Bradford-White Corp M4403S, CX), M1XR403S*FCX, MI50L, MI504S, MI60T, MI40T, MI404T, MI30T Wrench Boss

Page 15

SERVICE PROCEDURE RG-V

Combination Thermostat/Gas Valve Testing

and Replacement

Step 7. Removal of combination thermostat/gas valve.

a)Disconnect main burner feedline (¾” wrench), pilot tube (7/16" wrench) and thermocouple (3/8" wrench) from combination thermostat/gas valve & remove burner from combustion chamber.

NOTE: Feed line nut for natural gas control uses right hand threads,

LP control uses left hand thread.

b)Remove piezo bracket with piezo igniter (refer to SERVICE PROCEDURE RG-IV) from Combination Thermostat/Gas Valve.

c)Remove Combination Thermostat/Gas Valve from heater, rotating counter clockwise using a control body wrench or a length of ½" NPT pipe threaded into inlet of control.

To remove or install control, insert only ½" NPT threaded pipe into inlet and use to loosen or tighten control.

Wrench Boss

Step 8. Installation of Combination Thermostat/Gas Valve.

a)Install new combination thermostat/gas Valve using a control body wrench or a length of ½" NPT pipe threaded into inlet of control. DO NOT OVER TIGHTEN. Use caution not to damage cast

aluminum body of combination thermostat/gas valve. Be certain not to damage the bundled wire

leads. Note: Combination thermostat/gas Valve must be installed in proper upright position to assure the feedline will align properly at the inner door flange.

DO NOT OVER TIGHTEN. If control is turned past proper alignment, do not reverse direction to align.

b)Reattach Piezo bracket with Piezo igniter to combination thermostat/gas valve.

c)Reattach main burner feedline, pilot tube and thermocouple to combination thermostat/gas valve.

NOTE: Feedline nut for natural gas control uses right hand threads,

LP control uses left hand thread.

d)Gather wire leads of combination thermostat/gas valve and Piezo igniter and secure along side of feedline using new wire tie provided.

e)Connect gas supply piping to inlet of control. Use back up wrench on wrench boss of control, never use back up wrench on body of control.

Step 9. Reinstallation of inner door assembly.

a) Prior to reinstallation of inner door, fully inspect inner door gasket for the following:

> Tears

> Gasket Adhesion to inner door

> Missing Material

> Other imperfections that will inhibit proper seal

> Cracks

> Material left on combustion chamber

> Dirt or debris

 

If the gasket is not effected by any of the above, gasket replacement will not be required. If replacement is required, replace using new gasket kit following the instructions provided with kit.

16

Image 15
Contents MI30T*FBN,CX M430T*FBN,CX MI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CXMI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX Table of Contents Introduction Bradford White Defender Safety SystemFlammable Vapor Ignition Resistant Water Heaters Troubleshooting ChartIf the information in these instructions is not Service Procedure RG-IProceed to Inner Door Gasket Replacement Procedure Followed exactly, a fire or explosion may result causingInstallation of Inner Door With Gasket Replace outer jacket burner access door Closed Circuit Thermocouple Testing Robertshaw Control Service Procedure RG-IIThermocouple Testing and Replacement Closed Circuit Thermocouple Testing White Rodgers ControlThermocouple Replacement Open Circuit Thermocouple TestingPilot Assembly Inspection, Cleaning and Replacement Service Procedure RG-IIIService Procedure RG-IV Piezo Igniter, Electrode Testing and ReplacementPiezo IGNITER, Electrode Testing and Replacement Line Pressure Service Procedure RG-VCombination Thermostat/Gas Valve Testing Replacement Combination Thermostat/Gas Valve Testing and ReplacementThermocouple Testing Magnet Assembly Testing White Rodgers ControlMagnet Assembly Testing Robertshaw Control Combination THERMOSTAT/GAS Valve Replacement ECO Energy Cut Off TestingWrench Boss Explosion causing property damage Seal breach may result in a fire orPersonal injury or death Service Procedure RG-VI Main Burner Inspection, Adjustment Cleaning and ReplacementCast Iron Burner Adjustment Feedline Burner Cleaning Service Procedure RG-VII Resetting Thermal Switch Testing and ReplacementResettable Thermal Switch Continuity Testing Over Tighten Screws Resettable Thermal Switch ReplacementService Procedure RG-VIII ScreenLok Flame Arrestor CleaningScreenLok Flame Arrestor Cleaning Service Procedure RG-IX Dip Tube and Anode Inspection and ReplacementDIP Tube Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb