroubleshootingAdjust the air shutter at the base of the burner 6000TRSI-AUC Log set assemblyGLA-6TRXI 6000TRSI-AUCHeat & GLO, a brand of Hearth & Home Technologies Inc Limited 10 Year WarrantyMelbourne