Soap water method

(1)Remove the caps from the 2-way and 3-way valves.

(2)Remove the service-port cap from the 3-way valve.

(3)To open the 2-way valve turn the valve stem coun- terclockwise approximately 90°, wait for about 2~3 sec, and close it.

(4)Apply a soap water or a liquid neutral detergent on the indoor unit connection or outdoor unit connec- tions by a soft brush to check for leakage of the connecting points of the piping.

(5)If bubbles come out, the pipes have leakage.

3.Evacuation

Connect the charge hose end described in the pre- ceding steps to the vacuum pump to evacuate the tub- ing and indoor unit.

Confirm the "Lo" knob of the manifold valve is open. Then, run the vacuum pump.

The operation time for evacuation varies with tubing length and capacity of the pump. The following table shows the time required for evacuation.

Required time for evacuation when 30 gal/h vacuum pump is

used

If tubing length is less than 10m

if tubing length is longer than 10m

(33 ft)

(33 ft)

 

 

10 min. or more

15 min. or more

 

 

When the desired vacuum is reached, close the "Lo" knob of the manifold valve and stop the vacuum pump.

4.Finishing the job

With a service valve wrench, turn the valve stem of liquid side valve counter-clockwise to fully open the valve.

Turn the valve stem of gas side valve counter-clock- wise to fully open the valve.

Loosen the charge hose connected to the gas side service port slightly to release the pressure, then remove the hose.

Replace the flare nut and its bonnet on the gas side service port and fasten the flare nut securely with an adjustable wrench. This process is very important to prevent leakage from the system.

Replace the valve caps at both gas and liquid side service valves and fasten them tight.

This completes air purging with a vacuum pump. The air conditioner is now ready to test run.

-29-

Gas side

Liquid side

3-way valve (Close)

2-way valve (Open)

Cap

Hexagonal wrench

Indoor unit

Outdoor unit

 

Manifold valve

Pressure

Hi

gauge

Lo

 

 

 

Open

Close

Vacuum pump

Image 29
Contents Room Air Conditioner Contents Code Type Code of Model Meaning Details of 2003 LG Model NameIndoor Unit FunctionsRoom, Temperature Checking Operation ON/OFF Operation Mode SelectionTemperature Setting Setting the Time or Timer Timer SelectionLSC183VMA Product ReferencesIndoor Unit DimensionsIndoor Unit Gas side Outdoor Unit 18KCooling Only Models Refrigeration Cycle Diagram18K Cooling Only Models Wiring DiagramOperation Details Cooling Mode OperationHealthy Dehumidification Mode Defrost Control Heating Mode OperationFuzzy Operation for Cooling Fuzzy Operation C/O ModelFuzzy Operation H/P Model Airflow Speed Selection On-Timer OperationFuzzy Operation for Dehumidification Fuzzy Operation for HeatingOff-Timer ↔ On-Timer Operation Off-Timer OperationSleep Timer Operation Chaos Swing ModeRemote Control Operation Mode Jet Cool Mode Operation H/P ModelForced Operation Test operationDisplay Function Compressor on IndicatorSelf-diagnosis Function Heating ModelInstallation of indoor, Outdoor unit InstallationSelect the best location Piping length and elevationOpen panel front Preparing work for InstallationCover pipe and cover side remove Drain hose junctionHow to fix installation plate Connection of piping Indoor Flaring Work and Connection of PipingFlaring work Wrap the insulation material around the connecting portion Indoor unit installationBad case Installation Information For right piping Good caseConnection of the pipes-Outdoor For right piping. Follow the instruction belowConnection of the cable Connecting The Cable Between Indoor Unit and Outdoor UnitFor strand wiring Connection method of the connecting cableExampleChecking the drainage Checking the Drainage and forming the pipingsForm the piping To check the drainageConnect the cable to the indoor unit Circuit Breaker Use a circuit breaker or time delay fuseAir purging Air PurgingAir purging with vacuum pump PreparationFinishing the job EvacuationDrive three screws Panel Front AssemblyPump Down Procedure Prepare remote controlTest Running Settlement of outdoor unitOperation Name and Function-Remote ControlTo remove the Control Box To remove the Grille from the ChassisTo remove the Motor To remove the EvaporatorBefore removing the Turbo Fan Way Valve Liquid Side Way, 3-way ValveAir purging ProcedureCheck for gas leakage Purge the air from the systemSet the 2-way valve to the closed position Pumping downAir purging of the charge hose Re-air purging Gas leakage Balance refrigerant of the 2-way, 3-way valvesAll amount of refrigerant leaked EvacuationAfter Evacuation Gas ChargingConnect the charge hose to the charging cylinder Purge the air from the charge hoseTrouble analysis Cycle Troubleshooting GuideYES Product is not operate with the remote controller Compressor/Outdoor Fan are unable to drive Check connecting condition of the CN-MOTOR Connector When Indoor Fan does not operateWhen Vertical Louver does not operate When a comunication error occurs Indoor Unit Phenomena in case of connecting errorOutdoor Unit Indoor Fan Speed Voltage of Connectors according toNo. of pins Main PWB ASSYIndoor Unit Electronic Control DeviceModel Main PWB ASSYOutdoor UnitDisplay PWB Assembly SUB PCB ASM Indoor UnitMicom Outdoor UnitExploded View and Replacement Parts List Location Description Remarks LSC183VMA Parts ListindoorW0CZZ Outdoor unit18KLocation Description QTY Remarks LSC183VMA Parts ListoutdoorMemo Memo August